ASX ANNOUNCEMENT 6 May 2024
Major Commercialisation Milestone
High Quality, Mixed Rare Earth Carbonate – Mangaroon (100%)
HIGHLIGHTS
•
In November 2023, monazite concentrate from the Yin REE project was provided to ANSTO
for metallurgical testing through a conventional acid bake/leach process to produce a mixed
rare earth carbonate (“MREC”). MRECs are used as raw materials for midstream processors
to separate individual rare earth oxides, in this case NdPr.
•
ANSTO has world-leading expertise in the processing of critical and strategic metals such as
rare earths and has successfully produced a high quality MREC from Yin concentrate. ANSTO
concluded “the DRE concentrate is well suited for processing via a conventional acid
bake/leach process in ANSTO’s experience”.
•
Applying a conventional low-temperature acid bake/leach process, ANSTO achieved the
following key results:
o
~94% recovery of Nd and Pr from concentrate through to MREC.
o
MREC grade of 60.7% TREO containing 16.3% Nd2O3 and 4.4% Pr6O11
o
The NdPr oxide ratio is high at 34% of the total TREO
•
This is a milestone achievement in commercialisation for Yin and in progressing discussions
with rare earth refiners.
•
ANSTO also observed that ongoing metallurgical optimisation work can be expected to
further improve recoveries and MREC quality.
Dreadnought Resources Limited (“Dreadnought”) is pleased to announce that worldleading metallurgical group, ANSTO, has produced a high quality MREC from Yin
monazite concentrate using a conventional, low-temperature, acid bake/leach process.
Yin is part of the 100% owned Mangaroon REE Project located in the Tier 1 jurisdiction
of Western Australia.
Dreadnought’s Managing Director,
Dean Tuck, commented: “This is a
significant milestone for Dreadnought
and the Yin REE Project. ANSTO is a
world-leader in its field and has
demonstrated that the monazite
concentrate has excellent metallurgical
recoveries using a conventional process
that results in a high quality MREC.
Ongoing metallurgical optimisation work
is expected to further improve these
results. With these results in hand, we
are well placed to advance discussions
with a range of downstream partners.”
Figure 1: Photo of the high quality
MREC produced by ANSTO using a
conventional low-temperature acid
bake/leach process.
dreadnoughtresources.com.au
1
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
SNAPSHOT – MANGAROON CRITICAL MINERALS
Mangaroon is 100% Owned
•
100% owned Mangaroon confirmed as a globally significant critical minerals complex with a combined Resource
at Yin and the Gifford Creek Carbonatite of 40.82Mt @ 1.03% TREO.
Genuine Scale Potential Already at Yin
•
Independent Yin Resource of 29.98Mt @ 1.04% TREO (ASX 30 Nov 2023) covers only ~4.6km of ~43km of strike 87% Measured and Indicated.
•
Large JORC Exploration Target for the top 150m of the Yin REE Ironstone Complex (ASX 13 Feb 2023) to be updated
in 2024.
Cautionary Statement: The Exploration Target has been prepared and reported in accordance with the JORC Code 2012. The
potential quality and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to estimate
a Resource for all target areas reported. It is uncertain if further exploration will result in the estimation of a Resource.
Significant, Step-Change, Growth Potential at the Gifford Creek Carbonatite
•
The Gifford Creek Carbonatite is considered to be the regional source of REE.
•
In less than 12 months from discovery of the Gifford Creek Carbonatite, a large, independent Resource of 10.84Mt
@ 1.00% TREO was delivered (ASX 28 Aug 2023). The Resource contains a range of critical minerals including rare
earths, niobium, phosphate, titanium and scandium.
•
The initial Resource covers an area of only ~600m x 550m. With the Gifford Creek Carbonatite now expanding
to >17kms x 1km under wide-spaced, first pass drilling, it is expected that the Resource will grow substantially
with future drilling.
High-grade, Multi-Metal Potential Including REE (Neodymium, Praseodymium), Phosphate,
Niobium, Titanium & Scandium
•
The mineralisation at the Yin REE Ironstone Complex contains significantly higher NdPr as a fraction of the rare
earth oxides (“NdPr:TREO” ratio) than most other REE deposits globally; over 50% higher than the global
average.
