15km Gold-in-Soil Anomaly along Minga Bar - Mangaroon Gold
Released
Released
Announcement PDF
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 1
ASX ANNOUNCEMENT 12 August 2026
15km Gold-in-Soil Anomaly along Minga Bar – Mangaroon Gold
HIGHLIGHTS
• Target definition work along the Minga Bar shear at Mangaroon has defined a ~15km long strong gold in soil
anomaly that extends along strike between and beyond Cullen’s Find, Midday Moon and Midnight Star.
• These results highlight the opportunity to build upon and extend mineralisation from reconnaissance drilling
completed at the end of 2025 which returned significant intercepts including (ASX.DRE 9 Feb 2026):
CFRC001: 25m @ 1.0g/t Au from 22m including 12m @ 1.4g/t Au from 25m (Cullen’s Find)
CFRC002: 2m @ 4.4g/t Au from 81m, including 1m @ 8.7g/t Au from 81m (Cullen’s Find)
MSRC005: 4m @ 3.2g/t Au from 12m including 1m @ 11.4g/t Au from 13m (Midnight Star)
MMRC004: 3m @ 0.3g/t Au, 0.2% Cu and 0.2% Bi from 62m (Midday Moon)
• Detailed mapping and additional surface sampling will be undertaken to define and prioritise targets for discovery
drilling by the end of 2026 or start of 2027.
• Results for remaining soil and stream sediment samples are expected throughout August and September 2026.
Dreadnought Resources Ltd (“Dreadnought”) is pleased to provide an update on exploration
activities at the 100% owned Mangaroon Gold Project, in the Gascoyne region of WA.
Dreadnought’s Managing
Director, Dean Tuck,
commented: “Making a large-scale
gold discovery is a key pillar of our
Finding More Gold Faster Strategy.
This target definition program at
Mangaroon is running in parallel
with our air core program at Illaara,
both of which aim to have drill
targets for discovery in 2026.
These infill soil results from Minga
Bar have successfully defined strong
gold-in-soil anomalism over ~15km
strike. Pleasingly, these anomalies
are largely constrained within the
more altered and deeply weathered
zone of the Minga Bar shear making
it easier to follow up with detailed
mapping and target ranking work.
We look forward to the results of
follow up work and to build upon the
significant gold intercepts from our
2025 reconnaissance program.
We also look forward to results of
first-pass soils at High Range
Northwest, High Range South and
stream sediments at Mangaroon
South.”
Figure 1: Plan view image of part of
the Minga Bar shear zone showing
the location of gold-in-soil anomalism
in relation to current gold targets and
recent drilling.
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 2
Background on Cullen’s Find and the Minga Bar shear zone
The Minga Bar shear zone is a major crustal scale structure that represents a domain of opportunity to host multiple gold deposits.
Within Mangaroon, the Minga Bar shear zone is generally ~0.5-1.5km wide and forms a major regional flexure that puts Leake
Spring Metamorphics, Moorarie Supersuite, Pooranoo Metamorphics and Edmund Group sediments within structural contact with
each other. Cullen’s Find, Midday Moon and Midnight Star are all located within the Minga Bar shear zone.
In 1986, 7 RC holes (352m) were drilled into an outcropping vein swarm along the Minga Bar shear zone at what is now called
Cullen’s Find. Of this, only 126m of samples were submitted for analysis returning a best intercept of 3m @ 6.5 g/t Au from
26m including 1m @ 16.2 g/t Au from 28m. No other gold exploration work has taken place since.
