ASX ANNOUNCEMENT 31 January 2024
31 December 2023 Quarterly Activities Report
The Board of Dreadnought Resources Ltd (ASX:DRE) (“Dreadnought” or “the Company”)
is pleased to provide a summary of activities for the quarter ended 31 December 2023.
OVERVIEW OF ACTIVITIES
During the quarter, the Company advanced its project portfolio including the delivery of drilling programs at
Mangaroon for Au, Ni-Cu-PGEs and REEs and at Tarraji-Yampi for Cu-Au. Additionally, the Company delivered an
independent JORC 2012 Mineral Resource (“Resource”) for the Yin REE Ironstones resulting in combined Measured,
Inficated and Inferred Resources at Mangaroon of 40.82Mt @ 1.03% TREO. Mangaroon REE is a strategic, long-life
asset containing multiple critical minerals located in the world’s premier mining investment location, Western Australia.
With Resource activities at Mangaroon REE now complete, near-term activities focus on gold at Mangaroon and
Central Yilgarn and Cu-Au-Co at Tarraji-Yampi in addition to our nickel joint venture work with First Quantum
Minerals along the Money Intrusion.
HIGHLIGHTS OF THE QUARTER INCLUDE:
MANGAROON REE (100%)
Yin REE Ironstones (100%)
Assays for 68 holes from extensional and infill drilling at Yin were the thickest and highest NdPr:TREO ratio results to
date. Drilling included the following intercepts:
YINRC426:
100m @ 3.01% TREO (19% NdPr:TREO) from 138m including:
25m @ 4.40% TREO
YINRC402:
YINRC397:
YINRC394:
YINRC371:
YINRC369:
(19% NdPr:TREO) from 138m.
164m @ 1.08% TREO (27% NdPr:TREO) from 79m including:
29m @ 2.00% TREO
(27% NdPr:TREO) from 83m.
53m @ 1.62% TREO
(24% NdPr:TREO) from 43m including:
4m @ 6.51% TREO
(24% NdPr:TREO) from 46m.
13m @ 4.07% TREO
(37% NdPr:TREO) from 38m including:
6m @ 6.01% TREO
(36% NdPr:TREO) from 40m.
7m @ 1.16% TREO
(42% NdPr:TREO) from surface including:
1m @ 2.73% TREO
(67% NdPr:TREO) from 5m and:
37m @ 2.67% TREO
(30% NdPr:TREO) from 69m including:
24m @ 3.29% TREO
(30% NdPr:TREO) from 78m.
33m @ 2.01% TREO
(28% NdPr:TREO) from 123m including:
10m @ 3.18% TREO
(28% NdPr:TREO) from 129m.
dreadnoughtresources.com.au
1
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
On 30 November 2023, Dreadnought announced a large, independent Resource at Yin of 29.98Mt @ 1.04% TREO
(87% Measured and Indicated). This Resource was delivered within 18 months from discovery and contains significant
NdPr at various cut-off grades.
Cut-Off
(%TREO)
0.20
0.40
1.00
Table 1: Yin Resource as adjusted for different cut-off grades.
Resource
TREO
NdPr:TREO Contained TREO
Contained NDPr
(Mt)
(%)
(%)
(t)
(t)
29.98
1.04
29%
311,800
89,900
21.06
1.35
29%
82,100
284,300
11.63
1.93
29%
66,300
224,400
The oxide/fresh composition of the Resource is shown in Table 2 together with the 87% Measured and Indicated
component.
Table 2: Summary of Yin Resources at 0.20% TREO Cut-off.
