ASX ANNOUNCEMENT 28 AUGUST 2023
Initial, Independent REE-Nb-P-Ti-Sc Resource at C3 – Mangaroon
HIGHLIGHTS
• In less than 12 months from discovery of the C1-C5 carbonatites, a large, independent JORC Code 2012
Inferred Mineral Resource (“Resource”) of 10.84Mt @ 1.00% TREO has been delivered at C3. The Resource
contains a range of critical minerals including rare earths, niobium, phosphate, titanium and scandium (“TREO,
REE-Nb-P-Ti-Sc”).
• These results along with the Yin Ironstone Complex, underscore the global significance of Mangaroon as a
large, long life potential source of critical minerals.
•
The initial C3 Resource covers an area of only ~600 x 550m. With the C1-C5 carbonatites now expanding to
>9kms x 1km under wide-spaced, first-pass drilling, it is expected that the Resource will grow substantially
with future drilling.
Table 1: C3 Inferred Resource as adjusted for different cut-off grades.
Cut-Off
Resource TREO NdPr:TREO Nb2O5
P2O5
TiO2
(%TREO)
(Mt)
(%)
(%)
(%)
(%)
(%)
0.90
5.73
1.18
21
0.25
3.8
5.4
0.70
10.84
1.00
21
0.22
3.5
4.9
0.50
20.55
0.80
21
0.15
3.0
3.9
0.30
45.87
0.58
21
0.10
2.7
3.0
Sc
(ppm)
92
85
68
52
Contained
TREO (t)
67,500
108,000
164,600
265,300
Contained
Nb2O5 (t)
14,500
23,700
31,100
44,800
•
Global REE Resources at Mangaroon now total 30.90Mt @ 1.02% TREO for 314,600t of contained TREOs.
•
The Yin ironstone Resource update remains on track for the December 2023 quarter. The update will include
the high-grade NdPr discoveries at Y2 and Yin North and an increased Indicated component.
Dreadnought Resources Limited (“Dreadnought”) is pleased to announce an initial,
independent REE-Nb-P-Ti-Sc Resource for C3 at Mangaroon (100%), located in the
Gascoyne Region of WA.
Dreadnought’s Managing Director, Dean Tuck, commented: “Since drilling commenced in June 2022, Dreadnought
has delivered its third Resource for the Mangaroon Project bringing the total resources to over 30Mt with further
Resource updates underway and significant exploration upside with first pass drilling still ongoing. The delivery of
the first Resource over the C1-5
Carbonatite Complex also marks the
first polymetallic critical metal
resource with significant Niobium,
Phosphate, Titanium and Scandium
included within the Resource. Further
work will seek to understand the
economic potential of the Project as
we continue to highlight the critical
metal endowment of the Region. We
are proud of how much has been
achieved in such a short space of time
and are looking forward to continuing
to build on this later in 2023.”
Figure 1: Photo of Dreadnought’s
Luke Blais, Matt Crowe and Frank
Murphy first sampling the C1-5
carbonatites at Mangaroon in 2022.
dreadnoughtresources.com.au
1
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
SNAPSHOT – MANGAROON RARE EARTHS
Mangaroon is 100% Owned by Dreadnought
Genuine Scale Potential Already at Yin REE Ironstone Complex
•
Independent Yin Inferred Resource of 20.06Mt @ 1.03% TREO (ASX 4 Jul 2023) covers only ~4km of ~43km of
strike with the initial Indicated Resource of 5.52Mt @ 1.23% TREO covering only ~250m of strike.
•
Exploration Target* of 50-100Mt at 0.9-1.3% TREO estimated for the top 150m of the Yin REE Ironstone
Complex (ASX 13 Feb 2023).
*Cautionary Statement: The Exploration Target has been prepared and reported in accordance with the 2012 edition of the JORC Code. The potential quality
and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Resource for all target areas reported. It
is uncertain if further exploration will result in the estimation of a Resource.
Significant, Critical Minerals Potential at the C1-C7 Carbonatites
•
C1-C7 carbonatites are considered to be the regional source of REE.
