Outcropping Gossan & Large EM Anomalies at Bordah
Released
Released
Announcement PDF
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
ASX ANNOUNCEMENT 7 November 2024
Outcropping Gossan & Large EM Anomalies at Bordah – Mangaroon (100%)
HIGHLIGHTS
•
Following identification of a VMS system at Tiger, a versatile time domain electromagnetic
(“VTEM”) survey was flown over Mangaroon targeting massive sulphides.
•
The survey was flown over two areas with similar lithostructural settings and stream sediment
anomalism considered favorable for massive sulphides, being Tiger and Bordah.
•
Bordah is a ~12km x 6km camp scale prospect with strong gold, base metal and pathfinder
anomalism with a similar interpreted lithostructural setting to Tiger.
•
The VTEM survey identified three anomalies over ~900m strike at Bordah, in an area with no
previous base metal exploration. Field reconnaissance of the anomalies resulted in the
identification of a subcropping gossan horizon over ~200m of strike with initial rock chips
confirming base metal mineralisation including:
BEM001: 6.6% Cu, 0.7% Pb, 5.1g/t Ag, 0.1g/t Au
•
Initial wide spaced soils over the three VTEM anomalies and follow up stream sediment sampling
has been completed at Bordah. Detailed mapping and surface sampling are underway.
• Additional mapping and surface sampling are underway with results in December 2024. Drill targets
are expected during the March 2025 quarter.
Dreadnought Resources Limited (“Dreadnought”) is pleased to announce the identification
of a new outcropping base metal gossan and coincident VTEM anomalies at the Bordah
prospect, part of the Mangaroon Gold Project (100%), located in the Gascoyne Region of
Western Australia.
Dreadnought’s Managing Director, Dean Tuck,
commented: “Target generation and definition work
at Mangaroon continues to deliver. While our focus
remains on building a pipeline of gold targets as part
of our gold commercialisation and self-funded explorer
strategy, we will continue to assess and include base
metal and other compelling targets as part of our
greenfield exploration efforts at Mangaroon. To have a
base metal target already generated at Bordah is
extremely encouraging, considering we haven’t even
completed follow up stream sediment sampling yet.
We are thrilled to have early targets that underscore
our belief that these camp scale prospects such as
Bordah, High Range and others will deliver a strong
pipeline of targets that could become our next
discovery at Mangaroon.”
Figure 1: Photo of rock chip BEM001 showing
secondary copper oxides and carbonates coating an
iron rich gossan. BEM001 returned assay of 6.6% Cu,
0.7% Pb, 5.1g/t Ag, 0.1g/t Au.
dreadnoughtresources.com.au
1
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Bordah Camp Scale Prospect (100%)
Bordah is a ~12km x 6km camp scale prospect defined by strong gold, base metal and pathfinder stream sediment anomalism
with a similar interpreted lithostructural setting to Tiger and the wider Star of Mangaroon gold camp.
Given the prospectivity for VMS mineralisation, a VTEM survey was flown over Bordah to identify conductive anomalies for
follow up target definition work. The VTEM survey identified a string of strong conductors covering ~900m of strike in an
area of no previous base metal exploration. The significance of the anomalism at Bordah is underscored by the lack of a
conductive VTEM anomaly at Tiger. Significant Cu-Au-Ag-Pb Zn mineralisation has already been demonstrated at Tiger
(ASX.DRE 29 October 2024) which indicates that there is even stronger mineralisation potential at Bordah.
In addition, recent site activities resulted in the identification of ~200m of subcropping gossan which appears even more
substantial than the initial gossans at Tiger. Rock chips from the subcropping gossan returned significant results including:
BEM001: 6.6% Cu, 0.7% Pb, 5.1g/t Ag, 0.1g/t Au
Additional mapping and surface sampling are underway with results in December 2024. Drill targets are expected during the
March 2025 quarter.
Bordah also remains highly prospective for gold.