Resource
Classification
Measured
Measured
Measured
Indicated
Indicated
Indicated
Inferred
Inferred
Inferred
Total
Total
Geology
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
TOTAL
Tonnes
(Mt)
TREO
(%)
NdPr:TREO
Ratio (%)
Contained
TREO (t)
Contained NDPr
2.47
2.70
5.17
13.46
7.67
21.13
1.51
2.17
3.68
17.44
12.54
29.98
1.61
1.09
1.34
1.06
0.95
1.02
0.75
0.75
0.75
1.11
0.95
1.04
29
27
28
29
29
29
25
28
27
29
29
29
39,700
29,500
69,300
142,600
72,800
215,400
11,200
16,300
27,600
193,600
118,700
312,300
11,400
8,100
19,500
41,000
21,300
62,300
2,800
4,500
7,300
55,300
33,900
89,300
Figure 1: Local geological relationships between the Gifford Creek Carbonatite and the known ironstones across the Yin and the
nearby Yangibana deposits. The ~4.6km long Yin Ironstone Resource is highlighted (orange).
dreadnoughtresources.com.au
2
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
Gifford Creek Carbonatite REE-Nb-P-Ti-Sc (100%)
Globally, carbonatite intrusions host various commodities like rare earths, niobium, titanium, phosphate, and scandium,
often as separate bodies within the same intrusion. Examples include Mt Weld in Australia, Ngualla in Tanzania, Bayan
Obo in China, Palabora in South Africa, and Araxa in Brazil. In addition, the intrusions can occupy a relatively small
footprint (700m x 150m) such as the world-class Mountain Pass deposit in California.
Figure 2: RC drilling at the Gifford Creek Carbonatite.
The Gifford Creek Carbonatite is considered to be the regional source of the nearby Yin and Yangabana REE Irontones.
Despite having minimal outcrop, an initial independent inferred Resource of 10.84Mt @ 1.00% TREO has been defined
within XX months after discovery (ASX 2 Oct 2023). Subsequently, wide spaced (360m x 180m) RC drilling has identified
three additional areas of mineralisation. This means that four zones of mineralisation have been identified with <25%
of the >17 km long Gifford Creek Carbonatite tested.
Significant intercepts during the quarter include:
CBRC139: 12m @ 1.14% TREO
2.8 kg/t Nd2O3+Pr6O11
(24% NdPr:TREO) from 36m within:
27m @ 0.87% TREO
2.2 kg/t Nd2O3+Pr6O11
(25% NdPr:TREO) from 30m
CBRC148: 12m @ 1.09% TREO
2.2 kg/t Nd2O3+Pr6O11
(20% NdPr:TREO) from 54m within:
78m @ 0.55% TREO
1.2 kg/t Nd2O3+Pr6O11
(22% NdPr:TREO) from 51m
CBRC155: 24m @ 1.24% TREO
3.1 kg/t Nd2O3+Pr6O11
(25% NdPr:TREO) from 60m within:
57m @ 0.80% TREO
2.0 kg/t Nd2O3+Pr6O11
(25% NdPr:TREO) from 48m
These areas contain other critical minerals and have returned some of the highest-grade niobium, phosphate and
scandium (“Nb-P-Sc”) results to date:
CBRC138: 3m @ 1.37% Nb2O5 from 90m
and
*CBRC111: 9m @ 1.40% Nb2O5 from 72m
CBRC143: 6m @ 18.4% P2O5 from 114m
and
CBRC142: 18m @ 13.6% P2O5 from 108m
CBRC148: 43m @ 11.9% P2O5 from 87m
and
CBRC138: 12m @ 319ppm Sc from 48m
dreadnoughtresources.com.au
3
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
In October 2023, Dreadnought received a further GSWA EIS grant of $180,000 for RC drilling to target gravity
anomalies within the ~17km long Gifford Creek Carbonatite and test for REE, niobium, titanium, phosphate and
scandium mineralisation. Dreadnought has received three EIS grants in 2023 totaling $620,000 to support drilling at
the Yin ironstones, the Gifford Creek Carbonatite (both at Mangaroon) and at Orion (Tarraji-Yampi) (ASX 27 Oct 2023).
Figure 3: Plan view of the Gifford Creek Carbonatite over a greyscale magnetic image (RTP 1VD) and ortho image showing
drilled (red dots) hole locations highlighting recent drilling results and the C3 Resource.
dreadnoughtresources.com.au
4
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
MANGAROON Ni-Cu-Co-3PGE (First Quantum Earn-In)
Bookathanna North and High Range Prospects
First Quantum Minerals Ltd (TSE:FM “First Quantum Minerals”), a ~A$20B TSX listed company, exercised an earn-in
option over the Mangaroon Ni-Cu-PGE Project in 2022. First Quantum Minerals has funded the option period and can
now earn an initial 51% interest by funding $12M of expenditure by 1 March 2026. First Quantum Minerals may
withdraw at any time during the earn-in phase with 0% interest (ASX 30 August 2022).