• In less than 12 months from discovery of C1-C5, a large, independent Resource of 10.84Mt @ 1.00% TREO
has been delivered at C3. The Resource contains a range of critical minerals including rare earths, niobium,
phosphate, titanium and scandium.
•
The initial C3 Resource covers an area of only ~600m x 550m. With the C1-C5 carbonatites now expanding
to >9kms x 1km under wide-spaced, first pass drilling, it is expected that the Resource will grow substantially
with future drilling.
High-grade, Multi-Metal Potential Including REE (Neodymium, Praseodymium), Phosphate,
Niobium, Titanium & Scandium
•
The mineralisation at the Yin REE Ironstone Complex contains significantly higher NdPr as a fraction of the
rare earth oxides (“NdPr:TREO” ratio) than most other REE deposits globally, over 50% higher than the
global average.
•
Partially completed, first pass, wide spaced drilling over the C1-C7 carbonatites has identified significant critical
metal potential with REE, P, Nb, Ti and Sc within the C1-C5 carbonatites.
Potentially Attractive Mining Proposition
•
At Yin, broad zones of flat to moderate dipping mineralisation with parallel lodes and Resource intensity of
~4.8Mt/km make for a potentially attractive mining proposition.
Positive Metallurgy Results
•
Metallurgical test work from Yin has performed well, achieving recoveries ranging from 85.9% to 92.8% at a
concentrate grade of 10.76% to 15.31% Nd2O3+Pr6O11.
•
REE at Yin is predominantly hosted in monazite which is amenable to commercial processing.
•
Significant metallurgical studies ongoing – results expected throughout 2023.
Global Strategic Imperative Driving Rare Earth Growth & Prices
• Supply chain security and low carbon transition are imperatives against a backdrop of heightened geopolitical
tension.
•
Dreadnought is receiving increasing levels of interest from midstream and downstream industry participants in
Mangaroon. While the current focus is on upstream options (mining, milling and concentrating) opportunities
to collaborate with midstream and downstream industry participants may represent an opportunity.
dreadnoughtresources.com.au
2
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Discussion
In only two years, Mangaroon has emerged as a globally significant, potential source of critical minerals. Milestones
achieved below demonstrate the large scale and the ability for rapid growth at Mangaroon:
-
June 2021 - Outcropping REE were first observed at Mangaroon (ASX 11 Jun 2021).
-
November 2021 - Regional REE source carbonatites were identified at C1-C5 (ASX 29 Nov 2021).
-
June 2022 - Drilling commenced at Yin and identified 2.5km of REE ironstones (ASX 16 Jun 2022).
-
September 2022 - Wide-spaced, RC drilling commenced at C1-C5 (ASX 28 Sep 2022).
-
December 2022 - An initial independent Resource of 14.36Mt @ 1.13% TREO for Yin was estimated (ASX 28
Dec 2022).
-
February 2023 - An Exploration Target of 50-100Mt at 0.9-1.3% TREO was estimated for the top 150m of
the ~43km long Yin REE Ironstone Complex (ASX 13 Feb 2023).
-
July 2023 - The initial independent Resource for Yin was upgraded to 20.06Mt @ 1.03% TREO over only
~4kms of the Yin REE Ironstone Complex – including an Indicated Resource of 5.52Mt @ 1.23% TREO over
just 250m strike (ASX 5 Jul 2023).
-
Aug 2023 - First pass, wide spaced RC drilling extended C1-C5 carbonatites to ~9kms x ~1km (ASX 7 Aug
2023).
Aug 2023 - A large, independent initial Resource of 10.84Mt @ 1.00% TREO was estimated at C3, containing
a range of critical minerals including rare earths, niobium, phosphate, titanium and scandium (ASX 28 Aug 2023).
To date, 687 RC holes (77,597m) and 42 diamond holes (4,806.4m) have been drilled at Yin and at C1-C7.
The C3 Inferred Resource is the first within the carbonatites and contains a high-grade, near surface supergene
component of 10.84Mt @ 1.00% TREO with significant niobium, titanium, phosphate and scandium mineralisation.