Figure 2: Plan view image of the Channel 40 (late time) VTEM anomalies at Bordah showing the location of rock chip assays along the
currently mapped ~200m subcropping gossanous horizon.
dreadnoughtresources.com.au
2
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Other Camp Scale Prospects (100%)
Target generation and definition work continues across Mangaroon focused on gold and base metals. Each of these prospects
are defined by prospective
lithostructural settings and
anomalous
gold
and
pathfinder stream sediment
anomalism.
Each prospect is currently at
a different level of target
generative work with crews
currently in the field
advancing each prospect
towards drilling in 2025. A
summary of the prospects is
located below.
Figure 3: Plan view
image of a portion of
Mangaroon highlighting
the main gold and base
metal camp scale
prospects which are the
focus of ongoing target
generation and
definition work.
Table 1: Description of current camp scale prospects and status of target generation work.
Camp Scale Prospect
Detailed
Magnetics
Stream
Sediments
Star of Mangaroon
Completed
Completed
Bordah
High Range
Completed
Completed
Minga Bar
Completed
Completed
Jimmy Well
Completed
Completed
Soils
Underway
Mapping
Underway
Rock
Chipping
Underway
Targets
Star of Mangaroon,
Tiger, Hudson, Two
Peaks, Pritchard’s, Lead
Gold Mine, Popeye
Inevitable
Two Peaks Copper
Nail, Cullens, Midday
Underway
Underway
Underway
Moon, Midnight Star
Diamonds
Not Commenced Not Commenced Not Commenced
Results Pending
Underway
Underway
Underway
Underway Not Commenced Not Commenced Results Pending
dreadnoughtresources.com.au
3
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
SNAPSHOT – MANGAROON GOLD (100%)
Mangaroon Gold is 100% Owned by Dreadnought
•
Mangaroon covers >5,300km2 with an initial focus on the ~15km x 10km gold system situated over the Mangaroon
Shear Zone between the crustal scale Minga Bar and Edmund Faults with multiple phases of intrusions. Numerous
historical workings along the Mangaroon Shear Zone have only seen limited, shallow drilling along ~200m of strike
near the Star of Mangaroon mine.
Self-Funded Explorer Strategy
•
Dreadnought’s strategy is to transform into a self-funded explorer. This involves a potential high-grade open pit
at the Star of Mangaroon where funding, development, haulage & processing are outsourced to third parties. This
is a common model in WA given the robust gold price. Once successful, extend this model to Popeye, Two Peaks,
Lead, Pritchard Well, etc. In this way, there is reduced reliance on market funding and internal cashflows are
aimed at making life changing discoveries.
Consolidation Provides for First Ever Modern Exploration
•
All historical workings and known gold occurrences relate to outcropping mineralisation. There has been minimal
historical and modern exploration due to fractured, small-scale ownership with Dreadnought now undertaking
modern exploration for the first time.
Significant, Step-change, Growth Potential
•
Five historical mines developed on outcropping mineralisation and dozens of gold occurrences along highly
prospective structural corridors.
•
Dreadnought is deploying modern geochemical and geophysical techniques to explore for mineralisation under
shallow cover. These techniques have already generated new prospects with stronger and larger signatures than
the historical mines, including the region’s largest high-grade producer at the Star of Mangaroon mine.
•
Project-wide stream sediment sampling and geophysical surveys have identified additional camp scale prospects
at Bordah and High Range.
Shallow, High-grade Gold
•
The Star of Mangaroon deposit contains significant shallow high-grade gold intersections including (ASX: 6 Jun 2023, 4
Sep 2023, 11 Dec 2023, 22 Jan 2024):
SOMRC004: 9m @ 13.4 g/t Au from 9m including 2m @ 59.4g/t Au from 16m
SOMRC005: 7m @ 23.0 g/t Au from 53m including 3m @ 48.9g/t Au from 54m
SOMRC006: 8m @ 15.5 g/t Au from 89m including 3m @ 30.4g/t Au from 90m
•
Popeye, located <1km from the Star of Mangaroon, contains significant shallow high-grade gold intersections
including:
POPRC001: 3m @ 22.8 g/t Au from 13m POPRC002: 1m @ 1.6 g/t Au, 15.5g/t Ag from 11m
Exceptional Metallurgical Recoveries
•
The region is known for its free gold. Accordingly, recent metallurgical work at Star of Mangaroon produced
exceptional recoveries from standard gravity and carbon in leach circuits averaging 96.7% combined recovery
including an average 74.4% gravity recovery (ASX.DRE 14 October 2024).
