Four Strong Off-Hole Conductors Identified - Tarraji-Yampi
Released
Released
Announcement PDF
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
ASX ANNOUNCEMENT 18 July 2024
Four Strong Off-Hole Conductors Identified - Tarraji-Yampi (80%, 100%)
HIGHLIGHTS
•
A total of 6 diamond holes (1,524.8m) have been completed at Tarraji-Yampi to test 6 Cu-Au
volcanogenic massive sulphide (“VMS”) targets around the Orion deposit. All holes were followed
up by down hole EM (“DHEM”) to identify potential off-hole conductors.
•
All holes intersected variably mineralised pyrrhotite, pyrite, chalcopyrite +/- sphalerite and galena
horizons along prospective peperite contacts of Ruins Dolerite and Marboo Formation sediments.
•
Assays are expected in August 2024.
•
Preliminary interpretation of DHEM surveys has identified 4 off-hole conductors associated with
prospective horizons, including a 50,000S conductor spanning ~150m x 150m, located ~100m down
dip of a 3.2m thick gossan intersected in KMDD004 and interpreted to be the structural offset of
Orion. This new Orion Offset target and off hole conductors at OR1 and OR2 are priority targets
for follow up drilling, following assays and further review.
•
EIS co-funded IP has been partially completed and will recommence later in the year following
review of orientation results.
•
Niobium focused drilling at Mangaroon to commence this week.
Dreadnought Resources Limited (“Dreadnought”) is pleased to announce that drilling and
geophysical surveys have been completed at Tarraji-Yampi, located in the Kimberley Region
of Western Australia.
Dreadnought’s Managing Director, Dean Tuck, commented: “The six hole diamond drill program has intersected
mineralisation in every hole. Three of the six targets were effectively tested. In addition, three off-hole conductors have been
identified, all associated with prospective peperite margins including the strongest DHEM conductor to date of 50,000S believed
to be the structural offset of the main Orion lode. OR2 and OR1 also remain priority targets with off-hole conductors identified
down dip of mineralisation. Additionally, the EIS co-funded IP survey commenced with orientation lines completed over Grants
and Orion with three of the regional exploration lines completed. This survey will assist in determining if IP is an effective tool
to utilise for targeting Cu-Au mineralisation at Tarraji-Yampi.”
Figure 1: Photo of the Topdrill diamond rig at Orion Repeat.
dreadnoughtresources.com.au
1
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
SNAPSHOT – Tarraji-Yampi Cu-Au-Ag-Co
Unexplored since the 1970s
•
Outcropping mineralisation was discovered in 1905 and mined for copper at Grant’s Find, Wilson’s Reward,
Monarch, Ironclad and Tarraji from 1907-1920.
•
Only historical exploration within the area was by WMC Resources (“WMC”) in the 1950s and Australian
Consolidated Minerals (“ACM”) in the 1970s with both parties exploring for copper.
•
Contained entirely within the Yampi Sound Training Area (“YSTA”), Commonwealth land was off limits to mineral
exploration from 1978 to 2013.
Genuine Camp Scale Potential
•
Five clusters of historical mining on outcropping mineralisation.
•
Orion discovery (~350m wide x ~150m long x 250m deep and open at depth), under just 1m of cover, made in
2021. Results include KMRC022: 16m @ 2.2% Cu, 38.7g/t Ag, 6.6g/t Au, 0.40% Co from 77m. (ASX 15 Nov 2021)
•
Lithostructural and geochemical similarities to pelitic-mafic or “Besshi-style” VMS systems such as Monty
/DeGrussa in Western Australia, Windy Craggy in Canada or the Matchless deposits in Namibia.
Significant, Step-Change, Growth Potential
•
Dreadnought is the first to deploy modern geochemical and geophysical techniques to explore for mineralisation
under shallow cover in the region.
•
Multiple priority Orion look-alikes defined through geochemical and geophysical surveys with highly conductive
anomalism.