Importantly, the C3 Resource is the first from within the recently discovered C1-C5 carbonatites which remains
only partially explored.
As further exploration is undertaken and geological understanding of the region evolves, further discoveries and
Resources within C1-C5 are expected. Future drilling will also further unlock the critical metal potential beyond
rare earths. This work includes targeting of zones with deeper weathering in search of high-grade, supergene
mineralisation.
Assays from drilling at Yin and at C1-C5 will be ongoing throughout 2023.
Figure 2: Photo of Dreadnought’s Claudia Tomkins and Sam Busetti inspecting pXRF results at C3.
dreadnoughtresources.com.au
3
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Material Information Summary – Resource Estimation
Pursuant to ASX listing rule 5.8.1 and complementing JORC Table 1 (attached), Dreadnought advises that the
Resource was estimated by an independent consultant from Widenbar and Associates Pty Ltd (“Widenbar”).
Widenbar worked in conjunction with Dreadnought’s geologists. Commentary on the relevant input parameters for
the Resource process is contained at the end of this announcement.
Location and Region
Mangaroon is located ~250kms south-east of Exmouth, in the Gascoyne Region of Western Australia. The Yangibana
Ironstone Project is Dreadnought’s immediate neighbour and is located to the north of C3 and the Yin Ironstone
Complex on the other side of the Lyons River Fault. Collectively, the Yangibana and Yin Ironstones with the C1-C5
carbonatites are part of the Gifford Creek Carbonatite Complex.
Rare earths within the Gifford Creek Carbonatite Complex were first identified at Yangibana in 1981. However, the
location of the source carbonatite intrusions remained unknown and rare earth ironstones were thought to terminate
south of the Lyons River Fault.
The C3 REE-Nb-P-Ti-Sc Resource is in addition to the previously reported Yin Ironstone Resource of 20.06Mt @
1.03% TREO which only covers ~4km of the ~43km long Yin REE Ironstone Complex.
Geological Interpretation and Wireframing
Mangaroon occurs within the Gascoyne Province of the Capricorn Orogen, situated between the Archean Pilbara
and Yilgarn cratons. The Gascoyne Province consists of a basement suite of Neoarchean to Palaeoproterozoic granite
gneisses that are overlain by various Proterozoic rocks. These Proterozoic rocks include:
•
the 1830–1780 Ma Moorarie Supersuite consisting of granitic rocks;
•
the Durlacher Supersuite, a unit comprising granitic and minor gabbroic intrusions that are heavily deformed
and believed to be largely synchronous with the 1680-1620 Ma Mangaroon Orogeny; and
•
the c. 1680 Ma Pooranoo Metamorphics comprising of pelitic gneiss and metamorphosed feldspathic
sandstones.
REE-bearing ironstones and carbonatites form components of the ~1370 Ma Gifford Creek Carbonatite Complex
(“GCCC”). GCCC is an area surrounding the Lyons River Fault, which is the major crustal structure formed during
the suturing of the Neoarchean Glenburgh Terrane with the Archean Pilbara Craton during the 2215-2145 Ma
Ophthalmian Orogeny.
The rocks of the GCCC include calcite carbonatite, dolomite carbonatite, ankerite-siderite carbonatite, magnetitebiotite dykes, fenites, glimmerites and REE-bearing ironstones, and recently discovered carbonatite plugs. The
previously defined boundary of the GCCC has been significantly expanded due to discoveries by Dreadnought during
2021-2023. The newly defined extent is roughly captured in Figure 3 below. A series of central carbonatite intrusions
(C1-C5) form the central carbonatite intrusive bodies of the region, and the highly fractionated ferrocarbonatite
dykes form cone sheets, radial dykes and ring dykes that splay off the central intrusion.
dreadnoughtresources.com.au
4
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Figure 3: Local geological relationships between central carbonatite plugs C1-C5 and the known ironstones across
the Yin and the nearby Yangibana Projects. The ~4km long Yin ironstone Resource is highlighted. The ironstone
discoveries at Y2, Yin North and Sabre which are to be included in the December 2023 quarter Resource upgrade
are also shown.