dreadnoughtresources.com.au
4
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Background on Mangaroon (E8/3178, E08/3229, E08/3274, , E08/3275, E08/3439, E09/2290, E09/2359, E09/2370,
E09/2384, E09/2405, E09/2422, E09/2433, E09/2448, E09/2449, E09/2450, E09/2467, E09/2473, E09/2478, E09/2535,
E09/2616, M09/91, M09/146, M09/147, M09/174, M09/175: 100%)
Mangaroon (Figure 4) covers >5,300kms2 of the Mangaroon Zone in the Gascoyne Region of Western Australia and
is comprised of:
-
>45km long Money Intrusion (Ni-Cu-Co-PGE): containing high tenor magmatic Ni-Cu-Co-PGE.
-
~10km x 15km Mangaroon Gold Camp (Au, Cu-Zn-Ag-Au): where fractured, small-scale ownership has
limited previous gold exploration with only ~200m of the >12km long Mangaroon Shear Zone having been
drilled.
-
~43km long Yin Ironstone (REE): which already contains: an independent Resource of 20.06Mt @ 1.03%
TREO (ASX 5 Jul 2023) over only ~4km of the ~43km of ironstones including an initial Indicated Resource of
5.52Mt @ 1.23% TREO over only ~250m of strike (ASX 5 Jul 2023).
-
~17km long Gifford Creek Carbonatites (REE-Nb-Ti-P-Sc): which contains a suite of critical minerals and an
initial independent Inferred Resource of 10.84Mt @ 1.00% TREO at C3 (ASX 28 Aug 2023).
Figure 4: Plan view map of Dreadnought’s 100% owned Mangaroon projects: the >45km long Money Intrusion (Ni-Cu-CoPGE); the ~10km x 15km Mangaroon gold camp (Cu-Zn-Ag-Au); Yin Ironstone Complex (REE) and the Gifford Creek
Carbonatites (REE-Nb-Ti-P-Sc) in relation to major structures, geology and roads.
dreadnoughtresources.com.au
5
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
UPCOMING NEWSFLOW
November: Results of further target generation and definition work at Mangaroon Au (100%)
November: Results from EIS co-funded IP surveys at Tarraji-Yampi (80%/100%)
November: Initial Resource for Star of Mangaroon (100%)
28 November: Annual General Meeting
December: Results of further target generation and definition work at Mangaroon Au (100%)
December: Results of target generation and definition work at Bordah – Mangaroon Au and Cu (100%)
For further information please refer to previous ASX announcements:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
25 November 2020
15 March 2021
7 April 2021
17 May 2021
12 September 2022
7 June 2023
4 September 2023
1 November 2023
11 December 2023
22 January 2024
12 February 2024
13 March 2024
20 May 2024
27 May 2024
18 June 2024
26 July 2024
26 July 2024
1 October 2024
14 October 2024
2 September 2024
29 October 2024
Mangaroon Ni-Cu-PGE & Au Project
Exploration Commences at Mangaroon Ni-Cu-PGE & Au Project
Option/JV Agreement Signed with Global Base Metal Miner
Update on Mangaroon Ni-Cu-PGE & Au Project
Star of Mangaroon Acquisition & Consolidation
Mangaroon Gold Review and Further Consolidation
Outstanding Gold Opportunities Along >10km Mangaroon Shear Zone
Gold Drilling Commenced at Star of Mangaroon
Thick, High-Grade Gold Including 7m @ 23.0g/t Au
Star of Mangaroon Extended
Star of Mangaroon Camp Scale Prospect Continues to Expand
Star of Mangaroon Camp Scale Gold Prospect Expands to ~15km x 10km
Outcropping Cu-Zn-Ag-Au Gossans at Tiger
High Grade Cu-Zn-Ag-Au Gossans at Tiger
Tiger Cu-Au-Zn-Ag Gossan Confirmed over 500m
Strategic & Prospective Consolidation
Consolidation, Growth & Commercialisation
Shallow, High-Grades at Star of Mangaroon & Popeye
Exceptional Gold Recoveries from Star of Mangaroon
Drill Results & 5 Off-Hole Conductors at Tiger
Further Base Metal Mineralisation from Tiger
~Ends~
For further information please contact:
Dean Tuck
Managing Director
Dreadnought Resources Limited
E: dtuck@dreres.com.au
Jessamyn Lyons
Company Secretary
Dreadnought Resources Limited