In 2025, Dreadnought undertook first pass reconnaissance RC drilling at Cullen’s Find, Midnight Star and Midday Moon returning
significant intercepts including:
CFRC001: 25m @ 1.0g/t Au from 22m including 12m @ 1.4g/t Au from 25m
CFRC002: 2m @ 4.4g/t Au from 81m, including 1m @ 8.7g/t Au from 81m
MSRC005: 4m @ 3.2g/t Au from 12m including 1m @ 11.4g/t Au from 13m
MMRC004: 3m @ 0.3g/t Au, 0.2% Cu and 0.2% Bi from 62m
Recently, infill soil sampling was completed along the Minga Bar trend which has now defined a ~15km long gold in soil anomaly
with associated Ag-Bi-Te-W +/- Cu pathfinder anomalism. This highlights the opportunity to build upon early drill results and
extend mineralisation to make discoveries along strike.
A trial gradient array IP survey showed strong resistivity anomalies and offsets associated with Cullen’s Find but ran into difficulty
with the conductivity due to EM coupling effects in the regolith. Given the well-defined soil anomalism within the shear and detailed
magnetics, drill targeting will be based off detailed mapping, structural interpretation and surface geochemistry.
Next steps include additional detailed surface mapping and sampling to further define and prioritise targets for drilling by the end
of 2026 or start of 2027.
Target Generation and Target Definition Programs
Target generation and definition work continues across Mangaroon. Camp Scale targets are generated by using the combination of
prospective lithostructural settings and anomalous gold/pathfinder stream sediments. These areas are then further refined into drill
targets based upon anomalous gold and pathfinder soils and supported by geological mapping.
Stream sediment sampling has highlighted 7 camp scale prospects. Significantly, many of these prospects contain stronger and or
larger gold and pathfinder anomalies than around the Star of Mangaroon. The Star of Mangaroon is the only camp scale prospect
currently with a history of gold production and targeted gold exploration.
With the camp scale prospects generated, exploration has now turned to defining drill targets through systematic soil sampling and
detailed mapping and lithostructural interpretations at High Range North, High Range Northwest, High Range South, Minga Bar
and Bordah. Results for remaining soil and stream sediment samples are expected throughout August and September 2026.
A summary of the camp scale prospects is shown below in Table 1.
Table 1: Description of camp scale prospects and status of target definition work.
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 3
Dreadnought’s work plan summary
Upcoming News
• August: Upgrade JORC Exploration Target — Gifford Creek
• August: Results of target definition work — Mangaroon Gold
• August: Commencement of infill air core drilling at Black Oak and CRA Homestead — Illaara Gold
• August/September: Results of target generation work — Mangaroon South
• September/October: Metzke’s Find study — Illaara Gold
For further information please refer to previous ASX announcements:
• 25 November 2020 Mangaroon Ni-Cu-PGE & Au Project
• 12 September 2022 Star of Mangaroon Acquisition & Consolidation
• 7 June 2023 Mangaroon Gold Review and Further Consolidation
• 26 July 2024 Consolidation, Growth & Commercialisation
• 30 January 2025 Further Consolidation and High-Grade Gold at Mangaroon
• 23 June 2025 Gold Drilling Commenced at Mangaroon
• 24 September 2025 36% Increase in High-Grade M&I Resource
• 29 October 2025 Upgraded Study for Star of Mangaroon
• 24 November 2025 Thick, Near Surface Gold Intercepts from Cullen’s Find
• 9 February 2026 High Grade Gold Upgrades from Mangaroon Gold
• 24 February 2026 New Camp Scale Prospect at Mangaroon Gold
~Ends~
For further information please contact:
Dean Tuck Jessamyn Lyons
Managing Director Company Secretary
Dreadnought Resources Limited Dreadnought Resources Limited
E: dtuck@dreres.com.au E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 4
Snapshot — Mangaroon Gold (100%)
Mangaroon Gold is Large Scale
• Mangaroon covers ~5,000km2 with an initial focus on the gold system situated over the Mangaroon Shear
Zone between the crustal scale Minga Bar and Edmund Faults with multiple phases of intrusions. Numerous
historical workings along the Mangaroon Shear Zone have only seen limited drilling. This area also contains
the ~12km x 6km Bordah and ~50km long High Range prospects where limited previous exploration has
identified outcropping gold and base metal mineralisation.
