HIGHLIGHTS
• Five composite samples representing various grades from Metzke’s Find were submitted to confirm
recoveries from conventional gravity and carbon in leach (“CIL”) circuits. Results across four grind sizes
are exceptional with:
o Combined gravity and CIL recoveries averaging 98.9%; and
o High gravity recovery averaging 78.5% and up to 91.0%
• Test work confirms that mineralisation at Metzke’s Find is free milling (non-refractory) and amendable to
conventional extraction methods including strong gravity recovery.
• These results will provide further positive input into a study for Metzke’s Find. The already high-grade 2023
Resource (14,900 oz @ 6.8 g/t Au) will be updated and upgraded in July 2026 following drilling results.
Dreadnought Resources Limited (“Dreadnought”) is pleased to announce metallurgical
test results from Metzke’s Find, part of the 100% owned Illaara Gold Project, located in
the Yilgarn region of Western Australia.
Dreadnought’s Managing Director,
Dean Tuck, commented: “These
exceptional metallurgical results
highlight the quality of the coarse-
grained free-gold mineralisation at
Metzke’s Find and strongly support
our strategy to transform into a self-
funded explorer through the
development of both Star of
Mangaroon and Metzke’s Find, that
can be commercialised.
These results will be included in the
updated Resource in July 2026, which
will be followed by completion of a
study”.
Figure 1: Image of coarse free gold
from MZDD001: 76.8-77.0m which
assayed 40 g/t Au. Field of view
within hand lens ~2.5cm.
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 2
Metallurgical Test Work – Metzke’s Find
The metallurgical program assessed conventional gravity and CIL recovery at a range of grind sizes (212µm, 150µm, 106µm, 75µm).
The results confirm exceptional recoveries using conventional gravity and CIL processing.
Key results after 48 hours were:
• Combined gravity and leach recovery averaged 98.9% across all grind sizes and 99.5% at 75μm grind size.
• Gravity gold recovery averaged 78.5% at 212 μm grind size.
• Rapid leach kinetics with extraction largely completed within 8 hours.
The test-work was carried out on five composite samples which were selected to represent a range of head grades and locations
within the planned updated and upgraded Resource (Table 1 and Figure 2). The tests were conducted using Perth tap water and
completed by independent metallurgical consultants, Strategic Metallurgy.
Additional metallurgical and geotechnical test work is planned following the updated and upgraded Resource.
Table 1: Summary table of the gold recovery test work.
Composite
ID
Grind
Size
(μm)
Drill Hole
Composite
Grade (g/t)
Average
Head Assay
(g/t)
Gravity
Gold
Recovery
(%)
Total
Extraction
(%)
Reagent
Consumption
Metallurgical
Head Assay
(g/t)
Cyanide
(kg/t)
Lime
(kg/t)
S1
212
5.0 4.4 65.1
96.1 0.155 0.562 3.35
150 97.6 0.160 0.567 3.35
106 98.4 0.155 0.575 3.79
75 99.2 0.159 0.537 6.51
S2
212
17.0 16.0 83.7
98.9 0.238 0.802 15.46
150 98.9 0.234 0.876 15.82
106 99.2 0.229 0.880 15.88
75 99.3 0.231 0.876 16.23
S3
212
17.5 12.9 69.5
99.1 0.228 0.591 8.95
150 99.6 0.227 0.762 9.26
106 99.7 0.233 0.759 8.94
75 99.9 0.234 0.631 8.85
S4
212
1.3 1.5 91.0
98.6 0.165 1.861 5.12
150 99.4 0.158 2.253 5.07
106 99.2 0.154 2.111 5.15
75 99.8 0.162 2.211 5.18
S5
212
7.7 3.3 83.1
98.9 0.443 5.980 3.75
150 98.2 0.232 5.979 3.92
106 98.9 0.221 5.944 3.76
75 99.2 0.220 5.831 3.85
Average 9.7 7.6 78.5 98.9 0.212 2.029 7.61
Gravity Recovery
Gravity tests simulated the gravity recovery stage of a conventional milling circuit. Samples were ground using a rod mill and the
resultant feed was upgraded using a Falcon concentrator. Results showed high gravity recoveries as shown in Table 1 above.