High-Grade, Multi-Metal Potential Including Cu-Ag-Au-Co
•
Previous drilling at Orion includes thick high-grade intersections (ASX 15 Nov 2021 and 8 Dec 2021):
KMRC017: 12m @ 1.6% Cu, 31.7g/t Ag,
0.5g/t Au, 0.02% Co from 45m
KMRC022: 16m @ 2.2% Cu, 38.7g/t Ag,
6.6g/t Au, 0.40% Co from 77m, including:
2m @
<0.1% Cu, 4.8 g/t Ag,
27.6g/t Au, 1.50% Co from 77m, and:
7m @
4.7% Cu, 83.3g/t Ag,
4.9g/t Au, 0.20% Co from 82m
KMRC039: 20m @ 1.4% Cu, 13.4g/t Ag,
3m @
7.6% Cu, 116.2g/t Ag, 2.2 g/t Au, 0.14% Co from 18m
KMRC047: 12m @ 3.0% Cu, 21.4g/t Ag,
5m @
0.5g/t Au, 0.03% Co from 3m, including:
1.7g/t Au, 0.02% Co from 1m, including:
5.9% Cu, 44.9 g/t Ag, 3.7g/t Au, 0.01% Co from 1m
Global Energy Decarbonisation Driving Copper Fundamentals
•
Copper is essential for electricity-related technologies with renewable energy systems requiring up to 12x more
copper compared to traditional energy systems.
•
S&P Global forecasts that global demand for copper could double from 25mt to 50mt by 2035. Under this
scenario, by 2030, supply from both existing and projected copper mines will meet just 80% of demand (S&P Global:
The Future of Copper, July 2022).
dreadnoughtresources.com.au
2
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Technical Discussion of Diamond Drilling
In the Phase 1 drill program (6 holes, 1,640m), 5 of the 6 targets are located along the same interpreted feeder structure as the
Orion deposit and are defined by highly conductive, magnetic anomalies associated with elevated pathfinder geochemistry. These
targets include the depth extension of Orion. The 6-hole Phase 1 drill program targets are discussed and summarised below with
further review and commentary once assays are received.
Orion Extension was defined by a large and strong magnetic anomaly at depth of the main Orion lode. KMDD002 was drilled to
test the centre of this magnetic anomaly and a hanging wall lode that was intersected in KMRD056 (1.35m @ 1.0% Cu). Drilling
intersected six variably mineralised peperite horizons with late stage stockwork of pyrrhotite, pyrite, chalcopyrite +/- sphalerite
and galena ranging from 1-10%. The magnetic anomaly is explained by thick pyrrhotite accumulations between 420m and 440m.
DHEM confirms that the target horizon was tested with a ~47,000S plate centred around 420m depth associated with more intense
~5-10% pyrrhotite, pyrite, chalcopyrite, sphalerite, galena and arsenopyrite; a similar assemblage to the Orion lode further up dip.
This target is considered effectively tested and awaiting assays for further review.
Orion Repeat was defined by a 3,500S
FLEM conductor and coincident VMS
pathfinder geochemistry that sits beneath
previous drilling at Orion. KMDD001 was
drilled through the main Orion lode and
into the centre of the FLEM plate
intersecting 2.8m of massive to semimassive sulphides at the Orion lode and
three additional mineralised horizons with
late stage stockwork of pyrrhotite, pyrite,
chalcopyrite +/- sphalerite, galena and
arsenopyrite ranging from 1-10%. DHEM
confirms that the target was tested with a
strong 13,000S on-hole response at ~170m
associated with more intense ~5-10%
pyrrhotite, pyrite, chalcopyrite, sphalerite
and galena.
This target is considered effectively tested
and awaiting assays for further review.
Orion Splay was defined by multiple
DHEM conductors up to 28,000S that have
an orientation sub-parallel to the
interpreted feeder structure that might also
be offsetting the main Orion deposit.
Adjacent drill holes are elevated in VMS
pathfinder geochemistry. KMDD003 was
drilled to test multiple DHEM plates and
intersected four mineralised horizons with
late stage stockwork of pyrrhotite, pyrite,
chalcopyrite +/- sphalerite ranging from 110%.
DHEM confirms that all plates were
effectively tested and awaiting assays for
further review.
Figure 2: Plan view image showing the
location of previously drilled (black
dots) and recently drilled holes (blue
dots) at Orion in relation to prospects,
geochemical contours, and
FLEM/DHEM plates.
dreadnoughtresources.com.au
3
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Orion Offset was defined by a 3,800S FLEM conductor with coincident
VMS pathfinder geochemistry. KMDD004 was drilled into the centre of
the modelled FLEM plate and intersected a 3.2m wide copper-stained
mineralised gossan from 13.6m depth, shallower than the target
conductor. A second mineralised horizon with late stage stockwork of
pyrrhotite, pyrite, chalcopyrite +/- sphalerite and galena ranging from 15% was intersected around target depth from 93-110m. DHEM confirms
that the target is not fully explained with two off-hole conductors
identified. The first is the strongest conductor identified to date, at 50,000S
consistent with a massive sulphide source, is located ~100m down dip of
the gossanous intercept and is interpreted to be the offset of the main
Orion lode. The second is a 15,000S conductor that may be associated
with black shales which requires further review.