Potentially Attractive Mining Proposition
•
At Yin, broad zones of flat to moderate dipping mineralisation with parallel lodes and Resource intensity of
~4.8Mt/km make for a potentially attractive mining proposition. This is further demonstrated by an initial
Measured Resource of 5.17Mt @ 1.34% TREO over just ~250m of strike at Yin where the thick, high-grade
Resource occurs at surface.
Positive Metallurgy Results
•
Metallurgical test work from Yin has performed well, achieving recoveries ranging from ore to concentrate of
85.9% to 92.8% at a concentrate grade of 10.5% to 15.3% Nd2O3+Pr6O11.
•
REE at Yin is predominantly hosted in monazite which is amenable to commercial processing.
•
ANSTO, a world-leader in in the processing of critical and strategic metals, has demonstrated that the Yin
monazite concentrate has excellent metallurgical recoveries using a conventional process and produces a high
quality MREC. Ongoing metallurgical optimisation work is expected to further improve these results.
Global Strategic Imperative Driving Rare Earth Growth & Prices
•
Supply chain security and low carbon transition are imperatives against a backdrop of heightened geopolitical
tension.
•
Dreadnought is receiving increasing levels of interest from midstream and downstream industry participants in
Mangaroon. While the current focus is on upstream options (mining, milling and concentrating), opportunities to
collaborate with midstream parties are advancing.
dreadnoughtresources.com.au
2
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Background
To date, Dreadnought has focused on upstream activities (mining, milling and concentrating) at the Mangaroon
REE Project. Conclusions to date include:
• At Yin, broad zones of flat to moderate dipping mineralisation with parallel lodes and Resource intensity of
~4.8Mt/km make for a potentially attractive mining proposition; and
• REE at Yin is predominantly hosted in monazite from which metallurgical test work has performed well,
achieving high recoveries (85.9% to 92.8%) and concentrate grades (10.5% to 15.3% Nd2O3+Pr6O11).
The ANSTO results are a significant milestone for the Mangaroon REE Project as they now advance the project
from the upstream to the midstream stage.
ANSTO is a world-leader in its field and has demonstrated that the monazite concentrate has excellent
metallurgical recoveries using a conventional process producing a high quality MREC. Ongoing metallurgical
optimisation work is expected to further improve these results. With these results in hand, we are well placed
to advance discussions with a range of downstream partners.
Figure 2: Visualisation of the rare earth supply chain highlighting where MREC sits in the midstream process.
ANSTO Test Work Results
Metallurgical test work was undertaken independently by ANSTO. Oversight on the test work was conducted
on behalf of Dreadnought by experienced consulting metallurgist, Damien Krebs from Primero Group. The test
work was undertaken with a ~2kg monazite concentrate sample that was created from a composite of diamond
core samples from three holes within the Yin ironstone Resource. (For further information on that initial
metallurgical concentrate work see ASX, 29 May 2023, Metallurgical Test Work Supports High-Value Concentrate). The
monazite concentrate had a composition of 30.6% TREO containing 8.3% Nd2O5 and 2.2% Pr6O11 (34%
NdPr:TREO Ratio) and was comprised predominantly of monazite (50.6%), apatite (32.2%) and iron/manganese
oxides (12.0%).
The main objectives of the ANSTO test work were to:
•
Assess the amenability of the Yin monazite concentrate to conventional sulfuric acid baking and leaching
for extraction of rare earths;
•
Carry out limited optimisation of the bake/leach parameters; and
•
Undertake further purification of the water leach liquor and produce a MREC market sample with
optimal purity.
dreadnoughtresources.com.au
3
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
A schematic of a conventional, low-temperature, acid bake/leach flowsheet is shown in Figure 3.
Test work has confirmed that the
monazite concentrate is amenable to
processing
via
conventional,
lowtemperature, acid bake/leach. A series of
optimisation bake/leach tests were carried
out, examining the preferred processing
conditions for temperature, acid dose and
residence time. Based on the results, the
recommended conditions were a bake
temperature of 250–300°C with 1,500–
1,700 kg/t of acid for 2–4 hours.