Gravity recoveries range from 65–91% with an average gravity recovery of 78.5% using a coarse grind size of 212µm. Recovery
was highest with sample S4 which was selected as a low-grade composite based on the drill hole assays (MZRC078 2m @ 1.3g/t
Au from 39m). The calculated grade of the sample from the metallurgical test-work was 5.1g/t highlighting the coarse-grained free
gold nature (nuggety) of the mineralisation. However, all gravity recovery results are well above industry averages and reflect the
high-grade and coarse nature of the gold throughout the deposit.
CIL Recovery
CIL tests were carried out at four different grind sizes using the gravity tails to characterise the performance at different grind
sizes. Samples were milled and then transferred to a bottle where reagents were added to achieve a pH of 10. The favourable leach
extraction and associated reagent consumption results are also shown in table 1 above.
Results from all samples show exceptional overall recoveries with moderate reagent consumption in line with typical gold deposits.
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 3
Background on Metzke’s Find
Metzke’s Find was discovered by a prospecting party in 1911. The remote location, being 160km from the nearest railhead,
and lack of readily available fresh water limited follow-up work. Metzke’s Find was worked on a few occasions over the
following decades for a recorded production of ~890 oz @ ~40 g/t Au. Metzke’s Find comprises ~20 small, historic shafts
over ~700m of strike.
The only significant exploration at Metzke’s Find was in the late 1980s and early 1990s by junior gold explorers who drilled
shallow percussion holes (average ~24m) which recorded a number of attractive results, including:
MZ07: 5m @ 4.0 g/t Au from 11m MZ25: 1m @ 18.0 g/t Au from 22m
MZ19: 2m @ 15.7 g/t Au from 19m MZ23: 3m @ 11.7 g/t Au from 18m
Dreadnought acquired Metke’s Find in 2020 and has completed RC and diamond drilling, which also delivered significant
results including:
MZRC022: 4m @ 10.5 g/t Au from 19m MZRC017: 7m @ 7.5 g/t Au from 51m
MZRC019: 4m @ 19.9 g/t Au from 45m MZRC016: 3m @ 21.0 g/t Au from 85m
Mineralisation at Metzke’s Find is hosted within a series of stacked, moderately dipping quartz lodes up to 4m thick that
occasionally overlap within a mafic sequence with sulphidic interflow sediments.
The main deposit scale structural control is a north-south trending shear zone that consists of a series of steep (70–90˚)
southwest dipping shear planes and parallel quartz veins with dominate sinistral reverse movement and moderate to steep
(55–70˚) west dipping schistosity. The intersection between shear planes and shear schistosity controls an apparent north
shoot plunge.
In 2023, a Resource (72% Indicated) was declared with the majority of mineralisation being contained within 140m of surface.
The current Resource is shown below. Metzke’s Find remains open along strike and at depth.
Figure 2: Long Section through Metzke’s Find showing the location of metallurgical samples in relation to the Resource block model and
recently completed drilling (crosses).
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 4
Background on Illaara
Illaara is a consolidated landholding covering ~800km2 and ~70km strike of a greenstone belt located ~190km from Kalgoorlie.
Illaara is one of the most underexplored greenstone belts in the Yilgarn Craton and is situated near mills at Davyhurst
(OBM.ASX) and Bottle Creek (Aurenne).
Historically gold was worked at Metzke’s Find and the nearby Lawrence’s Find in the early 1900s. However, the remoteness,
lack of water and access hindered early prospecting.
Recent exploration within Illaara was spurred on by a ~55km long Au-As-Sb anomaly generated from regional regolith
sampling by the Geological Survey
of Western Australia which led to
Newmont acquiring Illaara in
2016. Prior to Newmont, iron
ore companies held the project as
part of the Koolyanobbing Iron
Ore Operation. Given the long
history of iron ore mining in the
region, Illaara is well situated in
relation to existing road and rail
infrastructure.