E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
dreadnoughtresources.com.au
6
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forwardlooking information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and
uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. There are a number of
risks, both specific to Dreadnought, and of a general nature which may affect the future operating and financial performance of Dreadnought,
and the value of an investment in Dreadnought including and not limited to title risk, renewal risk, economic conditions, stock market
fluctuations, commodity demand and price movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks,
operational risks, reliance on key personnel, reserve estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and
mining development, construction and commissioning risk.
Competent Person’s Statement – Mineral Resources
The information in this announcement that relates to Mineral Resources is based on information compiled by Mr. Lynn Widenbar, a Competent
Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Widenbar is a full-time employee of Widenbar and
Associates Pty Ltd. Mr. Widenbar has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity that is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Minerals Resources and Ore Reserves’. Mr. Widenbar consents to the inclusion in the announcement of the
matters based on his information in the form and context that the information appears.
Competent Person’s Statement – Exploration Results and Exploration Targets
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled by Mr.
Dean Tuck, who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'.
Mr. Tuck consents to the inclusion in the announcement of the matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information included in the
original market announcements by Dreadnought Resources Limited referenced in this report and in the case of Mineral Resources, that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and
have not materially changed. To the extent disclosed above, the Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcements.
RESOURCES SUMMARY
Yin Ironstone Complex – Yin, Yin South, Y2, Sabre Measured, Indicated and Inferred Resources
Table 2: Summary of Yin Resources at 0.20% TREO Cut-off.
Resource
Classification
Geology
Measured
Measured
Measured
Indicated
Indicated
Indicated
Inferred
Inferred
Inferred
Total
Total
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
Resource
(Mt)
TREO
(%)
Nd2O3+Pr6O11
(kg/t)
NdPr:TREO
Ratio (%)
Contained
TREO (t)
Contained
Nd2O3+Pr6O11 (t)
2.47
2.70
5.17
13.46
7.67
21.13
1.51
2.17
3.68
17.44
12.54
29.98
1.61
1.09
1.34
1.06
0.95
1.02
0.75
0.75
0.75
1.11
0.95
1.04
4.6
3.0
3.8
3.1
2.8
3.0
1.9
2.1
2.0
3.2
2.7
2.9
29
27
28
29
29
29
25
28
27
29
29
29
39,700
29,500
69,300
142,600
72,800
215,400
11,200
16,300
27,600
193,600
118,700
312,300
11,400
8,100
19,500
41,000
21,300
62,300
2,800
4,500
7,300
55,300
33,900
89,300
TOTAL
Gifford Creek Carbonatite – Inferred Resource
Table 3: Summary of the Gifford Creek Carbonatite Inferred Resource at various % TREO Cut-offs.
Cut-Off
(%TREO)
Resource
(Mt)
TREO
(%)
NdPr:TREO
(%)
Nb2O5
(%)
P2O5
(%)
TiO2
(%)
Sc
(ppm)
Contained
TREO (t)
Contained Nb2O5
(t)
0.90
0.70
0.50
0.30
5.73
10.84
20.55
45.87
1.18
1.00
0.80
0.58
21
21
21
21
0.25
0.22
0.15
0.10
3.8
3.5
3.0
2.7
5.4
4.9
3.9
3.0
92
85
68
52
67,500
108,000
164,600
265,300
14,500
23,700
31,100
44,800
dreadnoughtresources.com.au
7
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
INVESTMENT HIGHLIGHTS
Mangaroon Au, Nb-REE, Ni-Cu-PGE Project (100%)
Mangaroon covers ~5,300kms2 and is located 250kms
south-east of Exmouth in the Gascoyne Region of WA.