C3 has a ferrocarbonatite core bounded by syenite hangingwall and footwall and, more distally, broad dolomitic
magnesiocarbonatite. C3 is blanketed by a predominantly thin layer of transported cover and shows a variable karstic
weathering surface with clays or clay-dominant saprolite extending from 25m to up to 120m vertical depth. A zone
of high-grade REE-P-Nb-Ti-Sc supergene enrichment caps the Fe-Ba rich ferrocarbonatite and extends over the
surrounding syenite and magnesiocarbonatite. REE mineralisation is observed in both the weathered and fresh
portions of the carbonatites. The weathered zone contains both monazite and crandallite while the fresh carbonatite
contains zones of coarse grained (up to 0.25mm) monazite and REE-bearing carbonates. Mineralogy in the
magnesiocarbonatite primarily consists of ferroan dolomite, amphibole (arfvedsonite/riebeckite), and biotite, with
occasional pyrite, ilmenite/rutile, and graphite. The ferrocarbonatite is predominantly ferroan dolomite and biotite
with lesser siderite.
Dreadnought supplied a detailed Digital Elevation Model for the whole of Mangaroon. This was subset into a smaller
version to cover C3.
Two surfaces were interpreted on section representing the base of transported material and the base of supergene.
Material below the base of supergene was considered to be undifferentiated carbonatite.
dreadnoughtresources.com.au
5
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Figure 4: Plan view image showing the supergene domain thickness in relation to drill collars at C3.
Drilling Techniques
Dreadnought’s drilling at C3 was conducted by Ausdrill Limited using reverse circulation (“RC”) drilling and by
Hagstrom Drilling using diamond (“DD”) drilling. In total, 37 RC holes (4,774m) have been drilled, sampled and
assayed to estimate the Resource. In addition, 9 DD holes (1,198.3m) were drilled and sampled to produce samples
for density measurements, ongoing metallurgical testing and additional QAQC analysis.
All holes used in the Resource estimation have been previously announced with the necessary additional collar and
assay details provided. These holes are also shown in Tables 7 to 12.
RC holes were drilled with a 5¾-inch bit and face sampling hammer. RC holes were drilled with some water injection
at the bit for dust suppression and using booster/auxiliary air if ground water was encountered.
DD holes were drilled as orientated HQ and NQ size with no RC pre-collars.
The Resource does not include:
•
the already defined Resources at Yin and Yin South;
•
drilling at the Y2, Yin North, Sabre and Y8 ironstones; and
•
drilling outside of C3 within the C1-C5 carbonatites.
Collar positions were recorded using a Emlid Reach RS2 RTK GPS system (+/- 0.2m x/y, +/-0.5m z).
GDA94 Z50s is the grid format for all xyz data reported.
Azimuth and dip of each drill hole were recorded after the completion of the hole using a Reflex Sprint IQ Gyro. A
reading was undertaken every 30th metre with an accuracy of +/- 1° azimuth and +/-0.3° dip.
Sampling and Subsampling Techniques
RC samples were collected using two techniques being: 1m splits directly from the rig sampling system; and 3m
composite sampling from spoil piles.
From every 1m drilled, a 2-3kg sample (split) was sub-sampled into a calico bag via a Metzke cone splitter or via a
grab sample from the bulk reject in more clay rich material. All remaining spoil from the sampling system was collected
in buckets and deposited in rows adjacent to the rig. An aluminium scoop was used to then sub-sample each spoil
pile to create a 2-3kg 3m composite sample in a calico bag.
dreadnoughtresources.com.au
6
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
The rig geologists used preliminary pXRF analysis of pulverised and partially homogenised reject RC sample piles to
define mineralised zones which were subsequently sampled in detail (the 1m splits). Lower grade and unmineralised
zones were sampled by 3m composites.
All samples were then sent for full analysis at ALS laboratories in Perth and Brisbane. Only laboratory assays were
used for this Resource and no pXRF results have been used.
Industry standard QAQC measures were employed involving insertion of:
•
appropriate CRM standards at regular intervals;
•
field duplicates collected for both 1m splits and 3m composites at regular intervals; and
•
additional field duplicates and blanks collected in mineralised intervals.