Dreadnought acquired Illaara
from Newmont in 2019 and has
consolidated the rest of the
greenstone belt through a series
of acquisitions. Early drilling by
Dreadnought focused on the
historical workings at Metzke’s
Find resulting in a high-grade
Resource (14,900 oz @ 6.8 g/t
Au) that remains open along
strike and at depth. Given the lack
of systematic exploration, Illaara
presents a strong opportunity to
make a major gold discovery
within the world-renowned
Yilgarn Craton.
Figure 3: Map showing the location of
Illaara relative to other gold
operations and major players in the
region.
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 5
Dreadnought’s work plan summary
June 2026 Quarter Sept 2026 Quarter Dec 2026 Quarter
Star of Mangaroon
Mine
Approvals and commencement of mining, production and processing
through Paulsens Gold Operations (BC8 JV)
Mangaroon Discovery
Drilling
RC drilling of defined targets at Bordah (Steve’s Find), High Range North,
High Range South, Minga Bar camp scale targets
Mangaroon
Exploration
Target definition work (soils and gradient array IP) at Bordah, High
Range North, High Range South, Minga Bar camp scale targets
Metzke’s Find Studies
and Approvals
Technical and Environmental
Studies
Resource update and Scoping Study
Mining Proposal and Closure Plan submission
Metzke’s Find
Drilling
Metzke’s Find Resource and study related RC and diamond drilling
Illaara Exploration
and Discovery
Phase 1 air core drilling Phase 2 air core drilling
Phase 3 air core drilling / RC drilling
(pending results)
Gifford Creek Mineralogical and Metallurgical test-work
Upcoming News
• May to June: Results from RC drilling at Metzke’s Find – Illaara Gold
• May to August: Results from air core drilling – Illaara Gold
• May: Commencement of target definition work – Mangaroon Gold
• May: Upgrade JORC Exploration Target, Stinger – Gifford Creek
• May to June: Final mineralogy results – Gifford Creek
• June / July Commencement of metallurgical test work – Gifford Creek
• June / July: Results of target definition work – Mangaroon Gold
• June / July: Results of target generation work – Mangaroon South
• July / August: Updated Metzke’s Find Resource – Illaara Gold
For further information please refer to previous ASX announcements:
• 24 June 2019 75km Long Illaara Greenstone Belt Acquired from Newmont
• 6 December 2019 Consolidation of 75km Long Illaara Greenstone Belt
• 19 March 2020 RC Drilling Hits High Grades at Metzke’s Find
• 13 July 2020 RC Drilling Hits High Grade Gold at Metzke’s Find
• 25 September 2020 Further High-Grade Gold from Metzke’s Find
• 27 April 2021 Illaara Update and Regional Target Generation
• 1 November 2022 Successful Drill Results Across Multiple Metals
• 27 April 2023 Initial High-Grade Gold Resource at Metzke’s Find
• 3 February 2026 High-Grade Infill & Extensional Drilling – Illaara Gold
~Ends~
For further information please contact:
Dean Tuck Jessamyn Lyons
Managing Director Company Secretary
Dreadnought Resources Limited Dreadnought Resources Limited
E: dtuck@dreres.com.au E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 6
Snapshot – Illaara Gold (100%)
Illaara Gold is Large Scale and Underexplored
• Illaara covers over 70 strike km and ~800km2 of the Illaara Greenstone Belt within the richly endowed
Yilgarn Craton of Western Australia.
• The Illaara Greenstone Belt is one of the most under explored and under drilled greenstone belts in the
Yilgarn, providing plenty of space for a major discovery.
• Covering ~800km2, it’s a significant consolidated landholding within a tightly held and highly prospective gold
province.
Consolidation Provides for First Ever Modern Exploration
• All historical workings and known gold occurrences relate to outcropping mineralisation. There has been
minimal historical and modern exploration due to remoteness and iron ore exploration.
• 2026 will see the first ever systematic air core drilling program undertaken across the belt, a drilling program
that previous owners Newmont wanted to undertake prior to Dreadnought acquiring the project in 2019
and consolidating the remainder of the belt.
