HIGHLIGHTS
• RC and diamond drilling has commenced at Mangaroon Gold with a focus on discovery, adding near term
production ounces and grade control drilling.
• ~62 RC holes for ~5,000m will be drilled at Steve’s Reward, Inevitable, Star of Mangaroon. ~6 diamond holes for
400m will be drilled at Star of Mangaroon. Drilling at Pritchard’s and Popeye may be undertaken following the
results of a Leachwell study.
• Drilling has commenced targeting EM conductors at Inevitable and outcropping high-grade gold veins at Steve’s
Reward (21 holes). Recent rock chips from Steve’s Reward include:
SRK025: 38.2g/t Au
SRRK016: 49.9g/t Au
SRRK006: 100.5g/t Au
SRRK002: 155.5g/t Au
• Drilling will then move to Star of Mangaroon where grade control (41 holes) and diamond (6 holes) drilling will
be undertaken.
• Assays are expected in August/September 2025.
Dreadnought Resources Ltd (“Dreadnought”) is pleased to announce the commencement
of RC and diamond drilling at the 100% owned Mangaroon Gold Project (“Mangaroon”), in
the Gascoyne region of WA.
Dreadnought’s Managing Director, Dean Tuck, commented: “We have two rigs on site at the Mangaroon Gold Project.
In addition to working on adding additional near-term production ounces, we will also be undertaking grade control drilling at
the Star of Mangaroon. We will also be undertaking discovery focused drilling at Steve’s Reward and Inevitable. Making a
major gold discovery at Mangaroon is a key pillar of our Finding More Gold, Faster Strategy. We look forward to delivering this
program both for discovery as well as grade control drilling ahead of mining.”
Figure 1: Photo of the RC rig ready to drill at Inevitable.
ASX:DRE
Dreadnought Resources Ltd 1
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Overview of Discovery Drilling Program
Steve’s Reward (100%)
Steve’s Reward has a similar lithostructural setting as the Star of Mangaroon and this is the first ever drill program at
Steve’s Reward.
An outcropping gold lode was identified in 1996 producing significant rock chip results, up to 116g/t Au (*123105)
over 80m in strike, however, no further work or drilling was undertaken.
Recent sampling and detailed mapping identified numerous high-grade subcropping gold rich lodes over an area of
~300 x ~200m with significant rock chip assays including:
JRK002: 30.3g/t Au
SRRK008: 49.5g/t Au
SRRK006: 100.5g/t Au
SRRK002: 155.5g/t Au
A total of 17 RC holes including two scissor holes is planned.
Figure 2: Plan view image of Steve’s Reward showing mapped and interpreted lode horizons with significant rock chip call outs and the
location of planned drilling.
ASX:DRE
Dreadnought Resources Ltd 2
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Inevitable (100%)
Inevitable has a similar lithostructural setting as the Star of Mangaroon and Tiger VMS and this is the first ever drill
program at Inevitable.
Inevitable is comprised of a string of strong conductors covering ~900m of strike. Follow up mapping of the anomaly
identified ~200m of subcropping gossan which returned significant results including:
BEM001: 6.6% Cu, 0.7% Pb, 5.1g/t Ag, 0.1g/t Au
Subsequent surface geochemistry and ground geophysics has also defined 4 electromagnetic (“EM”) conductors.
Inevitable is believed to be similar to the Tiger which may be related to volcanogenic massive sulphides or intrusion
related gold/base metals.
A total of 5 RC holes will be testing each of the four EM conductors and a fifth hole testing between the
conductors. Down hole EM surveys will also be undertaken.
This program is co-funded by an Exploration Incentive Scheme drilling grant with ~$120,000 in support from the
Geological Survey of Western Australia.
Figure 3: Plan view image of Inevitable showing the location of planned drilling in relation to mapped and interpreted lode horizon and
modelled EM plates over the VTEM image (Ch40).
ASX:DRE
Dreadnought Resources Ltd 3
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Overview of Drilling Program – Star of Mangaroon, Popeye and Pritchard’s (100%)
(First right to develop with Black Cat Syndicate Ltd.)