Figure 3: Conventional, low temperature, acid bake/leach flowsheet.
ANSTO considers these conditions to be
typical of a conventional low-temperature
acid bake process for monazite-hosted
rare earths.
Pregnant leach solution from bake/leach at the optimal conditions was processed through conventional
downstream process steps, involving two stages of purification, U removal by ion-exchange and precipitation of
a MREC. The test conditions were selected based on ANSTO’s extensive experience in rare earth processing,
with no optimisation of any of the steps carried out.
The performance in each process step was in line with expectation and no major concerns for processibility
were encountered. All major impurities were removed from the water leach solution through to the MREC.
The MREC contained low impurity levels produced a clean MREC for all elements excluding sulfate. Management
of the sulfate content can be readily achieved by optimisation of the MREC precipitation conditions, however,
this was outside the scope of this stage of the test work.
Overall recoveries for NdPr from monazite concentrate to MREC were ~94%. ANSTO also observed that
ongoing metallurgical optimisation work can be expected to further improve recoveries and MREC quality.
Ironstone to Concentrate to MREC
Metallurgical test work has demonstrated that high recoveries
lead to a high quality MREC from the Yin concentrate. Further
work can be performed to optimise the concentrate treatment
process.
Table 1: Grades and recoveries for each stage of the test work on
this composite sample to date.
Diamond Core
Composite
Monazite
Concentrate
Mixed Rare Earth
Carbonate
TREO
(%)
Nd2O3 + Pr6O11
(%)
Recovery
(%)
2.4
0.9
30.6
10.5
~86
60.7
20.7
~94
Figure 4: Photo of MREC filter cake.
dreadnoughtresources.com.au
4
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Background on Mangaroon (E08/3274, E8/3178, E09/2384, E09/2433, E09/2473, E08/3275, E08/3439, E09/2290,
E09/2359, E09/2370, E09/2405, E09/2448, E09/2449, E09/2450, E09/2467, E09/2478, E09/2531, E09/2535, E09/2616,
M09/91, M09/146, M09/147, M09/174, M09/175: 100%)
Mangaroon (Figure 5) covers >5,000kms2 of the Mangaroon Zone in the Gascoyne Region of Western Australia
and is comprised of:
•
the ~45km long Money Intrusion which contains high tenor magmatic Ni-Cu-PGE mineralisation.
•
the >10km long Mangaroon Au Shear Zone (100%) where fractured, small-scale ownership has limited
previous gold exploration with only ~200m of the >10km having been drilled notwithstanding the highgrade, camp scale potential.
•
the ~43km long Yin REE Ironstone Complex (100%) which already contains: an independent total
Resource of 29.98Mt @ 1.04% TREO (87% Measured and Indicated)(ASX 30 Nov 2023) over only ~4.6km
of the ~43km of ironstones including an initial Indicated Resource of 5.52Mt @ 1.23% TREO over only
~250m of strike (ASX 5 Jul 2023); and an Exploration Target (ASX 13 Feb 2023) over 40 kms of strike.
•
the ~9km long REE-Nb-Ti-P-Sc C1-C5 carbonatites which contain an initial independent Inferred
Resource of 10.84Mt @ 1.00% TREO at C3 (ASX 28 Aug 2023).
Figure 5: Plan view map of Mangaroon showing the location of the Yin REE Ironstone Complex, REE-Nb-Ti-P-Sc C1C5 carbonatites, gold and Ni-Cu-PGE targets.
dreadnoughtresources.com.au
5
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
About ANSTO
ANSTO has world-leading expertise in the processing of critical and strategic metals such as rare earths.
ANSTO has extensive experience in rare earth process development with several rare earth experts in its team
having a combined ~30 years’ experience dating back to early work on the Mt Weld deposit (monazite
mineralogy) in Western Australia in the early 1990s. Over the past 10-15 years, ANSTO has worked on
numerous rare earth projects covering process development, piloting (Peak Resources, Arafura Rare Earths,
ASM, Northern Minerals, Hastings Technology Metals, Mkango Resources, Iluka Resources) and providing
expert advice.