Significant, Step-change, Growth Potential
• Illaara contains multiple highly prospective structural corridors with known gold anomalism providing near
term drilling targets and discovery potential.
• Dreadnought is deploying modern geochemical and geophysical techniques to explore for mineralisation
under shallow cover.
Shallow, High-grade Gold at Metzke’s Find
• The Resource at Metzke’s contains shallow, high-grade gold which provides a strong foundation for the
project.
• Mineralisation at Metzke’s Find remains open along strike and at depth.
Metzke’s Find – Indicated and Inferred Resources (ASX 27 April 2023)
Table 2: Resource (0.5g/t Au cutoff grade) - Numbers may not add up due to rounding
Type
Indicated Inferred Total
Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz)
Transition 800 1.1 30 1,100 17.4 600 1,900 10.3 600
Fresh 44,600 7.4 10,600 21,800 5.2 3,600 66,500 6.7 14,300
Total 45,00 7.3 10,700 22,900 5.8 4,200 68,400 6.8 14,900
Self-Funded Explorer Strategy – Pathway to Production
• Dreadnought’s strategy is to transform into a self-funded explorer. This includes a high-grade open pit at the
Metzke’s Find where funding, development, haulage & processing are outsourced to third parties. This is a
common model in WA given the robust gold price. In this way, there is reduced reliance on market funding
and internal cashflows are aimed at making life-changing discoveries.
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 7
Mangaroon Project
Mangaroon covers ~5,000km2
and is located 250km south-east of
Exmouth in the Gascoyne Region of WA. Since 2020, Dreadnought has
identified three major focus areas within the Mangaroon Project:
Mangaroon Gold (100%)
Outcropping gold mineralisation was first identified and mined at
Mangaroon by local pastoralists and prospectors in the 1960s and has
seen no modern gold exploration. Dreadnought has consolidated this
gold field and is undertaking the first modern exploration across the
region which has identified five camp scale gold opportunities at
Bordah, High Range, Alma, Minga Bar and Star of Mangaroon.
In addition, the project contains granted mining leases that provide an
opportunity for cashflow including the Star of Mangaroon Mine where
Dreadnought has delivered a 27,000 oz Resource at 11.1 g/t Au (98%
Measured and Indicated)
Gifford Creek Critical Metals (100%)
Dreadnought discovered the Yin Ironstones and the Gifford Creek
Carbonatite in 2021. Since then, the Gifford Creek Carbonatite
Complex has emerged as a globally significant, rapidly growing,
potential source of critical minerals. Highlights include:
• Discovery of the Yin REE Ironstone Complex and delivery of a
30.0Mt @ 1.04% TREO Resource over only ~4.6km – including a
Measured and Indicated Resource of 26.3Mt @ 1.04% TREO (ASX
30 Nov 2023).
• Discovery of the globally significant, Nb-REE-P-Ti-Sc enriched
Gifford Creek Carbonatite (ASX 7 Aug 2023).
• Delivery of a large, independent initial Resource of 10.8Mt @ 1.00% TREO at the Gifford Creek Carbonatites, containing a range
of critical minerals including rare earths, niobium, phosphate, titanium and scandium (ASX 28 Aug 2023).
• Discovery of Stinger Nb-REE-P-Ti-Sc-Zr bearing carbonatite and delivery of the Stinger Niobium Exploration Target (ASX 3 Mar
2025, 29 Sept 2025).
Money Intrusion Ni-Cu-PGEs (Teck Earn-In)
The Money Intrusion is a ~45km long mafic intrusion prospective for Ni-Cu-PGE massive sulphides. In 2023, Dreadnought discovered
high tenor nickel-copper massive sulphides confirming the potential of this new system. Dreadnought entered in to a $15M Farm-In
and Joint Venture agreement with Teck Resources, a leading Canadian resource company, to earn up to 75% of the Money Intrusion
tenements.