All samples were dried and pulverised at the laboratory prior to analysis.
Orientated DD core samples were collected with a diamond drill rig drilling HQ and NQ core. After geological
logging and processing, the core was marked up for sampling at a typical minimal interval of 0.2m to ensure adequate
sample weight and to a typical maximum interval of 1.0m. The selected sample intervals of drill core were cut in half
or quartered along the length of the drill core. Specific gravity, or density measurements, were taken for each
geological domain within the Resource by Dreadnought’s geologists and the laboratory for QAQC.
Sample sizes for both RC and DD are considered appropriate for the style of mineralisation.
Assaying and QAQC
Samples were submitted to the ALS Perth laboratory for preparation and analysis by ME-MS61. Pulverised samples
were then transported to the ALS Brisbane laboratory for analysis by Lithium Borate Fusion XRF (ALS Code “MEXRF30”).
The 2-3kg samples were submitted to the ALS Perth laboratory, oven dried to 105°C and pulverised to 85% passing
75µm to produce a 0.25g charge for determination of 48 multi-elements, including scandium, via 4 acid digestion with
MS/ICP finish (ALS Code ME-MS61). The pulverised sample was then sent to the ALS Brisbane laboratory where a
0.66g charge was used for the determination of REE, niobium, phosphate and titanium Oxides by ME-XRF30 analysis.
QAQC in the form of duplicates and CRM’s (OREAS Standards) were inserted through the mineralised zones at a
rate of 1:50 samples. Additionally, within mineralised zones, a duplicate sample was taken and a blank inserted directly
after. All QAQC returned satisfactory results.
Standard laboratory QAQC is undertaken and monitored.
Further information regarding exploration results can be found in previous announcements:
•
•
•
•
•
•
•
17 October 2022
23 November 2022
24 January 2023
3 April 2023
10 July 2023
17 July 2023
7 August 2023
Mineralised Carbonatites Discovered at C3 and C4
Multiple, Large Scale, REE-Nb-Ti-P Carbonatites
Carbonatite Discovery Shaping up as Regional Rare Earth Source
Carbonatites Deliver Thick, Near Surface REE Results
High Grade Rare Earth & Niobium Zones at C3 & C5
High Grade Rare Earth & Niobium Zones at C3 & C5
Rare Earth Ironstone and Carbonatite Drilling Update
dreadnoughtresources.com.au
7
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Estimation Methodology
Widenbar was retained to produce a Resource estimate for the C3 carbonatite. Validated drillhole data and geological
interpretations were supplied by Dreadnought. Widenbar produced the Resource using standard processes and
procedures including data selection, composting, variography and estimation by Ordinary Kriging prior to model
validation.
Estimates were made and are reported for various oxides being TREO, Nd, Pr and Nd+Pr, Nb, P, Ti and Sc as well
as bulk density.
Statistical Analysis and Variography
The original RC assays are a mixture of 1m and 3m samples, with mineralised intervals identified using preliminary
pXRF analysis and re-assayed at 1m intervals by an independent laboratory. Diamond drilling sample intervals are
variable, corresponding to breaks in lithology and weathering.
For data analysis and Resource estimation processes, all assay data has been composited to 1m intervals.
The base of transported and the base of supergene surfaces were used to apply lithological codes to the composite
data and summary statistics have been calculated for the major elements within each domain. There was a total of
5,689 composites available for use in Resource estimation.
Probability plots and histograms were used to confirm that domaining produced consistent data sets.
There are 266 density measurements from DD core in the final data set. These have been coded with the lithology
wireframes and the weathering surfaces and histograms and statistics have been collated.
The mean, median and the histogram distributions for fresh and oxidised versions of each major lithology have been
reviewed and a single value determined for each weathering/lithology combination.
LITH
DENSITY
Clay
2.00
Supergene
2.00
Carbonatite
3.00
Variograms have been calculated for the combined supergene and carbonatite domains
for the following oxides Nd, Pr and Nd+Pr and TREO and used to control the Ordinary
Kriging estimation process, which was carried out in Micromine 2023 software.