At Mangaroon, Dreadnought has consolidated areas of
outcropping high-grade gold and historical high grade
gold mines including the historic Star of Mangaroon and
Diamond gold mines. Exploration at the Money Intrusion
has identified high tenor Ni-Cu-PGE sulphides. In
addition, Mangaroon has emerged as a globally
significant, rapidly growing, potential source of critical
minerals. Highlights include:
•
An independent Resource for Yin Ironstones
Complex of 29.98Mt @ 1.04% TREO over only
~4.6kms – including a Measured and Indicated
Resource of 26.3Mt @ 1.04% TREO (ASX 30 Nov
2023).
•
Discovery of the globally significant, Nb-REE-P-TiSc enriched Gifford Creek Carbonatite (ASX 7 Aug
2023).
•
A large, independent initial Resource of 10.84Mt @
1.00% TREO at the Gifford Creek Carbonatites,
containing a range of critical minerals including rare
earths, niobium, phosphate, titanium and scandium
(ASX 28 Aug 2023).
Kimberley Ni-Cu-Au Project (80/100%)
The project is located only 85kms from Derby in the
West Kimberley region of WA and was locked up as a Defence Reserve since 1978.
The project has outcropping mineralisation and historical workings which have seen no modern exploration.
Results to date indicate that there may be a related, large scale, Proterozoic Cu-Au VMS system at Tarraji-Yampi,
similar to DeGrussa and Monty in the Bryah Basin.
Central Yilgarn Gold, Base Metals, Critical Minerals & Iron Ore Project (100%)
Central Yilgarn is located ~190km northwest of Kalgoorlie in the Yilgarn Craton. The project comprises ~1,400kms2
covering ~150km of strike along the majority of the Illaara, Yerilgee, South Elvire and Evanston greenstone belts.
Central Yilgarn is prospective for typical Archean mesothermal lode gold deposits, VMS base metals, komatiitehosted nickel sulphides and critical metals including Lithium-Cesium-Tantalum.
Prior to consolidation by Dreadnought, the Central Yilgarn was predominantly held by iron ore explorers and
remains highly prospective for iron ore.
Bresnahan HREE-Au-U Project (100%)
Bresnahan is located ~125km southwest of Newman in the Ashburton Basin. The project comprises ~3,700kms2
covering over 200kms strike along the Bresnahan Basin / Wyloo Group unconformity. Bresnahan is prospective for
unconformity related heavy rare earth (“HREE”) deposits similar to Browns Range HREE deposits, unconformity
uranium (“U”) deposits and mesothermal lode gold similar to Paulsens Au-Ag-Sb deposits along strike.
Prior to consolidation by Dreadnought, the Bresnahan Basin had been successfully explored for unconformity
uranium with limited exploration for mesothermal gold. Bresnahan is a first mover opportunity to explore for
unconformity HREE.
dreadnoughtresources.com.au
8
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Table 4: Significant Rock Chips >0.1% Cu or Zn with >1% Cu or Zn highlighted (GDA94 z50).
Sample ID
BEM001
BEM002
BEM004
Easting
Northing
Sample Description
336877
7364346
336874
336784
7364346
7364311
Gossan with secondary
copper oxides
Gossan
Gossan
Cu
(%)
Zn
(%)
Pb
(%)
Ag
(g/t)
Au
(g/t)
6.6
-
0.7
5.1
0.14
0.1
-
-
0.7
1.4
6.8
7.0
0.14
-
Prospect
Bordah Inevitable
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are Material
to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Rock Chips
Rock Chips were collected by Dreadnought staff and
submitted for analysis. Rock chips are random, subject to
bias and often unrepresentative for the typical widths
required for economic consideration. They are by nature
difficult to duplicate with any acceptable form of precision or
accuracy.