Dreadnought’s objective remains to commence open pit mining at Star of Mangaroon in 2025. As part of that focus,
this program includes grade control drilling (41 RC and 6 diamond holes).
Follow up drilling may be undertaken at Popeye and Pritchard’s following the completion and analysis of a Leachwell
study from the previous drilling. Leachwell is an assay technique that can digest gold from larger samples. As confirmed
in the recent drilling, the gold systems at Popeye, Pritchard’s, Two Peaks and Lead Mine are nuggety in nature with a
single meter sample at Pritchard’s returning results from 0.2g/t Au to 34.5g/t Au. A larger sample size may allow for
more reliable assessment of these prospects.
Figure 4: Plan view map showing the location of planned drilling (blue dots) at Star of Mangaroon and Popeye in relation to
planned mining infrastructure
ASX:DRE
Dreadnought Resources Ltd 4
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Dreadnought’s planned transition to self-funded explorer
Star of
Mangaroon Open
Pit
Additional
Resource Drilling
Gold Exploration
Mar 2025
Quarter
Jun 2025
Quarter
Study
Mine, haul, process
agreement(s)
Sep 2025
Quarter
Dec 2025
Quarter
Approvals and commencement of
production
Granted Mining Leases including: Star of Mangaroon extensions,
Popeye, Pritchard’s, Lead, Two Peaks, McCarthy Workings
Bordah, High Range,
Minga Bar
Drilling at Steve’s Reward and Inevitable. Bordah, High Range, Minga
Bar
For further information please refer to previous ASX announcements:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
25 November 2020
15 March 2021
17 May 2021
12 September 2022
7 June 2023
4 September 2023
11 December 2023
13 March 2024
26 July 2024
26 July 2024
1 October 2024
14 October 2024
27 November 2024
28 January 2025
30 January 2025
18 March 2025
20 June 2025
Mangaroon Ni-Cu-PGE & Au Project
Exploration Commences at Mangaroon Ni-Cu-PGE & Au Project
Update on Mangaroon Ni-Cu-PGE & Au Project
Star of Mangaroon Acquisition & Consolidation
Mangaroon Gold Review and Further Consolidation
Outstanding Gold Opportunities Along >10km Mangaroon Shear Zone
Thick, High-Grade Gold Including 7m @ 23.0g/t Au
Star of Mangaroon Camp Scale Gold Prospect Expands to ~15km x 10km
Strategic & Prospective Consolidation
Consolidation, Growth & Commercialisation
Shallow, High-Grades at Star of Mangaroon & Popeye
Exceptional Gold Recoveries from Star of Mangaroon
Shallow, High-Grade, 84% Indicated Au Resource
Robust Scoping Study for Star of Mangaroon
Further Consolidation and High-Grade Gold at Mangaroon
High Grade Gold Lode Extended
Star of Mangaroon Extended
~Ends~
For further information please contact:
Dean Tuck
Managing Director
Dreadnought Resources Limited
E: dtuck@dreres.com.au
Jessamyn Lyons
Company Secretary
Dreadnought Resources Limited
E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
ASX:DRE
Dreadnought Resources Ltd 5
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Snapshot – Mangaroon Gold (100%)
Mangaroon Gold is 100% Owned by Dreadnought
•
Mangaroon covers ~5,000kms2 with an initial focus on the gold system situated over the Mangaroon Shear Zone
between the crustal scale Minga Bar and Edmund Faults with multiple phases of intrusions. Numerous historical
workings along the Mangaroon Shear Zone have only seen limited, shallow drilling along ~200m of strike near the
Star of Mangaroon mine. This area also contains the ~12km x 6km Bordah and ~50km long High Range prospects
where limited previous exploration has identified outcropping gold and base metal mineralisation.
Self-Funded Explorer Strategy
•
Dreadnought’s strategy is to transform into a self-funded explorer. This involves a high-grade open pit at the Star
of Mangaroon where funding, development, haulage & processing are outsourced to third parties. This is a
common model in WA given the robust gold price. Once successful, extend this model to Popeye, Two Peaks,
Lead Gold Mine, Pritchard Well, etc. In this way, there is reduced reliance on market funding and internal
cashflows are aimed at making life-changing discoveries.