This new Orion Offset target is ~150m x 150m in size and remains a
priority target for follow up drilling.
Figure 3: Photo of secondary copper
carbonates in the gossanous horizons
from ~14m depth in KMDD004 which is
located ~100m up dip of the 50,000S offhole conductor.
OR2 is a 7,200S off hole conductor located beneath the strongest Cu
auger geochemical anomaly (stronger than Orion) with VMS pathfinder
geochemistry. KMRC062, which is the hole from where the DHEM
conductor originated, contained elevated Ag-Bi-Mo-Sb-Se at the
prospective peperite contact. KMDD005 was drilled into the centre of the
modelled DHEM plate intersecting a ~6.2m wide zone of late stage quartz
veins with chalcopyrite +/- pyrrhotite and pyrite, possibly representing a
footwall stockwork zone of mineralisation or Grant’s style Cu-Au
mineralisation. DHEM confirms that the target plate was tested at the
target depth and partially explained. There is a strong 14,500S off-hole
conductor, consistent with a massive sulphide source, located further
down dip and between KMDD005 and KMRC062 on the same prospective
mineralised horizon.
This OR2 DHEM target is ~335m x 350m in size and remains a priority
target for follow up drilling. Additionally, the Grant’s style Cu-Au
mineralisation warrants additional target definition work.
Figure 4: Photo of Grant’s style Cu-Au
veining from ~30m down hole in
KMDD005 showing chalcopyrite as the
primary sulphide.
OR1 is the only target drilled off the interpreted Orion feeder structure, targeting a strong “edge hit” 16,700S DHEM conductor
defined from KMRC060 (2m @ 0.4% Pb and 16.6g/t Ag from 106m) along a prospective peperite contact coincident with the
DHEM conductor. KMDD006 was drilled into the centre of the modelled DHEM plate intersecting two mineralised horizons with
pyrrhotite, pyrite, chalcopyrite +/- sphalerite ranging from 1-5%. DHEM confirms that the target is not fully explained. An off-hole
conductor of 24,300S, consistent with a massive sulphide source, was identified which sits further down dip of the mineralised
horizons intersected in KMRC060 and KMDD006.
This OR1 target is ~82m x 200m in size and remains a priority target for follow up drilling.
dreadnoughtresources.com.au
4
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Table 1: Significant Sulphide Intervals (Visual Estimates) with DHEM and Target Status
To
Interval
Mineralisation
Sulphide
Sulphide
Hole ID
DHEM
Status
Prospect
(m)
(m)
Style
Type
(%)
Semi Massive Plate Hit
58.2
61
2.8
Po, Ccp, Sp, Py
80-100
Orion Lode
Massive
10,000S
Po, Py, Ccp, Sp,
No
113.95 118.85
4.9
Veining / Laminated
1-5
Assays Pending
Gn
Conductor
KMDD001
Orion Repeat
Veining / Laminated /
157
170.05
13.05
Po, Py, Ccp, Sp
1-5
Disseminated
Plate Hit
Target Tested
13,000S
Assays Pending
Veining / Laminated / Po, Py, Ccp, Sp,
170.05 177.55
7.5
5-10
Disseminated
Gn, Apy
Plate Hit
Target Tested
334.05
341
6.95
Veining / Laminated
Po, Py, Ccp
1-5
4,500S
Assays Pending
Plate Hit
Target Tested
377.9
392.6
14.7
Veining / Laminated Po, Py, Ccp, Gn
1-5
38,400S
Assays Pending
Po, Py, Ccp, Sp,
KMDD002 420.75 433.1
12.35
Veining / Laminated
1-5
Orion Extension
Gn
Plate Hit
Target Tested
47,000S
Assays Pending
Po, Py, Ccp, Sp,
433.1
440.6
7.5
Veining / Laminated
5-10
Gn
Veining / Laminated /
No
471.2
493
21.8
Po, Py, Ccp, Sp
1-5
Assays Pending
Disseminated
Conductor
No
80.2
88.8
8.6
Veining/Laminated
Po, Py, Ccp, Sp
1-5
Assays Pending
Conductor
Plate Hit
Target Tested
88.8
99.05
10.25
Veining/Laminated
Po, Py, Ccp, Sp
5-10
4,150S
Assays Pending
KMDD003
Orion Splay
Plate Hit
Target Tested
133.2 142.41
9.21
Veining/Laminated
Po, Py, Ccp, Sp
1-5
9,000S
Assays Pending
Plate Hit
Target Tested
184.5
207.2
22.7
Veining/Laminated
Po, Py, Ccp
1-5
8,000S
Assays Pending
MalachiteOff hole
13.6
16.8
3.2
Gossan
1-5
Priority
stained gossan.