Table 2: Final density values used in converting volumes to tonnes.
Block Model and Resource Estimation
An “empty” rock model was created using the topographic and geology surfaces as constraints.
A process of “unfolding” is applied to the supergene block model and the composite data to avoid issues related to
minor changes in dip. This effectively makes a dynamic search ellipse and all searches become oriented in a simple
vertical direction.
Interpolation is carried out using the Ordinary Kriging process in Micromine 2023. A three-pass search strategy was
used, with the following parameters.
Table 3: Search parameters used in Ordinary Kriging.
Search
Composites
Holes
Search
Pass
Min
Max
Min
Min/Hole
Max/Hole
East
North
RL
1
3
12
2
2
4
100
100
30
2
2
12
1
2
4
100
100
30
3
1
12
1
1
4
150
150
40
Block model validation has been carried out as shown below and all methods produced good comparisons:
•
Drill hole section comparison;
•
Comparison of means for model vs data; and
•
Swathe plots of model vs data.
dreadnoughtresources.com.au
8
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Figure 5: Section 5 showing the grade distribution within the Resource model with mineralisation near surface.
Figure 6: Section 7 showing higher grades hosted within a zone of deeper weathering (karst).
Cut-off Grade
A range of cutoffs between 0.3% and 0.9% TREO has been adopted for summary reports as detailed mining and
processing costs, recoveries and product prices are not fully known at this stage of the project.
dreadnoughtresources.com.au
9
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Resource Classification
The Resource has been classified in the Inferred category, in accordance with the 2012 Australasian Code for
Reporting of Mineral Resources and Ore Reserves (2012 JORC Code). A range of criteria has been considered in
determining this classification including:
•
Geological continuity;
•
Data quality;
•
Drill hole spacing;
•
Modelling technique; and
•
Estimation properties including search strategy, number of informing data and average distance of data from
blocks.
The Resource classification methodology incorporated a number of parameters derived from the Ordinary Kriging
algorithms in combination with drill hole spacing and continuity and size of mineralised domains.
Geological Continuity
Geological continuity is understood with reasonable confidence. The classification reflects this level of confidence.
Data Quality
Resource classification is based on information and data provided from Dreadnought’s database. Descriptions of
drilling techniques, survey, sampling/sample preparation, analytical techniques and database management/validation
indicate that data collection and management is well within industry standards. Widenbar considers that the database
represents an accurate record of the drilling undertaken.
Drilling Spacing
Drill hole location plots have been used to ensure that local drill spacing conforms to the minimum expected for
Resource classification. Sections are drilled at a nominal 80m by 80m spacing.
Figure 7: Plan view image showing the drill hole spacings and section locations within the modelling area.
dreadnoughtresources.com.au
10
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Resource Estimate
A summary of the C3 Resource of 10.84Mt @ 1.00% TREO is shown below. A range of cutoffs between 0.3% and
0.9% TREO has been adopted for summary reports as detailed mining and processing costs, recoveries and product
prices are not fully known at this stage of the project. Numbers may not add up due to rounding.
Table 4: Summary of the C3 Inferred Resource at 0.20% TREO Cut-off.
Cut-Off
Resource TREO NdPr:TREO Nb2O5
P2O5
TiO2
(%TREO)
(Mt)
(%)
(%)
(%)
(%)
(%)
0.90
5.73
1.18
21
0.25
3.8
5.4
0.70
10.84
1.00
21
0.22
3.5
4.9
0.50
20.55
0.80
21
0.15
3.0
3.9
0.30
45.87
0.58
21
0.10
2.7
3.0
Sc
(ppm)
92
85
68
52
Contained
TREO (t)
67,500
108,000
164,600
265,300
Contained
Nb2O5 (t)
14,500
23,700
31,100
44,800
Metallurgy
At this stage, no metallurgical testwork has been carried out on samples from C3. However, samples for mineralogical
study have confirmed the presence of monazite as a dominant REE bearing mineral in the oxide material, and monazite
and REE carbonates in the fresh material.