Consolidation Provides for First Ever Modern Exploration
•
All historical workings and known gold occurrences relate to outcropping mineralisation. There has been minimal
historical and modern exploration due to fractured, small-scale ownership with Dreadnought now undertaking
modern exploration for the first time.
Significant, Step-change, Growth Potential
•
Five historical mines developed on outcropping mineralisation and dozens of gold occurrences along highly
prospective structural corridors.
•
Dreadnought is deploying modern geochemical and geophysical techniques to explore for mineralisation under
shallow cover. These techniques have already generated new prospects with stronger and larger signatures than
the historical mines, including the region’s largest high-grade producer at the Star of Mangaroon mine.
•
Project-wide stream sediment sampling and geophysical surveys have identified additional camp scale prospects
at Bordah and High Range.
Shallow, High-grade Gold
•
The initial Resource at Star of Mangaroon contains shallow, high-grade gold as per Table 1 below:
Table 1: Resource (2g/t Au cut-off grade) - Numbers may not add up due to rounding.
Type
Transition
Fresh
Total
•
Indicated
Tonnes
1,900
42,500
44,400
Au (g/t)
26.9
13.0
13.6
Inferred
Au (Oz)
1,700
17,800
19,500
Tonnes
12,200
12,200
Au (g/t)
9.8
9.8
Total
Au (Oz)
3,900
3,900
Tonnes
1,900
54,700
56,600
Au (g/t)
26.9
12.3
12.8
Au (Oz)
1,700
21,700
23,400
Also, Popeye, located <1km from the Star of Mangaroon, contains significant shallow high-grade gold including:
POPRC001: 3m @ 22.8 g/t Au from 13m POPRC002: 1m @ 1.6 g/t Au, 15.5g/t Ag from 11m
Exceptional Metallurgical Recoveries
•
The region is known for its free gold. Accordingly, metallurgical work at Star of Mangaroon produced exceptional
recoveries from standard gravity and carbon in leach circuits averaging 96.7% combined recovery including an
average 74.4% gravity recovery (ASX 14 Oct 2024).
ASX:DRE
Dreadnought Resources Ltd 6
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forward-looking
information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual
results and developments will almost certainly differ materially from those expressed or implied. There are a number of risks, both specific to
Dreadnought, and of a general nature which may affect the future operating and financial performance of Dreadnought, and the value of an investment
in Dreadnought including and not limited to title risk, renewal risk, economic conditions, stock market fluctuations, commodity demand and price
movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve
estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and mining development, construction and commissioning risk.
Competent Person’s Statement – Mineral Resources
The information in this announcement that relates to the Star of Mangaroon Mineral Resource is based on information compiled by Mr. Paul Payne, a
Competent Person who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr. Payne is a full-time employee of Payne Geological Services
Pty Ltd and is a shareholder of Dreadnought Resources Limited. Mr. Payne has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity that is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves’. Mr. Payne consents to the inclusion in the announcement
of the matters based on his information in the form and context that the information appears.
Competent Person’s Statement – Exploration Results
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled by Mr. Dean Tuck,
who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the
announcement of the matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information included in the original market
announcements by Dreadnought Resources Limited referenced in this report and in the case of Mineral Resources, Production Targets, forecast financial
information and Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. To the extent disclosed above, the Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcements.
RESOURCES SUMMARY
Yin Ironstone Complex – Yin, Yin South, Y2, Sabre Measured, Indicated and Inferred Resources
Table 2: Summary of Yin Resources at 0.20% TREO Cut off.
Measured
Type
Oxide
Fresh
Total
Tonnes
(Mt)
2.47
2.70
5.17
TREO
(%)
1.61
1.09
1.34
Indicated
TREO
(kt)
39.7
29.5
69.3
Tonnes
(Mt)
13.46
7.67
21.13
Inferred
TREO
(%)
1.06
0.95
1.02
TREO
(t)
142.6
72.8
215.4
Tonnes
(Mt)
1.51
2.17
3.68
TREO
(t)
106.4
47.9
154.3
Tonnes
(Mt)
0.26
0.42
0.68
TREO
(%)
0.75
0.75
0.75
Total
TREO
(t)
11.2
16.3
27.6
Tonnes
(Mt)
17.44
12.54
29.98
TREO
(%)
1.11
0.95
1.04
TREO
(t)
4.3
7.3
11.6
Tonnes
(Mt)
7.20
4.43
11.63
TREO
(%)
2.03
1.76
1.93
TREO
(t)
193.6
118.7
312.3
NdPr:TREO
Ratio (%)
29
29
29
Table 3: Summary of Yin Resources at 1.00% TREO Cut off.