Self-Funded Explorer Strategy
• Dreadnought’s strategy is to transform into a self-funded explorer. This involves a high-grade open pit at the
Star of Mangaroon where funding, development, haulage and processing are outsourced to third parties. This
is a common model in WA given the robust gold price. In this way, there is reduced reliance on market
funding and internal cashflows are aimed at making life-changing discoveries.
Consolidation Provides for First Ever Modern Exploration
• All historical workings and known gold occurrences relate to outcropping mineralisation. There has been
minimal historical and modern exploration due to fractured, small-scale ownership with Dreadnought now
undertaking modern exploration for the first time.
Significant, Step-change, Growth Potential
• Five historical mines developed on outcropping mineralisation and dozens of gold occurrences along highly
prospective structural corridors.
• Dreadnought is deploying modern geochemical and geophysical techniques to explore for mineralisation
under shallow cover. These techniques have already generated new prospects with stronger and larger
signatures than the historical mines, including the region’s largest high-grade producer at the Star of
Mangaroon mine.
• Project-wide stream sediment sampling and geophysical surveys have identified additional camp scale
prospects at Bordah and High Range.
Shallow, High-grade Gold
• The Resource at Star of Mangaroon contains shallow, high-grade gold as per Table 2 below:
Table 2: Resource (2 g/t Au cut-off grade) — Numbers may not add up due to rounding. *Surface reported at a 0.5 g/t Au cut-off.
Type
Measured Indicated Inferred Total
Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz)
Surface* 8,300 1.0 300 8,300 1.0 300
Transition 6,300 24.9 5,100 3,300 6.5 700 9,600 18.6 5,800
Fresh 33,200 13.5 14,400 23,500 8.5 6,400 1,000 5.1 200 57,700 11.3 21,000
Total 39,500 15.3 19,400 26,800 8.2 7,100 9,300 1.4 400 75,600 11.1 27,000
Exceptional Metallurgical Recoveries
• The region is known for its free gold. Accordingly, metallurgical work at Star of Mangaroon produced
exceptional recoveries from standard gravity and carbon-in-leach circuits averaging 96.7% combined
recovery including an average 74.4% gravity recovery (ASX 14 Oct 2024).
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 5
Mangaroon Project
Mangaroon covers ~5,000km2
and is located 250km south-east of
Exmouth in the Gascoyne Region of WA. Since 2020, Dreadnought has
identified three major focus areas within the Mangaroon Project:
Mangaroon Gold (100%)
Outcropping gold mineralisation was first identified and mined at
Mangaroon by local pastoralists and prospectors in the 1960s and has
seen no modern gold exploration. Dreadnought has consolidated this
gold field and is undertaking the first modern exploration across the
region which has identified five camp scale gold opportunities at
Bordah, High Range, Alma, Minga Bar and Star of Mangaroon.
In addition, the project contains granted mining leases that provide an
opportunity for cashflow including the Star of Mangaroon Mine where
Dreadnought has delivered a 27,000 oz Resource at 11.1g/t Au (99%
Measured & Indicated).
Gifford Creek Critical Metals (100%)
Dreadnought discovered the Yin Ironstones and the Gifford Creek
Carbonatite in 2021. Since then, the Gifford Creek Carbonatite
Complex has emerged as a globally significant, rapidly growing,
potential source of critical minerals. Highlights include:
• Discovery of the Yin REE Ironstone Complex and delivery of a
30.0Mt @ 1.04% TREO Resource over only ~4.6km – including a
Measured and Indicated Resource of 26.3Mt @ 1.04% TREO (ASX
30 Nov 2023).
• Discovery of the globally significant, Nb-REE-P-Ti-Sc enriched
Gifford Creek Carbonatite (ASX 7 Aug 2023).
• Delivery of a large, independent initial Resource of 10.8Mt @ 1.00% TREO at the Gifford Creek Carbonatites, containing a range
of critical minerals including rare earths, niobium, phosphate, titanium and scandium (ASX 28 Aug 2023).