Conductor
Target
Off-hole Conductor of 50,000S, consistent with a massive sulphide source, located ~100m down
Assays Pending
dip and is interpreted to be the offset of the main Orion lode.
KMDD004
Orion Offset
Veining / Laminated /
Plate Hit Target Partially
93
109.58
16.58
Po, Py, Ccp
1-5
Disseminated
1,250S
Explained
Possible New
Off-hole Conductor of 15,000S, possibly associated with black shales, requires geological review.
Target
Plate Hit
Target Tested
132.25 138.42
6.17
Veining / Laminated Po, Ccp, Sp, Py
1-5
5,800S
Assays Pending
KMDD005
OR2
Off-hole Conductor of 14,500S, consistent with a massive sulphide source identified down dip of
New Target
prospective mineralised horizon intersected in KMDD005 and KMRC062.
No
28
32
4
Veining
Ccp, Py, Po
1-5
N/A
Conductor
Veining / Laminated /
Plate Hit Target Partially
KMDD006 124.87 144.91
20.04
Po, Ccp, Sp, Py
1-5
OR1
Disseminated
4,100S
Explained
Off-hole Conductor of 24,300S, consistent with a massive sulphide source identified down dip of
New Target
prospective mineralised horizon intersected in KMDD006 and KMRC060.
*Sulphide Type: Po-Pyrrhotite, Py-Pyrite, Ccp-Chalcopyrite, Sp-Sphalerite, Gn-Galena, Apy-Arsenopyrite
From
(m)
dreadnoughtresources.com.au
5
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Target Summary
Phase 1 of the 2024 drilling program at Tarraji-Yampi tested and DHEM surveyed 6 priority targets. Targeting was prioritised based
on a ranking system summarised in Table 2 below.
Additional field activities were undertaken including EIS co-funded IP survey and mapping of other advanced and early-stage targets
to determine next steps.
A summary of currently defined Cu-Au VMS targets and their status is below. The summary does not include Cu-Au epithermal
targets which will be ranked following the EIS co-funded IP survey which was partially completed as part of this program with
results expected in August 2024.
Table 2: Description of the current Cu-Au VMS target and camps (GDA94 MGA z51).
Target
Planned
Plate
Planned
Auger
Conductance Magnetic Down hole
Depth
Dimension
Target Status
Hole
Geochemistry
(S)
Anomaly Geochemistry
(m)
(m)
Orion
Extension
Yes
620
-
-
-
Yes
-
Drilled
Orion Repeat
Yes
260
Ag-As-Bi-MoPb-Sb-Se-Zn
200 x 190
3,500
Yes
-
Drilled
Orion Splay
Yes
245
Ag-As-Bi-MoPb-Sb-Se-Zn
90 x 45
90 x 110
600 x 390
28,000
14,300
2,500
No
Orion Offset
Yes
155
Ag-As-Bi-Cd-MoPb-Sb-Se-Zn
200 x 190
3,800
Yes
OR2
Yes
160
Ag-As-Bi-Cd-CuIn-Pb-Sb-Se-Zn
105 x 45
7,200
Yes
OR1
Yes
200
As-Bi-Pb-SbSe-Te
70 x 200
16,700
No
Ironclad
TBD
-
OR3
TBD
255
OR4
TBD
250
Ag-As-Bi-Cd-In-MoPb-Se-Sn-Te-Zn
OR5
TBD
-
As-Au-Bi-Cu-Se
Te-Zn
OR7
TBD
210
Ag-As-Bi-Cd-Mo-PbSe
TH1
TBD
215
TH2
TBD
290
Rufina
TBD
230
Lambrusco
Neptune Camp
Mangrove Camp
TBD
TBD
TBD
330
-
Ag-As-Au-Bi-Cu
Se-Te-Zn
Ag-As-Bi-Cd-Mo-PbSb-Se-Te-Zn
Not Surveyed
735 x 130
640 x 285
65 x 80
55 x 60
55 x 60
6,100
8,800
5,100
9,500
9,500
Not Surveyed
No
Yes
Drilled:
Off-hole
Conductors
Drilled:
Off-hole
Conductors
Drilled:
Off-hole
Conductors
Ag-Bi-MoSb-Se
Ag-Bi-Cd-CuMo-Pb-Sb-SeTe-Zn
Ag-Bi-Cd-Cu-MoPb-Sb-Se-Te-Zn