Measured
Type
Oxide
Fresh
Total
Tonnes
(Mt)
1.60
1.36
2.96
TREO
(%)
2.22
1.68
1.97
Indicated
TREO
(kt)
35.6
22.8
58.4
Tonnes
(Mt)
5.34
2.65
7.99
Inferred
TREO
(%)
1.99
1.81
1.93
TREO
(%)
1.67
1.72
1.70
Total
TREO
(t)
146.3
78.0
224.3
NdPr:TREO
Ratio (%)
30
29
29
Gifford Creek Carbonatite – Inferred Resource
Table 4: Summary of the Gifford Creek Carbonatite Inferred Resource at various % TREO Cut offs.
Cut-Off (%TREO)
0.90
0.70
0.50
0.30
Resource (Mt)
5.73
10.84
20.55
45.87
TREO
(%)
1.18
1.00
0.80
0.58
NdPr:TREO
(%)
21
21
21
21
Nb2O5
(%)
0.25
0.22
0.15
0.10
P2O5
(%)
3.8
3.5
3.0
2.7
TiO2
(%)
5.4
4.9
3.9
3.0
Sc
(ppm)
92
85
68
52
Contained
TREO (t)
67,500
108,000
164,600
265,300
Contained
Nb2O5 (t)
14,500
23,700
31,100
44,800
Star of Mangaroon – Indicated and Inferred Resources
Table 5: Resource (2g/t Au cut off grade) - Numbers may not add up due to rounding
Type
Transition
Fresh
Total
ASX:DRE
Indicated
Tonnes
1,900
42,500
44,400
Au (g/t)
26.9
13.0
13.6
Inferred
Au (Oz)
1,700
17,800
19,500
Tonnes
12,200
12,200
Au (g/t)
9.8
9.8
Total
Au (Oz)
3,900
3,900
Tonnes
1,900
54,700
56,600
Au (g/t)
26.9
12.3
12.8
Au (Oz)
1,700
21,700
23,400
Dreadnought Resources Ltd 7
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Table 6: Significant Rock Chips >0.1g.t Au or 0.1% Pb (GDA94 z50).
Sample ID
Easting
Northing
JRK001
340352
7366179
JRK002
340354
7366181
JRK003
JRK004
340327
340272
7366198
7366251
SRRK001
340561
7366175
SRRK002
340508
7366179
SRRK003
SRRK004
341064
340864
7365725
7365788
SRRK006
340518
7366079
SRRK007
340376
7366175
SRRK008
340474
7366120
SRRK016
SRRK025
340489
340535
7366193
7366210
123104
340347
7366083
123105
340523
7365947
123117
340345
7366085
123118
123119
340321
340317
7366104
7366107
123197
342799
7365095
123198
342768
7365019
Au
(g/t)
Ag
(g/t)
Pb
(%)
Company
7.5
0.4
-
DRE
30.3
1.1
-
DRE
0.7
1.3
0.7
0.7
0.1
0.1
DRE
DRE
15.7
-
-
DRE
155.5
-
-
DRE
1.8
0.6
-
-
DRE
DRE
100.5
-
-
DRE
14.5
-
-
DRE
49.5
-
-
DRE
49.9
38.2
-
-
DRE
DRE
5.8
-
-
Helix
116.0
-
-
Helix
12.2
-
-
Helix
0.1
0.1
-
-
Helix
Helix
0.3
32.0
1.2
Helix
-
1.0
0.1
Helix
Sample Description
Gossanous & pyritic
quartz vein
Gossanous & pyritic
quartz vein
Gossanous quartz vein
Gossanous quartz vein
Gossanous quartz
vein
Gossanous quartz
vein
Gossanous quartz vein
Gossanous quartz vein
Gossanous quartz
vein
Gossanous quartz
vein
Gossanous quartz
vein
Gossanous vein
Gossanous vein
Gossanous & pyritic
quartz vein
Gossan and minor
quartz
Gossanous & pyritic
quartz vein. Same as
123104
Quartz vein
Quartz vein
Quartz vein with
malachite
Quartz vein
Table 7: Details of modelled FLEM conductors (GDA94 z50).