This quarter’s results identified thick near surface sulphide mineralisation with high grade massive and semi massive
sulphides within the Money Intrusion. Assays from a 10-hole RC drill program (REYRC013-022) show all holes into
the keel of the intrusion at Bookathanna North (6 out of 7 holes) successfully intersected mineralisation including:
REYRC013: 23m @ 0.50% Ni
0.51% Cu
0.02% Co
0.49g/t 3PGE from 36m including:
2m @ 3.32% Ni
2.88% Cu
0.12% Co
1.46g/t 3PGE from 45m
REYRC014: 22m @ 0.18% Ni
0.24% Cu
0.01% Co
0.24g/t 3PGE from 34m including:
7m @ 0.30% Ni
0.44% Cu
0.02% Co
0.38g/t 3PGE from 41m
REYRC018: 53m @ 0.15% Ni
0.22% Cu
0.01% Co
0.08g/t 3PGE from 5m including:
1m @ 0.29% Ni
1.50% Cu
0.01% Co
0.11g/t 3PGE from 47m
REYRC019: 10m @ 0.36% Ni
0.45% Cu
0.02% Co
0.18g/t 3PGE from 76m including:
2m @ 1.15% Ni
1.30% Cu
0.06% Co
0.36g/t 3PGE from 78m
These results follow the first 12-hole program intersected mineralisation in all holes including:
REYRC002: 13m @ 0.19% Ni
0.17% Cu
0.01% Co
0.08g/t 3PGE from 70m including:
1m @ 0.85% Ni
0.77% Cu
0.05% Co
0.17g/t 3PGE from 80m.
Figure 4: Plan view image showing the location of Bookathanna
North drilling (REYRC013-022, red dots) in relation to previous
drilling (REYRC001-012, black dots) and planned 7-hole program
(REYRC023-029, white dots) over a magnetics (RTP 1VD) and ortho
image. The Money Intrusion is outlined in green.
dreadnoughtresources.com.au
5
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
MANGAROON AU (100%)
Mangaroon covers ~5,000kms2 of the Mangaroon Zone in the Gascoyne Region of Western Australia. The region is
host to high-grade gold mineralisation at the Bangemall/Cobra and Star of Mangaroon gold mining centres which have
seen minimal modern exploration.
Dreadnought has consolidated the historic mining centres around the Star of Mangaroon and located outcropping highgrade gold bearing quartz veins along the Edmund and Minga Bar Faults. The Star of Mangaroon is situated along a
14km long shear zone containing dozens of historical gold workings with the limited drilling restricted to a ~200m
strike at the Star of Mangaroon. The Star of Mangaroon was discovered in 1956 and, until recently, has been the largest
gold producer in the Gascoyne. Between 1960 and 1983 the mine produced 7,464 oz at an average grade of 34.8g/t
Au. Most of the gold production came from underground with the lowest extraction level ~90m below surface.
The Star of Mangaroon has received little exploration despite drilling undertaken in the 1990s which produced
significant results including (ASX: 6 June 2023, 4 September 2023):
MA10: 4m @ 26.0 g/t Au from 9m
MA17: 7m @ 14.3 g/t Au from 21m
MA23: 2m @ 29.8 g/t Au from 19m
MA43: 1m @ 53.0 g/t Au from 18m
SMC07: 4m @ 18.7 g/t Au from 18m
SMC09: 4m @ 16.4 g/t Au from 14m
The majority of historical drilling is within 50m of surface. Only one hole has been drilled >100m which returned 4m
@ 3.76 g/t Au from 176m (STMRC005) and highlights the potential at depth.