Illaara Gold Project (100%)
Illaara is located ~190km northwest of Kalgoorlie in the Yilgarn Craton. The project comprises ~800km2
covering ~70km of strike
along the Illaara greenstone belts. Illaara was acquired off Newmont in 2019 as an early stage exploration project prospective for
typical Archean mesothermal lode gold deposits. Dreadnought has delivered a 14,900 oz @ 6.8 g/t Au Resource at Metzke’s Find
(72% Indicated). Prior to consolidation by Dreadnought, Illaara was predominantly held by iron ore explorers and remains highly
prospective for iron ore amongst other commodities.
Kimberley Cu-Au-Sb Project (Tarraji 80% / Yampi 100%)
Tarraji-Yampi covers ~420km2
is located only 85km from Derby in the West Kimberley region of WA and was locked up as a
Defence Reserve since 1978. The project has outcropping mineralisation and historical workings which have seen no modern
exploration.
In 2021, Dreadnought discovered high grade Cu-Au massive sulphides at Orion with results to date indicating a large scale,
Proterozoic Cu-Au VMS system at Tarraji-Yampi, similar to DeGrussa and Monty in the Bryah Basin.
In addition, the project contains outcropping high-grade Cu-Ag-Sb-Bi Veins at Rough Triangle and Grant’s Find.
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 8
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forward-looking
information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results
and developments will almost certainly differ materially from those expressed or implied. There are a number of risks, both specific to Dreadnought, and
of a general nature which may affect the future operating and financial performance of Dreadnought, and the value of an investment in Dreadnought
including and not limited to title risk, renewal risk, economic conditions, stock market fluctuations, commodity demand and price movements, timing of
access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve estimations, native title
risks, cultural heritage risks, foreign currency fluctuations, and mining development, construction and commissioning risk.
Competent Person’s Statement – Mineral Resources
The information in this announcement that relates to the Star of Mangaroon Mineral Resource is based on information compiled by Mr. Shaun Searle, a
Competent Person who is a Member of the Australian Institute of Geoscientists. Mr. Searle is an employee of Ashmore Advisory Pty Ltd. Mr. Searle has
sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that is being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore
Reserves’. Mr. Searle consents to the inclusion in the announcement of the matters based on his information in the form and context that the information
appears in relation to Mineral Resource estimates.
Competent Person’s Statement – Exploration Results
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled by Mr. Dean Tuck,
who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the
announcement of the matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information included in the original market
announcements by Dreadnought Resources Limited referenced in this report and in the case of Mineral Resources, Production Targets, forecast financial
information and Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. To the extent disclosed above, the Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcements.
Competent Person’s Statement – Metallurgical Results
The information in this report that relates to metallurgy and the processing response is based on and fairly represents information compiled or reviewed
by Mr Nick Vines. Mr Vines is a full-time employee of Strategic Metallurgy Pty Ltd. Mr Vines has confirmed that he has read and understood the
requirements of the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Vines is a
Competent Person as defined by the JORC Code 2012 Edition, having more than five years' experience which is relevant to the processing method and
type of deposit under consideration and to the activity for which he is accepting responsibility. Mr Vines is a Member of the AusIMM and consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports, and that the
forma and context in which the Competent Person’s findings are presented have not been materially modified from the original reports.
Resources Summary
Star of Mangaroon – Indicated and Inferred Resources (ASX 27 November 2024)
Table 3: Resource (2 g/t Au cut off grade) - Numbers may not add up due to rounding. *Surface reported at a 0.5 g/t Au cut-off.