Samples for metallurgical study have been collected and are being assessed for performance with the existing
flowsheet developed for the nearby Yangibana REE project as well as for a deposit specific optimised flowsheet. This
work is ongoing.
Reasonable Potential of Eventual Economic Extraction
Consideration has been given to assess whether the prospects of eventual economic extraction are reasonable for
C3. An order of magnitude pit optimisation was carried out using costs and prices similar to those in publicly available
documents for the nearby Yangibana REE project.
The optimum pit includes almost all of the Inferred Resource at C3, only leaving a minor amount of low-grade
material at the edges and base of the model.
On this basis, the Competent Person considers the prospects for economic extraction to be reasonable and
considers that the global Inferred Resource can be reported.
Figure 8: Section 5 showing the conservative boundaries of the Inferred Resource area in relation to drilling.
dreadnoughtresources.com.au
11
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Impact on Long Term Incentive Plan
The following table outlines the Company’s Long-Term Incentive (“LTI”) plan with all performance shares now
vested due to announcing an Inferred JORC Resource of 30Mt @ >1% TREO by 31 December 2024. Reaching this
large scale Resource target over a year ahead of original expectations further demonstrates the ability for rapid
growth at Mangaroon. This combined with a suite of critical minerals highlights Mangaroon as a globally significant,
potential source of critical minerals.
The capital structure following issue of the LTI performance shares is outlined below.
Table 5: LTI Plan summary.
Performance Rights
Quantity
Class A
10,183,335
Class B
13,800,001
Class C
13,799,996
Vesting Condition
The Company announcing an Inferred JORC Resource of 10Mt @
>1% TREO by 31 December 2022.
All Class A Performance Rights have been exercised.
The Company announcing an Inferred JORC Resource of 20Mt @
>1% TREO by 31 December 2023.
The Company announcing an Inferred JORC Resource of 30Mt @
>1% TREO by 31 December 2024.
Vested
Yes
Yes
Yes
Capital Structure (Upon issue of vested Class A, B and C Performance Rights)
Table 6: Capital structure following issue of Class A, B and C performance shares.
Quoted Securities
Fully Paid Ordinary Shares
3,359,328,217
Unquoted Securities
Options @ $0.005 expiring 09/04/2024
30,000,000
Options @ $0.005 expiring 30/06/2024
1,500,000
Options @ $0.04 expiring 02/07/2024
12,100,000
Options @ $0.06 expiring 11/08/2024
2,000,000
Options @ $0.06 expiring 26/11/2024
2,000,000
Options @ $0.065 expiring 14/07/2025
8,500,000
Options @ $0.1575 expiring 16/12/2025
853,098
Options @ $0.12 expiring 02/03/2026
1,223,151
Options @ $0.075 expiring 14/06/2026
2,000,000
Further information regarding the LTI plan can be found in previous announcements:
DRE Announcement 31 October 2022: Annual General Meeting – Notice and Proxy Form
DRE Announcement 17 August 2022: Long-Term Incentives on Delivery of Significant REE Resources
dreadnoughtresources.com.au
12
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Background on Mangaroon (E08/3274, E8/3178, E09/2384, E09/2433, E09/2473: FQM Earn-in) (E08/3275, E08/3439,
E09/2290, E09/2359, E09/2370, E09/2405, E09/2448, E09/2449, E09/2450, E09/2467, E09/2478, E09/2531, E09/2535,
E09/2616, M09/91, M09/146, M09/147, M09/174, M09/175: 100%)
Mangaroon covers >5,200sq kms of the Mangaroon Zone in the Gascoyne Region of Western Australia. Part of the
project is targeting Ni-Cu-PGE and is subject to First Quantum Minerals Ltd (“FQM”) earning up to 70% (Figure 9).
The region is also host to high-grade gold mineralisation at the Bangemall/Cobra and Star of Mangaroon gold mining
centres and the high NdPr:TREO ratio Yin and Yangibana REE deposits.
Dreadnought has located outcropping high-grade gold bearing quartz veins along the Edmund and Minga Bar Faults,
outcropp
Share your feedback
Discover