A program of 18 RC holes (1,725m) and 2 diamond holes (137.9m) was drilled during the quarter and successfully
confirmed and extended mineralisation along strike and at depth. Significant results include (ASX: 11 December 2023):
SOMRC004: 9m @ 13.4 g/t Au from 9m including 2m @ 59.4g/t Au from 16m
SOMRC005: 7m @ 23.0 g/t Au from 53m including 3m @ 48.9g/t Au from 54m
SOMRC006: 8m @ 15.5 g/t Au from 89m including 3m @ 30.4g/t Au from 90m
Figure 5: Long section along ~1km of the Star of Mangaroon Shear Zone showing the location of recently drilled holes in relation to
previous drilling and the interpreted lodes remaining open and untested at depth. 1. Prime Minerals Annual Report 2008, WAMEX Report A79994
dreadnoughtresources.com.au
6
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
Figure 6: Plan view image showing the location of recently drilled holes in relation to previous drilling over an ortho image. The surface
projection of the Star of Mangaroon lode is in red.
.
dreadnoughtresources.com.au
7
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
TARRAJI-YAMPI E04/2315 (80%) and E04/2508 (100%)
Tarraji-Yampi is located entirely within the Yampi Sound Training Area (“YSTA”), a Commonwealth Defence Reserve
in the West Kimberley, ~80kms from the port of Derby. The YSTA is the second largest Defence Reserve in Australia
after Woomera in South Australia and was off limits to mineral exploration from 1978 to 2013.
The only significant exploration undertaken in the area was by WMC Resources in 1958 and Australian Consolidated
Minerals in 1972, with both parties exploring for copper. Since opening for exploration in 2013, Dreadnought has
secured the largest ground holding within the YSTA and developed strong working relationships with both the
Department of Defence and the Dambimangari People.
In October 2023, the Company announced the completion of a shortened drilling program and geophysical surveys.
The drilling comprised 11 RC holes (1,289m) and 2 diamond holes (530.3m) and faced operational challenges such as
bush fires and rig breakdowns. Accordingly, the program was limited to effectively testing only 4 of 13 targets.
Nevertheless, the program yielded promising results.
Diamond holes KMRD056 and KMRD057 extended mineralisation at Orion by 100m down dip, making Orion ~350m
wide x 150m long x 250m deep, with modeling indicating potential for depth to >500m. Additionally, 7 RC holes testing
EM conductors revealed mineralisation similar to that found around Orion's fringes, with downhole EM confirming the
presence of off-hole and edge-hit anomalies. Two RC holes drilled into Ironclad intersected quartz-sulphide veining
along a significant structure. However, two RC holes were abandoned due to ground conditions, leaving their
respective targets effectively untested.
Completion of the planned program is planned for 2024 as is follow-up on the promising results achieved.
Figure 7: Photo of the RC rig with heavy smoke obscuring the sun due to bush fires within the project area.
dreadnoughtresources.com.au
8
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
BRESNAHAN REE-HREE-Au-Sb (100%)
Bresnahan is a conceptual unconformity heavy rare earth element (“HREE”) project containing >3,700kms2 of
prospective ground. Bresnahan is located ~125km southwest of Newman in the Ashburton Basin and is accessible by
the Ashburton Downs – Meekatharra Road.
Bresnahan is a significant first mover opportunity for unconformity HREE and Au-Ag-Sb deposits. Bresnahan is also
believed to be the first application of the unconformity HREE model outside the Athabasca Basin in Canada and the
North Australia Craton (including Browns Range) where the model was developed.
The Bresnahan Basin and the unconformable contact with the underlying Wyloo Group sediments is interpreted to be
a similar geological setting to that seen at the Athabasca Basin in Canada and Browns Range in Western Australia.
These settings form the basis of the unconformity HREE model, originally published in 2018 in collaboration with
Northern Minerals Ltd. Rare earths were identified within the Bresnahan Basin as early as 2008; however, their
significance was not recognised due to the lack of a coherent geological model.
During the quarter, the Company announced that it had entered into an agreement to acquire 100% of two tenements
covering 20kms2 strategically located within Dreadnought’s 100% owned HREE-Au-Ag-Sb Bresnahan project. The
acquisition represents a significant regional consolidation over a highly prospective area. The key commercial terms of
the acquisition were announced on 4 October 2023.