Depth
Dimensions
Plate
Easting Northing
to Top
1140_p1 336533
7364009
-7m
101x10m
1140_p2 336591
7364007
-20m
24x10m
1160_p1 336788
7364298
-15m
33x12m
1160_p2 336886
7364337
-20m
47x12m
Dip
54
60
34
60
Dip
Direction
152
149
106
184
Prospect
Steve’s Reward
-
Conductivity
Thickness (S)
450
750
2750
2900
Prospect
Inevitable
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling techniques
•
Rock Chips
•
•
•
ASX:DRE
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
Rock Chips were collected by Dreadnought staff and
submitted for analysis. Rock chips are random, subject to
bias and often unrepresentative for the typical widths
required for economic consideration. They are by nature
difficult to duplicate with any acceptable form of precision or
accuracy.
Rock chips have been collected by Dreadnought to assist in
characterising different lithologies, alterations and
expressions of mineralisation. In many instances, several
rock chips were collected from a single location to assist
with characterising and understanding the different
lithologies, alterations and expressions of mineralisation
present at the locality.
Rock chips were submitted to ALS Laboratories in Perth for
determination of gold by fire assay and ICP-MS finish (ALS
Method Au-ICP22) and 48 other elements by four acid
Dreadnought Resources Ltd 8
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Criteria
JORC Code explanation
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed information.
Commentary
digest and ICP-MS finish (ALS Method ME-MS61).
Soil Sampling
Soil samples were collected by Dreadnought and contractor
(OZEX Exploration Services) personnel on a 800x50m,
400x50m, 200x50m or 100x50m grid across the Project.
Samples were collected by digging a 30x30x10cm pit,
homogenising and then sieving and collection of a dry 200g 177µm sample.
Soils samples were submitted to Labwest (Perth) for Ultra
Fine Fraction (UFF) separation (<2µm) and analysis by Aqua
Regia ICP-MS & ICP-OES for determination of Au and 45
other elements.
Stream Sediment Sampling
Soil samples were collected by Dreadnought and contractor
(OZEX Exploration Services) personnel on a ~1 sample per
5 sq km drainage catchment across the Project, and infilled
to ~1 sample per 1 sq km drainage catchment in areas of
interest.
Samples were collected by digging multiple pits across active
drainage lines in areas with the most fine material and then
sieving and collection of a dry 200g -177µm sample.
Stream sediment samples were submitted to Labwest
(Perth) for Ultra Fine Fraction (UFF) separation (<2µm) and
analysis by Aqua Regia ICP-MS & ICP-OES for determination
of Au and 45 other elements.
VTEM
Versatile time domain electromagnetic (VTEM) and
aeromagnetic data was flown by UTS Geophysics using an Astar 350 B3 helicopter with a VTEM max receiver and
transmitter and Geometrics caesium vapour magnetic
sensor.
The VTEM Max survey was flown at 200m line spacings in a
north-south orientation at Bordah and northeast-southwest
orientation at Tiger for a total of 983 flight kms. The terrain
clearance for the helicopter was 83m, the EM sensor at 35m
and magnetic sensor at 73m.
Given the normal airspeed for a helicopter of 80100km/hour and a data recording rate of 0.1 points per
second, geophysical measurements are acquired
approximately every 2-4m along the survey line.
The VTEM Max configuration was:
-
Transmitter loop diameter: 35m
-
Peak dipole movement – 7000,000NIA
-
Transmitter Pulse Width: 7ms
VTEM Max Receiver: Z, X coils (Y Optional)
FLEM Survey
Fixed Loop EM (FLEM) surveyed at 25m-50m station spacing
with 25 and 50m spaced lines.
FLEM stations were planned perpendicular to geological
strike of target horizons.