For further information please refer to previous ASX announcements:
• 16 June 2022
First Drilling at Yin Intersects High-Grade Rare Earths
•
28 July 2022
Assays Confirm Yin as a High-Grade Rare Earth Discovery
•
28 December 2022
Initial High-Grade, Independent Resource over 3kms at Yin
•
29 May 2023
Metallurgical Test Work Supports High-Value Concentrate
•
5 July 2023
40% Increase in Resource Tonnage at Yin
•
28 August 2023
Initial, Independent REE-Nb-P-Ti-Sc Resource at C3
•
2 October 2023
Mangaroon Carbonatite now >17km – Higher Grade Zones Fingerprinted
•
30 November 2023
Large, High Confidence Yin Ironstone Resource Mangaroon
UPCOMING NEWSFLOW
May: Results of Ni-Cu-Co-PGE IP survey at Mangaroon (100%)
May: Results of surface sampling programs at Mangaroon Au (100%)
May: Commencement of further target generation and definition work at Mangaroon Au (100%)
May: Commencement of RC drilling at Mangaroon Au (100%)
May/June: Results from target generation and definition work at Central Yilgarn Au (100%)
May/June: Results from RC drilling at Central Yilgarn Au (100%)
~Ends~
For further information please contact:
Dean Tuck
Managing Director
Dreadnought Resources Limited
E: dtuck@dreres.com.au
Jessamyn Lyons
Company Secretary
Dreadnought Resources Limited
E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
dreadnoughtresources.com.au
6
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forwardlooking information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and
uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. There are a number of
risks, both specific to Dreadnought, and of a general nature which may affect the future operating and financial performance of Dreadnought,
and the value of an investment in Dreadnought including and not limited to title risk, renewal risk, economic conditions, stock market
fluctuations, commodity demand and price movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks,
operational risks, reliance on key personnel, reserve estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and
mining development, construction and commissioning risk.
Competent Person’s Statement – Mineral Resources
The information in this announcement that relates to Mineral Resources is based on information compiled by Mr. Lynn Widenbar, a Competent
Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Widenbar is a full-time employee of Widenbar and
Associates Pty Ltd. Mr. Widenbar has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity that is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Minerals Resources and Ore Reserves’. Mr. Widenbar consents to the inclusion in the announcement of the
matters based on his information in the form and context that the information appears.
Competent Person’s Statement – Metallurgical Results
The information in this announcement which relates to extractive metallurgical testwork was reviewed by Mr. Damien Krebs who is a Member
of Australian Institute of Mining and Metallurgy. Mr Krebs has sufficient experience in the relevant ore types and metallurgical processes to
qualify as a Competent Person for the reporting of rare earth element metallurgical results and Ore Reserves as defined in the 2012 Edition
of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Krebs consents to the inclusion in the
announcement of the matters based upon the information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports, and
that the forma and context in which the Competent Person’s findings are presented have not been materially modified from the original
reports.
RESOURCES SUMMARY
Yin Ironstone Complex – Yin, Yin South, Y2, Sabre Measured, Indicated and Inferred Resources
Table 2: Summary of Yin Resources at 0.20% TREO Cut-off.
Resource
Classification
Geology
Measured
Measured
Measured
Indicated
Indicated
Indicated
Inferred
Inferred
Inferred
Total
Total
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
Resource
(Mt)
TREO
(%)
Nd2O3+Pr6O11
(kg/t)
NdPr:TREO
Ratio (%)
Contained
TREO (t)
Contained
Nd2O3+Pr6O11 (t)
2.47
2.70
5.17
13.46
7.67
21.13
1.51
2.17
3.68
17.44
12.54
29.98
1.61
1.09
1.34
1.06
0.95
1.02
0.75
0.75
0.75
1.11
0.95
1.04
4.6
3.0
3.8
3.1
2.8
3.0
1.9
2.1
2.0
3.2
2.7
2.9
29
27
28
29
29
29
25
28
27
29
29
29
39,700
29,500
69,300
142,600
72,800
215,400
11,200
16,300
27,600
193,600
118,700
312,300
11,400
8,100
19,500
41,000
21,300
62,300
2,800
4,500
7,300
55,300
33,900
89,300
TOTAL
Gifford Creek Carbonatite – Inferred Resource
Table 3: Summary of the Gifford Creek Carbonatite Inferred Resource at various % TREO Cut-offs.