Figure 8: Plan view geology map of Bresnahan showing the location of recently collected rock chips in relation to the
major structures, the Bresnahan-Wyloo unconformity and major geological units.
dreadnoughtresources.com.au
9
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
CORPORATE
Corporate activities during the quarter included:
Placement: Dreadnought raised $5m (before costs) via a placement. The placement compromised 106,382,979
fully paid ordinary shares at $0.047.
Share Purchase Plan (“SPP”): the SPP was on same terms as the placement and raised $0.628m.
Exploration Incentive Scheme (“EIS”): On 25 October 2023, Dreadnought announced the award of a co-funded
drilling grant of $0.18m under the Geological Survey of Western Australia’s merit-based Exploration Incentive Scheme
(“EIS’). for the Gifford Creek REE Carbonatite at Mangaroon (100%).
Performance Rights: A total of 17,500,000 rights were issued to employees (including 3,600,000 to the Managing
Director, Dean Tuck (or his nominees), as approved by shareholders at the AGM, on 5 December 2023. The
Performance Rights were divided equally into four classes with different vesting conditions as follows:
•
•
•
•
Class D: the 20-day Volume Weighted Average Price (“VWAP”) being >$0.10;
Class E: the 20-day VWAP being >$0.15 cents;
Class F: completion of 12 months continued service from the date of issue; and
Class G: completion of 24 months continued service from the date of issue.
Cash at Bank: At the end of the quarter, the Company had $2.8m cash at bank which excludes funds from the R&D
Incentive ($2.1m) and earn-in/JV partner ($0.5m) which will be received subsequent to the end of the quarter. The level
of exploration activities have significantly decreased following completion of the Mangaroon REE Resource drill out.
Appendix 5B Disclosures: The Company’s accompanying Appendix 5B (Quarterly Cashflow Report) shows
directors’ remuneration (including superannuation) of $140k (Item 6.1) and $54k (Item 6.2) which were
apportioned between corporate and exploration work respectively.
During the period, the Company spent $5.6m on exploration and study activities in WA. The expenditure represents
direct costs associated with the various studies, surveys, drilling programs and associated assays outlined in this report.
The level of exploration activities have significantly decreased following completion of the Mangaroon REE Resource drill
out.
Capital Structure at 31 December 2023:
Quoted Securities
Fully Paid Ordinary Shares
Unquoted Securities
Options @ $0.005 expiring 09/04/2024
Options @ $0.005 expiring 30/06/2024
Options @ $0.04 expiring 2/07/2024
Options @ $0.06 expiring 11/08/2024
Options @ $0.06 expiring 26/11/2024
Options @ $0.065 expiring 14/07/2025
Options @ $0.094 expiring 9/10/2025
Options @ $0.1575 expiring 16/12/2025
Options @ $0.12 expiring 2/03/2026
Options @ $0.075 expiring 14/06/2026
Performance Rights expiring 31/12/2025
dreadnoughtresources.com.au
3,479,072,960
30,000,000
1,500,000
12,100,000
2,000,000
2,000,000
8,500,000
6,000,000
853,098
1,223,151
2,000,000
17,500,000
10
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ASX ANNOUNCEMENTS
During the quarter, the Company made 33 ASX announcements, 15 of which were market sensitive (1.25 market
sensitive announcements per week). These announcements were as follows:
December 2023
22/12/2023
Change of Director's Interest Notice x 2
22/12/2023
Cleansing Notice
22/12/2023
Application for quotation of securities - DRE
11/12/2023
Thick, High-Grade Gold Including 7m @ 23.0g/t Au - Mangaroon
6/12/2023
Change of Director's Interests Notice - Dean Tuck
6/12/2023
Gifford Creek REE-Nb-P-Ti-Sc Carbonatite Drilling Update
5/12/2023
Notification regarding unquoted securities - DRE
November 2023
30/11/2023