Rock chips have been collected by Dreadnought to assist in
characterising different lithologies, alterations and
expressions of mineralisation. In many instances, several
rock chips were collected from a single location to assist
with characterising and understanding the different
lithologies, alterations and expressions of mineralisation
present at the locality.
Rock chips were submitted to ALS Laboratories in Perth for
determination of gold by fire assay and ICP-MS finish (ALS
Method Au-ICP22) and 48 other elements by four acid
digest and ICP-MS finish (ALS Method ME-MS61).
VTEM
Versatile time domain electromagnetic (VTEM) and
aeromagnetic data was flown by UTS Geophysics using an Astar 350 B3 helicopter with a VTEM max receiver and
transmitter and Geometrics caesium vapour magnetic
sensor.
The VTEM Max survey was flown at 200m line spacings in a
north-south orientation at Bordah and northeast-southwest
orientation at Tiger for a total of 983 flight kms. The terrain
clearance for the helicopter was 83m, the EM sensor at 35m
and magnetic sensor at 73m.
Given the normal airspeed for a helicopter of 80100km/hour and a data recording rate of 0.1 points per
second, geophysical measurements are acquired
approximately every 2-4m along the survey line.
The VTEM Max configuration was:
Drilling techniques
Drill sample recovery
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so,
by what method, etc.).
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
dreadnoughtresources.com.au
-
Transmitter loop diameter: 35m
-
Peak dipole movement – 7000,000NIA
-
Transmitter Pulse Width: 7ms
VTEM Max Receiver: Z, X coils (Y Optional)
No drilling undertaken.
No drilling undertaken.
9
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Criteria
JORC Code explanation
Logging
Sub-sampling
techniques and sample
preparation
Quality of assay data
and laboratory tests
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc.) photography.
The total length and percentage of the relevant intersections
logged.
If core, whether cut or sawn and whether quarter, half or all
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
Measures taken to ensure that the sampling is representative
of the in-situ material collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
Commentary
No drilling undertaken.
Rock Chips
Entire rock chips were submitted to the lab for sample prep
and analysis.
Rock Chips
Assay technique is Fire Assay which is a ‘Total Technique’
for Au. Four acid digest is considered a ‘near total’ technique
for the 48 elements received under ME-MS61.
Standard laboratory QAQC is undertaken and monitored by
the laboratory and by the company upon assay result
receival.
VTEM
The VTEM Max survey was flown at 200m line spacings in a
north-south orientation at Bordah and northeast-southwest
orientation at Tiger for a total of 983 flight kms. The terrain
clearance for the helicopter was 83m, the EM sensor at 35m
and magnetic sensor at 73m.
Given the normal airspeed for a helicopter of 80100km/hour and a data recording rate of 0.1 points per
second, geophysical measurements are acquired
approximately every 2-4m along the survey line.
The VTEM Max configuration was:
Verification of sampling
and assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
-
Transmitter loop diameter – 35m
-
Peak dipole movement – 7000,000NIA
-
Transmitter Pulse Width – 7ms
-
VTEM Max Receiver – Z, X coils (Y Optional)
Transmitter base frequency – 25 Hz
Rock Chips
All significant results are revisited with follow up sampling
and mapping.
Geochemical sample coordinates and geological information
is written in field books and coordinates and track data
saved from handheld GPSs used in the field.
Field data is entered into excel spreadsheets and then loaded
into a geological database.
Location of data points
Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
dreadnoughtresources.com.au
All sample locations were recorded with a Garmin handheld
GPS which has an accuracy of +/- 5m.
GDA94 MGAz50.
VTEM
The VTEM survey used a NovaTel WAAS GPS reciver with
positional accuracy of <1.8m
10
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Criteria
JORC Code explanation
Commentary
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Sample spacing and distribution is not sufficient to establish
the degree of geological and grade continuity appropriate for
a Mineral Resource.
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
The measur
Share your feedback
Discover