• Discovery of Stinger Nb-REE-P-Ti-Sc-Zr bearing carbonatite and delivery of the Stinger Niobium Exploration Target (ASX 3 Mar
2025, 29 Sept 2025).
Money Intrusion Ni-Cu-PGEs (Teck Earn-In)
The Money Intrusion is a ~45km long mafic intrusion prospective for Ni-Cu-PGE massive sulphides. In 2023, Dreadnought discovered
high tenor nickel-copper massive sulphides confirming the potential of this new system. Dreadnought entered into a $15M Farm-In
and Joint Venture agreement with Teck Resources, a leading Canadian resource company, to earn up to 75% of the Money Intrusion
tenements.
Illaara Gold Project (100%)
Illaara is located ~190km northwest of Kalgoorlie in the Yilgarn Craton. The project comprises ~800km2
covering ~70km of strike
along the Illaara greenstone belts. Illaara was acquired off Newmont in 2019 as an early stage exploration project prospective for
typical Archean mesothermal lode gold deposits. Dreadnought has delivered a 24,900 oz @ 5.2 g/t Au Resource at Metzke’s Find
(84% Indicated). Prior to consolidation by Dreadnought, Illaara was predominantly held by iron ore explorers and remains highly
prospective for iron ore amongst other commodities.
Kimberley Cu-Au-Sb Project (Tarraji 80% / Yampi 100%)
Tarraji-Yampi covers ~420km2
and is located only 85km from Derby in the West Kimberley region of WA and was locked up as a
Defence Reserve since 1978. The project has outcropping mineralisation and historical workings which have seen no modern
exploration.
In 2021, Dreadnought discovered high grade Cu-Au massive sulphides at Orion with results to date indicating a large scale,
Proterozoic Cu-Au VMS system at Tarraji-Yampi, similar to DeGrussa and Monty in the Bryah Basin.
In addition, the project contains outcropping high-grade Cu-Ag-Sb-Bi Veins at Rough Triangle and Grant’s Find.
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 6
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forward-looking
information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results
and developments will almost certainly differ materially from those expressed or implied. There are a number of risks, both specific to Dreadnought, and
of a general nature which may affect the future operating and financial performance of Dreadnought, and the value of an investment in Dreadnought
including and not limited to title risk, renewal risk, economic conditions, stock market fluctuations, commodity demand and price movements, timing of
access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve estimations, native title
risks, cultural heritage risks, foreign currency fluctuations, and mining development, construction and commissioning risk.
Competent Person’s Statement — Mineral Resources
The information in this announcement that relates to the Star of Mangaroon, Orion and Metzke’s Find Mineral Resource is based on information compiled
by Mr. Shaun Searle, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr. Searle is an employee of Ashmore Advisory
Pty Ltd. Mr. Searle has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that
is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Minerals Resources and Ore Reserves’. Mr. Searle consents to the inclusion in the announcement of the matters based on his information in the form and
context that the information appears in relation to Mineral Resource estimates.
Competent Person’s Statement — Exploration Results
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled by Mr. Dean Tuck
who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the
announcement of the matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information included in the original market
announcements by Dreadnought Resources Limited referenced in this report and in the case of Mineral Resources, Production Targets, forecast financial
information and Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. To the extent disclosed above, the Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcements.
Resources Summary
Star of Mangaroon — Indicated and Inferred Resources (ASX 27 November 2024)
Table 3: Resource (2 g/t Au cut-off grade) — Numbers may not add up due to rounding. *Surface reported at a 0.5 g/t Au cut-off.