Large, High Confidence Yin Ironstone Resource - Mangaroon
29/11/2023
Trading Halt
23/11/2023
Results of Meeting
23/11/2023
AGM Presentation
23/11/2023
Chair's Address to Shareholders
20/11/2023
16 Camp Scale Lithium Targets at Central Yilgarn & Mangaroon
8/11/2023
Further Ni-Cu-Co-3PGE Assays & Drilling to Recommence
2/11/2023
Launch of Interactive Investor Hub
1/11/2023
Gold Drilling Commenced at Star of Mangaroon
31/10/2023
Quarterly Cashflow Report - September 2023
31/10/2023
Quarterly Activities Report - September 2023
30/10/2023
Application for quotation of securities - DRE
30/10/2023
Completion of Share Purchase Plan
27/10/2023
$180,000 Drilling Grant for Mangaroon REEs - Amendment
26/10/2023
Significant HREE, Gold and Uranium Potential - Bresnahan
25/10/2023
$180,000 Drilling Grant for Mangaroon REEs
October 2023
24/10/2023
Notice of Annual General Meeting/Proxy Form
24/10/2023
Drilling and Geophysical Surveys Completed at Tarraji-Yampi
16/10/2023
100m Thick Rare Earth Intercepts from Y–n - Mangaroon
9/10/2023
Notification regarding unquoted securities - DRE
9/10/2023
Share Purchase Plan Offer Document
9/10/2023
Cleansing Notice
9/10/2023
Application for quotation of securities - DRE
4/10/2023
Proposed issue of securities - DRE
4/10/2023
Bresnahan (100%) Acquisition & Consolidation
2/10/2023
Mangaroon Carbonatite Now Over 17km With Higher Grade Zones
dreadnoughtresources.com.au
11
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ACKNOWLEDGEMENTS
Dreadnought would like to acknowledge the continued support of the Dambimangari, Thiin Mah, Budina and
Thudgari People, Department of Defence, Lyndon, Maroonah, Gifford Creek, Turee Creek and Mount Vernon
Stations, our Joint Venture Partners Whitewater Resources Pty Ltd and First Quantum Minerals, Frontier
Helicopters, Fortescue Helicopters, Newexco, Southern Geoscience Consultants, Hagstrom Drilling,
Northfields, Ozex, Onshore Environmental, JBS&G, Quick Camps, Desert City, Jarrahbar Contracting,
Gascoyne Haulage and Derby Stock Supplies.
UPCOMING NEWSFLOW
February: Results of Central Yilgarn Project Review (100%)
13-15 February 2024: RIU Explorers Conference, Fremantle
February: Update on Ni-Cu-Co-PGE Drilling and IP Survey at Mangaroon (Earn-in)
February/March: Assays from RC drilling at Tarraji-Yampi (80%, 100%)
February/March: Results from target generation and definition work at Bresnahan HREE-Au-U (100%)
March: Half Year Financial Report
March: Results from surface sampling & mapping of LCT targets at Mangaroon & Central Yilgarn (100%)
March: Commencement of RC & diamond drilling at Mangaroon Ni-Cu-Co-PGE (Earn-in)
March/April: Commencement of RC drilling at Mangaroon Au (100%)
For further information please contact:
Dean Tuck
Managing Director
Dreadnought Resources Limited
E: dtuck@dreres.com.au
~Ends~
Jessamyn Lyons
Company Secretary
Dreadnought Resources Limited
E: jlyons@dreres.com.au
This announcement authorised for release to the ASX by the Board of Dreadnought.
dreadnoughtresources.com.au
12
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts
and forward-looking information. Such forecasts, projections and information are not a guarantee of future performance, involve
unknown risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed
or implied. There are a number of risks, both specific to Dreadnought, and of a general nature which may affect the future
operating and financial performance of Dreadnought, and the value of an investment in Dreadnought including and not limited
to title risk, renewal risk, economic conditions, stock market fluctuations, commodity demand and price movements, timing of
access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve
estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and mining development, construction and
commissioning risk.