Type
Measured Indicated Inferred Total
Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz)
Surface* 8,300 1.0 300 8,300 1.0 300
Transition 6,300 24.9 5,100 3,300 6.5 700 9,600 18.6 5,800
Fresh 33,200 13.5 14,400 23,500 8.5 6,400 1,000 5.1 200 57,700 11.3 21,000
Total 39,500 15.3 19,400 26,800 8.2 7,100 9,300 1.4 400 75,600 11.1 27,000
Metzke’s Find – Indicated and Inferred Resources (ASX 27 April 2023)
Table 4: Resource (0.5 g/t Au cut off grade) - Numbers may not add up due to rounding
Type
Indicated Inferred Total
Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz) Tonnes Au (g/t) Au (Oz)
Transition 800 1.1 30 1,100 17.4 600 1,900 10.3 600
Fresh 44,600 7.4 10,600 21,800 5.2 3,600 66,500 6.7 14,300
Total 45,00 7.3 10,700 22,900 5.8 4,200 68,400 6.8 14,900
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 9
Table 5: Drill Collar Data (GDA94 MGAz50) and Significant Intercepts (>0.1g/t Au)
Hole ID
Met
Sample
Easting Northing RL Dip Azi EOH Type From To
Interval
(m)
Grade
(g/t Au)
Prospect
MZRC072 S2 214552 6757859 477 -56 96 162 RC 136 138 2 17.0
Metzke’s
Find
MZRC075 S1 214581 6757924 471 -56 90 84 RC 65 66 2 5.0
MZRC076 S3 214547 6757941 475 -56 80 138 RC 117 120 3 17.5
MZRC078 S4 214593 6758035 478 -56 95 66 RC 39 41 2 1.3
MZRC104 S5 214616 6758005 462 -56 90 30 RC 7 8 1 11.6
MZRC106 S5 214617 6757906 460 -55 92 30 RC 6 7 1 0.4
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling techniques • Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed information.
Reverse Circulation (RC) drilling was undertaken to produce
samples for assay.
RC Drilling
Two sampling techniques were utilised for the RC drilling, 1m
metre splits directly from the rig sampling system for each
metre and 3m composite sampling from spoil piles. Samples
submitted to the laboratory were determined by the site
geologist.
1m Splits
From every metre drilled a 2-3kg sample (split) was sub-
sampled into a calico bag via a Metzke cone splitter from each
metre of drilling.
3m Composites
All remaining spoil from the sampling system was collected in
buckets from the sampling system and neatly deposited in
rows adjacent to the rig. An aluminium scoop was used to
then sub-sample each spoil pile to create a 2-3kg 3m
composite sample in a calico bag.
A pXRF is used on site to help determine mineralised samples.
Mineralised intervals have the 1m split collected, while
unmineralised samples have 3m composites collected.
All samples are submitted to ALS Laboratories in Perth for
determination of gold by Photon assay from crushed sample
(ALS Method Au-PA01).
Select samples are also submitted for 48 multi-elements via 4
acid digestion with MS/ICP finish (ALS Code ME-MS61) to
assist with lithological interpretation.
QAQC samples consisting of duplicates, blanks and CRM’s
(OREAS Standards) are inserted through the program at a
rate of 1:50 samples.
Drilling techniques • Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
RC Drilling
Drilling was completed by Precision Exploration Drilling
(PXD) utilising a DRA 600 truck mounted drill rig with
additional air from an auxiliary compressor and booster. Bit
size was 5¾“.
Drill sample recovery • Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
RC Drilling
Drilling was undertaken using a ‘best practice’ approach to
achieve maximum sample recovery and quality through the
mineralised zones.
Best practice sampling procedure included: suitable usage of
dust suppression, suitable shroud, lifting off bottom between
each metre, cleaning of sampling equipment, ensuring a dry
sample and suitable supervision by the supervising geologist
to ensure good sample quality.
Logging • Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
• The total length and percentage of the relevant
RC Drilling
RC chips were logged under the supervision of a Senior
Geologist with sufficient experience in this geological terrane
and relevant styles of mineralisation using an industry standard
logging system which could eventually be utilised within a
Mineral Resource Estimation.
Lithology, mineralisation, alteration, veining, weathering and
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX:DRE Dreadnought Resources Ltd 10
Criteria JORC Code explanation Commentary
intersections logged. texture were all recorded digitally.
Chips were washed each metre and stored in chip trays for
preservation and future reference.
RC pulp material is also analysed on the rig by pXRF to assist
with logging and the identification of mineralisation.
RC logging is qualitative, quantitative or semi-quantitative in
nature.
Sub-sampling
techniques and sample
preparation
• If core, whether cut or sawn and whether quarter, half or
all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for