Type
Measured Indicated Inferred Total
Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz)
Surface* 8,300 1.0 300 8,300 1.0 300
Transition 6,300 24.9 5,100 3,300 6.5 700 9,600 18.6 5,800
Fresh 33,200 13.5 14,400 23,500 8.5 6,400 1,000 5.1 200 57,700 11.3 21,000
Total 39,500 15.3 19,400 26,800 8.2 7,100 9,300 1.4 400 75,600 11.1 27,000
Metzke’s Find — Indicated and Inferred Resources (ASX 23 June 2026)
Table 4: Resource (0.5 g/t Au cut-off grade) — Numbers may not add up due to rounding
Type
Indicated Inferred Total
Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz)
Oxide 500 3.0 50 2,500 1.5 120 3,000 1.7 170
Transition 4,200 4.7 600 8,700 1.7 500 13,000 2.7 1,100
Fresh 102,100 6.1 20,100 32,000 3.5 3,600 134,000 5.5 23,600
Total 106,800 6.0 20,800 43,300 3.0 4,200 150,100 5.2 24,900
Yin Ironstone Complex — Yin, Yin South, Y2, Sabre Measured, Indicated and Inferred Resources (ASX 30 November 2023)
Table 5: Summary of Yin Resources at 0.20% TREO Cut off.
Type
Measured Indicated Inferred Total
Tonnes
(Mt)
TREO
(%)
TREO
(kt)
Tonnes
(Mt)
TREO
(%)
TREO
(t)
Tonnes
(Mt)
TREO
(%)
TREO
(t)
Tonnes
(Mt)
TREO
(%)
TREO
(t)
NdPr:TREO
Ratio (%)
Oxide 2.47 1.61 39.7 13.46 1.06 142.6 1.51 0.75 11.2 17.44 1.11 193.6 29
Fresh 2.70 1.09 29.5 7.67 0.95 72.8 2.17 0.75 16.3 12.54 0.95 118.7 29
Total 5.17 1.34 69.3 21.13 1.02 215.4 3.68 0.75 27.6 29.98 1.04 312.3 29
Table 6: Summary of Yin Resources at 1.00% TREO Cut off.
Type
Measured Indicated Inferred Total
Tonnes
(Mt)
TREO
(%)
TREO
(kt)
Tonnes
(Mt)
TREO
(%)
TREO
(t)
Tonnes
(Mt)
TREO
(%)
TREO
(t)
Tonnes
(Mt)
TREO
(%)
TREO
(t)
NdPr:TREO
Ratio (%)
Oxide 1.60 2.22 35.6 5.34 1.99 106.4 0.26 1.67 4.3 7.20 2.03 146.3 30
Fresh 1.36 1.68 22.8 2.65 1.81 47.9 0.42 1.72 7.3 4.43 1.76 78.0 29
Total 2.96 1.97 58.4 7.99 1.93 154.3 0.68 1.70 11.6 11.63 1.93 224.3 29
Gifford Creek Carbonatite — Inferred Resource (ASX 28 August 2023)
Table 7: Summary of the Gifford Creek Carbonatite Inferred Resource at various % TREO Cut offs.
Cut-Off
(%TREO)
Resource
(Mt)
TREO
(%)
NdPr:TREO
(%)
Nb2O5
(%)
P2O5
(%)
TiO2
(%)
Sc
(ppm)
Contained
TREO (t)
Contained
Nb2O5 (t)
0.70 10.84 1.00 21 0.22 3.5 4.9 85 108,000 23,700
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 7
JORC Code, 2012 Edition — Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling techniques • Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
Rock Chips
Rock Chips were collected by Dreadnought staff and
submitted for analysis. Rock chips are random, subject to
bias and often unrepresentative for the typical widths
required for economic consideration. They are by nature
difficult to duplicate with any acceptable form of precision or
accuracy.
Rock chips have been collected by Dreadnought to assist in
characterising different lithologies, alterations and
expressions of mineralisation. In many instances, several
rock chips were collected from a single location to assist
with characterising and understanding the different
lithologies, alterations and expressions of mineralisation
present at the locality.