Drilling techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
No drilling undertaken.
Drill sample recovery
•
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
No drilling undertaken.
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
No drilling undertaken.
•
•
Logging
ASX:DRE
•
Dreadnought Resources Ltd 9
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Criteria
JORC Code explanation
•
•
Sub-sampling
techniques and sample
preparation
•
•
•
•
•
•
Quality of assay data
and laboratory tests
•
•
•
Commentary
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
Rock Chips
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Rock Chips
Entire rock chips were submitted to the lab for sample prep
and analysis.
No drilling undertaken.
Assay technique is Fire Assay which is a ‘Total Technique’
for Au. Four acid digest is considered a ‘near total’ technique
for the 48 elements received under ME-MS61.
Standard laboratory QAQC is undertaken and monitored by
the laboratory and by the company upon assay result
receival.
Stream Sediment and Soil Samples
Samples were screened in the field to -177µm.
Labwest then takes a sub-sample of <2µm material for
analysis.
The UFF sample preparation was defined following a
Research and Development project conducted under the
direction of CSIRO.
Field duplicates are submitted and perform to internal DRE
standards.
Orientation work as part of CSIRO research and previous
work by Dreadnought Resources indicates the grain size is
appropriate for the material being tested.
VTEM
The VTEM Max survey was flown at 200m line spacings in a
north-south orientation at Bordah and northeast-southwest
orientation at Tiger for a total of 983 flight kms. The terrain
clearance for the helicopter was 83m, the EM sensor at 35m
and magnetic sensor at 73m.
Given the normal airspeed for a helicopter of 80100km/hour and a data recording rate of 0.1 points per
second, geophysical measurements are acquired
approximately every 2-4m along the survey line.
The VTEM Max configuration was:
-
Transmitter loop diameter – 35m
-
Peak dipole movement – 7000,000NIA
-
Transmitter Pulse Width – 7ms
-
VTEM Max Receiver – Z, X coils (Y Optional)
Transmitter base frequency – 25 Hz
FLEM Survey
The Company commissioned Southern Geoscience
Consultants (SGC) of Perth to supervise the (FLEM) surveys
that were undertaken by SGC Niche Acquisitions.
The geophysical FLEM program parameters were as follows:
Contractor: SGC Niche Acquisition
Configuration: Fixed-Loop Time Domain
Tx Loop size: 250 x 250 m
Transmitter: DRTX
Receiver: Smartem24
Sensor: 3C Fluxgate (B-field)
Line spacing: 25 and 50m
Line bearing: NW-SE
ASX:DRE
Dreadnought Resources Ltd 10
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Criteria
Verification of
sampling and assaying
JORC Code explanation
Commentary
•
Station spacing: 25m
Tx Freq.: 4.1667 Hz
Duty cycle: 50%
Current: 30 Amp
Rock Chips
•
•
•
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
All significant results are revisited with follow up sampling
and mapping.
Geochemical sample coordinates and geological information
is written in field books and coordinates and track data
saved from handheld GPSs used in the field.
Field data is entered into excel spreadsheets and then loaded
into a geological database.
Soil Samples
All significant results are revisited with follow up sampling
(upstream) including occasionally a repeat sample from the
original location.
FLEM Survey
Geophysical data has been assessed by Southern Geoscience
Consultants.
Geophysical data was recorded by the Smartem24 and
downloaded in the field and emailed to Southern Geoscience
Consultants daily.
Geophysical data is backed up to tape weekly.
Location of data points
•
•
•
Data spacing and
distribution
•
•
•
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
All sample locations were recorded with a Garmin handheld
GPS which has an accuracy of +/-3m
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
The soil and stream sediment sample spacing and
distribution is not sufficient to establish the degree of
geological and grade continuity appropriate for a Mineral
Resource.
GDA94 MGAz50
VTEM
The VTEM survey used a NovaTel WAAS GPS reciver with
positional accuracy of <1.8m
VTEM
The VTEM Max survey was flown at 200m line spacings in a
north-south orientation at Bordah and northeast-southwest
orientation at Tiger for a total of 983 flight kms. The terrain
clearance for the helicopter
Share your feedback
Discover