Cut-Off
(%TREO)
Resource
(Mt)
TREO
(%)
NdPr:TREO
(%)
Nb2O5
(%)
P2O5
(%)
TiO2
(%)
Sc
(ppm)
Contained
TREO (t)
Contained Nb2O5
(t)
0.90
0.70
0.50
0.30
5.73
10.84
20.55
45.87
1.18
1.00
0.80
0.58
21
21
21
21
0.25
0.22
0.15
0.10
3.8
3.5
3.0
2.7
5.4
4.9
3.9
3.0
92
85
68
52
67,500
108,000
164,600
265,300
14,500
23,700
31,100
44,800
dreadnoughtresources.com.au
7
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
INVESTMENT HIGHLIGHTS
Kimberley Ni-Cu-Au Project (80/100%)
The project is located only 85kms from Derby in the
West Kimberley region of WA and was locked up as a
Defence Reserve since 1978.
The project has outcropping mineralisation and historic
workings which have seen no modern exploration.
Results to date indicate that there may be a related, large
scale, Proterozoic Cu-Au-Ag-Bi-Sb-Co system at
Tarraji-Yampi, similar to Cloncurry/Mt Isa and Tennant
Creek.
Mangaroon Ni-Cu-Co-3PGE, Au & REE Project
(100%)
Mangaroon covers ~5,000kms2 and is located 250kms
south-east of Exmouth in the Gascoyne Region of WA.
At the Money Intrusion, Ni-Cu-Co-3PGE has been
identified. Dreadnought also has areas of outcropping
high-grade gold including the historic Star of Mangaroon
and Diamonds gold mines. In addition, Mangaroon has
emerged as a globally significant, rapidly growing,
potential source of critical minerals. Highlights include:
•
An Exploration Target estimated for the top 150m
of ~40km of the Yin REE Ironstone Complex (ASX
13 Feb 2023).
•
An independent Resource for Yin Ironstones
Complex of 29.98Mt @ 1.04% TREO over only ~4.6kms – including a Measured and Indicated Resource of
26.3Mt @ 1.04% TREO (ASX 30 Nov 2023).
•
Regional source of rare earths at the Gifford Creek Carbonatite totaling ~17kms x ~1km (ASX 7 Aug 2023).
•
A large, independent initial Resource of 10.84Mt @ 1.00% TREO at the Gifford Creek Carbonatites, containing
a range of critical minerals including rare earths, niobium, phosphate, titanium and scandium (ASX 28 Aug 2023).
Bresnahan HREE-Au-U Project (100%)
Bresnahan is located ~125km southwest of Newman in the Ashburton Basin. The project comprises ~3,700kms2
covering over 200kms strike along the Bresnahan Basin / Wyloo Group unconformity. Bresnahan is prospective for
unconformity related heavy rare earth (“HREE”) deposits similar to Browns Range HREE deposits, unconformity
uranium (“U”) deposits and mesothermal lode gold similar to Paulsens Au-Ag-Sb deposits along strike.
Prior to consolidation by Dreadnought, the Bresnahan Basin had been successfully explored for unconformity
uranium with limited exploration for mesothermal gold. Bresnahan is a first mover opportunity to explore for
unconformity HREE.
Central Yilgarn Gold, Base Metals, Critical Minerals & Iron Ore Project (100%)
Central Yilgarn is located ~190km northwest of Kalgoorlie in the Yilgarn Craton. The project comprises ~1,400kms2
covering ~150km of strike along the majority of the Illaara, Yerilgee, South Elvire and Evanston greenstone belts.
Central Yilgarn is prospective for typical Archean mesothermal lode gold deposits, VMS base metals, komatiite hosted
nickel sulphides and critical metals including Lithium-Cesium-Tantalum.