Rock chips were submitted to ALS Laboratories in Perth for
determination of gold by fire assay and ICP-MS finish (ALS
Method Au-ICP22) and 48 other elements by four acid
digest and ICP-MS finish (ALS Method ME-MS61).
Soil Sampling
Soil samples were collected by Dreadnought and contractor
(OZEX Exploration Services) personnel on a 800x50m,
400x50m, 200x50m or 100x50m grid across the Project.
Samples were collected by digging a 30x30x10cm pit,
homogenising and then sieving and collection of a dry 200g -
177µm sample.
Soils samples were submitted to Labwest (Perth) for Ultra
Fine Fraction (UFF) separation (<2µm) and analysis by Aqua
Regia ICP-MS & ICP-OES for determination of Au and 45
other elements.
Stream Sediment Sampling
Soil samples were collected by Dreadnought and contractor
(OZEX Exploration Services) personnel on a ~1 sample per
5 sq km drainage catchment across the Project and infilled to
~1 sample per 1 sq km drainage catchment in areas of
interest.
Samples were collected by digging multiple pits across active
drainage lines in areas with the finest material and then
sieving and collection of a dry 200g -177µm sample.
Stream sediment samples were submitted to Labwest (Perth)
for Ultra Fine Fraction (UFF) separation (<2µm) and analysis
by Aqua Regia ICP-MS & ICP-OES for determination of Au
and 45 other elements.
Drilling techniques • Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
No drilling reported.
Drill sample recovery • Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
No drilling reported.
Logging • Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
• The total length and percentage of the relevant
intersections logged.
No drilling reported.
Sub-sampling
techniques and sample
preparation
• If core, whether cut or sawn and whether quarter, half or
all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc.
Rock Chips
Entire rock chips were submitted to the lab for sample prep
and analysis.
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 8
Criteria JORC Code explanation Commentary
and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of
the material being sampled.
Stream Sediment and Soil Samples
Stream sediment and soil samples were submitted to
LabWest in Perth where the -2 µm particle size fraction is
extracted using the UltraFine method developed by CSIRO
and LabWest.
Every 50 samples a field duplicate is collected by digging a
second 30x30x10cm pit within 2-3m of the original,
homogenising and then sieving and collection of a dry 200g -
177µm sample.
Sample sizes for are appropriate to the grain size of the
material sampled.
No drilling reported.
Quality of assay data
and laboratory tests
• The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Rock Chips
Assay technique is Fire Assay which is a ‘Total Technique’
for Au. Four acid digest is considered a ‘near total’ technique
for the 48 elements received under ME-MS61.
Standard laboratory QAQC is undertaken and monitored by
the laboratory and by the company upon assay result
receival.
Stream Sediment and Soil Samples
Samples were screened in the field to -177µm.
Labwest then takes a sub-sample of <2µm material for
analysis.
The UFF sample preparation was defined following a
Research and Development project conducted under the
direction of CSIRO.
Field duplicates are submitted and perform to internal DRE
standards.
Orientation work as part of CSIRO research and previous
work by Dreadnought Resources indicates the grain size is
appropriate for the material being tested.
Verification of
sampling and assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
Rock Chips
All significant results are revisited with follow up sampling
and mapping.
Geochemical sample coordinates and geological information
is written in field books and coordinates and track data
saved from handheld GPSs used in the field.
Field data is entered into excel spreadsheets and then loaded
into a geological database.
Stream Sediment and Soil Samples
All significant results are revisited with follow up sampling
(upstream) including occasionally a repeat sample from the
original location.
Location of data points • Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
All sample locations were recorded with a Garmin handheld
GPS which has an accuracy of +/-3m
GDA94 MGAz50
Data spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
Stream Sediment and Soil Samples
The soil and stream sediment sample spacing and
distribution is not sufficient to establish the degree of
geological and grade continuity appropriate for a Mineral
Resource.
No drilling reported.
Orientation of data in
relation to geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
At this early stage of exploration, mineralisation thickness’s,
orien
Share your feedback
Discover