Competent Person’s Statement – Exploration Results
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was
compiled by Mr. Dean Tuck, who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of t‘e 'Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the announcement of the
matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the original
reports, and that the forma and context in which the Competent Person’s findings are presented have not been materially
modified from the original reports.
Competent Person’s Statement – Mineral Resources
The information in this announcement that relates to Mineral Resources is based on information compiled by Mr. Lynn
Widenbar, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Widenbar is a
full-time employee of Widenbar and Associates Pty Ltd. Mr. Widenbar has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity that is being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Minerals Resources and
Ore Reserves’. Mr. Widenbar consents to the inclusion in the announcement of the matters based on his information in the
form and context that the information appears.
Disclaimer
References in this announcement may have been made to certain previous ASX announcements, which in turn may have
included Exploration Results, Exploration Targets, Mineral Resources, Ore Reserves and the results of Pre-Feasibility Studies.
For full details, please refer to the said announcement on the said date. The Company is not aware of any new information or
data that materially affects this information. Other than as specified in this announcement and mentioned announcements,
the Company confirms it is not aware of any new information or data that materially affects the information included in the
original market announcement(s), and in the case of estimates of Mineral Resources that all material assumptions and technical
parameters underpinning the estimates in the relevant announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original announcement.
dreadnoughtresources.com.au
13
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
SCHEDULE OF INTERESTS IN MINING TENEMENTS (as at 31 December 2023)
Tenement
Project
Location
Status
E04/2315
E04/2508
E04/2557
E04/2572
E04/2608
E04/2675
E04/2676
E04/2860
E04/2861
E04/2862
E04/2863
E04/2560
P04/0306
P04/0307
P04/0308
P04/0309
E08/3178
E08/3274
E08/3275
E08/3356
E08/3439
E08/3616
E09/2290
E09/2359
E09/2370
E09/2384
E09/2405
E09/2433
E09/2448
E09/2449
E09/2450
E09/2467
E09/2473
E09/2478
E09/2531
E09/2535
E09/2616
E09/2620
E09/2783
E09/2937
M09/0091
M09/0146
M09/0147
M09/0174
M09/0175
L09/0104
L09/0108
L09/0109
L09/0111
Tarraji
Yampi
Yampi
Yampi
Yampi
Mt Humbert
Mt Humbert
Tarraji
Tarraji
Tarraji
Tarraji
Wombarella
Wombarella
Wombarella
Wombarella
Wombarella
Mangaroon
Mangaroon
Mangaroon
Bresnahan
Mangaroon
Bresnahan
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Mangaroon
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Kimberley, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Gascoyne, WA
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Application
Application
Application
Application
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Application
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Application
Application
Granted
Granted
Granted
Granted
Granted
Application
Granted
Granted
Granted
dreadnoughtresources.com.au
Interest Start of
Quarter
80%1
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
-
Interest End of
Quarter
80%1
100%
100%
0%6
100%
0%6
0%6
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%6
100%
100%
100%
100%
100%
100%3
100%3
100%3
14
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
1
2
3
4
5
6
Tenement
Project
Location
Status
E16/0495
E29/0957
E29/0959
E29/0965
E29/1050
E29/1074
E29/1153
E29/1204
E29/1205
L29/0143
E30/0471
E30/0476
E30/0485
E30/0493
E30/0494
E30/0499
E30/0534
E30/0553
E30/0554
E30/0558
P30/1157
E77/2403
E77/2416
E77/2432
E77/2634
E52/3412
E52/3462
E52/3936
E52/3937
E52/4083
E52/4139
E52/4141
E52/4142
E52/4143
E52/4144
E52/4145
E52/4147
E52/4228
E52/4256
E52/4257
E52/4258
E52/4293
E52/4296
E52/5308
Yerilgee
Illaara
Illaara
Illaara
Illaara
Illaara
Illaara
Illaara
Illaara
Illaara
Illaara
Illaara
Illaara
Yerilgee
Yerilgee
Yerilgee
Illaara
Illaara
Illaara
Illaara
Yerilgee
Elvire
Evanston
Evanston
Evanston
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Bresnahan
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn, WA
Yilgarn
Share your feedback
Discover