Prior to consolidation by Dreadnought, the Central Yilgarn was predominantly held by iron ore explorers and
remains highly prospective for iron ore.
dreadnoughtresources.com.au
8
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Table 4: Drill Collar and Sample Interval Data for Composite Sample (GDA94 MGAz50)
Hole ID
Easting
Northing
RL
Dip
Azimuth
Type
From
To
Prospect
YINDD003
YINDD010
YINDD011
401993
401943
401935
7351424
7351324
7351222
299
300
300
-60
-60
-60
275
283
286
Full Core
Half Core
Full Core
13m
14.8m
52m
17.4m
20.6m
61m
Yin
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling techniques
•
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed information.
Diamond (DD) drilling was undertaken to produce
composite samples for preparation of a monazite
concentrate.
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Diamond Drilling
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Diamond Drilling
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
Diamond Drilling
Diamond core is logged under supervision of a Senior
Geologist with sufficient experience in this geological terrane
and relevant styles of mineralisation using an industry
standard logging system which could eventually be utilised
within a Mineral Resource Estimation.
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.
For all sample types, the nature, quality and
Diamond Drilling
•
•
•
Drilling techniques
Drill sample recovery
•
•
•
•
•
Logging
•
•
Sub-sampling
techniques and sample
preparation
•
•
•
dreadnoughtresources.com.au
~2kg of monazite concentrate was sent in its entirety to
ANSTO.
Mineralogy was determined by QEMSCAN particle
mineralogical analysis (PMA) using a Quanta 650 electron
microscope with dual Bruker 503.0 energy dispersive
detectors. The SEM was operated at an accelerating voltage
of 15keV with a working distance of 13mm and using a beam
current of ~10nA.
All solid residues and filtrate samples were analysed by ICPOES, ICP-MS and / or XRF and an elemental mass balance
constructed for each test. Wash filtrates in each test were
combined and analysed as a single combined wash sample.
The MREC product was analysed for major elemental
concentrations by X-ray Fluorescence spectrometry (XRF)
and for minor elemental concentrations by inductively
coupled plasma mass or optical emission spectrometry (ICPMS or ICP-OES), as appropriate, according to ANSTO
controlled documents G-5915 XRF Procedures Manual and
G-5913 Analytical Methods Manual, respectively
Diamond drilling was undertaken by Hagstrom Drilling with
a truck-mounted low impact diamond drill rig. Drilling is
either HQ to end of hole or initially HQ and dropping to
NQ once the hole is cased off for deeper drill holes.
Core is orientated using a Reflex Sprint gyro and True Core
Orientation Tool.
HQ and NQ drilling has been undertaken. All core
recoveries are measured and recorded by the drill crew for
each run and remeasured and checked by Dreadnought
personnel.
Core recovery to date has been very high.
At this stage, no known bias occurs between sample
recovery and grade.
Lithology, mineralisation, alteration, veining, weathering and
structure are recorded digitally.
DD Logging is qualitative, quantitative or semi-quantitative in
nature.
20cm – 1m quarter core samples are sawn and submitted to
the lab for analysis. If core is orientated, then the core is cut
so as to preserve the orientation line with the same side of
the core submitted down the hole.
9
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Criteria
JORC Code explanation
•
•
•
Quality of assay data
and laboratory tests
•
•
•
Commentary
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
For the purposes of metallurgical testing, half core was
submitted where possible to make the required bulk
composite mass required for ongoing testwork. In some
instances, this required full core to be used.
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Laboratory Analysis
Samples are submitted to ANSTO for testwork.
Mineralogy was determined by QEMSCAN particle
mineralogical analysis (PMA) using a Quanta 650 electron
microscope with dual Bruker 503.0 energy dispersive
detectors. The SEM was operated at an accelerating voltage
of 15keV with a working distance of 13mm and using a beam
current of ~10nA.
All solid residues and filtrate samples were analysed by ICPOES, ICP-MS and / or XRF and an elemental mass balance
constructed for each test. Wash filtrates in each test were
combined and analysed as a single combined wash sample.
The MREC product was analysed for major elemental
concentrations by X-ray Fluorescence spectrometry (XRF)
and for minor elemental concentrations by inductively
coupled plasma mass or optical emission spectrometry (ICPMS or ICP-OES), as appropriate, according to ANSTO
controlled documents G-5915 XRF Procedures Manual and
G-5913 Analytical Methods Manual, respectively.
These techniques are considered