Ag-Bi-Cd-Cu-Mo
Pb-Sb-Se-Te-W-Zn
Requires EM/IP
Under review
Ag-Bi-Cd-Cu-Mo
Pb-Sb-Se-Te-Zn
Yes
Ag-Bi-Cd-Cu-Mo- Requires magnetic
Pb-Sb-Se-Te-Zn
modelling
Yes
Ag-As-Au-Ba-CdCu-In-Mo-Sb-Zn
3,200
8,600
5,200
2,000
160 x 260
4,800
Yes
-
250 x 210
2,400
No
-
220 x 430
1,400 (EOH)
Not Surveyed
Not Surveyed
dreadnoughtresources.com.au
Drilled
Yes
310 x 230
305 x 465
430 x 270
200 x 530
As-Bi-Mo-Se-Te
Ag-As-Bi-Cd-Mo-PbSb-Se-Te-Zn
Ag-As-Au-BiCo-Cu-Mo-PbSb-Se-Te-W-Zn
Ag-As-Au-BiCo-Cu-Mo-PbSb-Se-Te-W-Zn
No
No
-
Under review
Under review
Ag-Bi-Cd-Cu-MoPb-Sb-Se-Te-Zn
Ag-As-Bi-Cd-CuIn-Mo-Pb-Sb-SeTe-Zn
-
Under review
Under review
Under review
Under review
Early stage
Early stage
6
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Background on Tarraji-Yampi (E04/2508, E04/2557, E04/2608, E04/2860, E04/2861, E04/2862, E04/2863: 100%, E04/2315: 80%)
Tarraji-Yampi is located entirely within the Yampi Sound Training Area (“YSTA”), a Commonwealth Defence
Reserve in the West Kimberley, ~80kms from the port of Derby. The YSTA is the second largest Defence Reserve
in Australia after Woomera in South Australia and was off limits to mineral exploration from 1978 to 2013.
The only significant exploration undertaken in the area was by WMC Resources in 1958 and Australian Consolidated
Minerals in 1972, with both parties exploring for copper. Since opening for exploration in 2013, Dreadnought has
secured the largest ground holding within the YSTA and developed strong working relationships with both the
Department of Defence and the Dambimangari People.
Figure 5: Plan view image showing the location of Cu-Au and VMS prospects over geological interpretation at Tarraji-Yampi.
dreadnoughtresources.com.au
7
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
For further information please refer to previous ASX announcements:
•
25 August 2021
RC Results from Orion, Grant’s & Fuso Indicate a large Cu-Au-Ag-Co System
•
11 October 2021
Massive Sulphides Intersected in Multiple Holes at Orion Cu-Au-Ag-Co
•
2 November 2021
Supergene Confirmed and Massive Sulphides Extended at Orion
•
15 November 2021
High-Grade Cu-Ag-Au-Co Discovery at Orion
•
8 December 2021
Further High-Grade Cu-Ag-Au-Co from Orion Discovery
•
22 June 2022
Orion Auger Program – Tarraji-Yampi Project
•
15 August 2022
Nine Orion Look-alikes from Auger Program, More to Come
•
3 October 2022
Commencement of Regional Auger Program
•
18 May 2023
Additional Orion Look-Alikes from Auger Program
•
24 October 2023
Drilling and Geophysical Surveys Completed at Tarraji-Yampi
•
27 March 2024
Drilling and Geophysical Results from Tarraji-Yampi
•
17 June 2024
Cu-Au Drilling Commenced at Tarraji-Yampi
UPCOMING NEWSFLOW
July: Commencement of RC drilling at Gifford Creek Carbonatite Nb-REE (Mangaroon 100%)
July: Moving Loop EM survey at Tiger Cu-Au, Zn-Ag (Mangaroon 100%)
July: June 2024 Quarterly Activities and Cashflow Reports
July/August: Commencement of EIS co-funded RC drilling at Tiger Cu-Au-Zn-Ag (Mangaroon 100%)
August: Commencement of RC drilling at Mangaroon Au (100%)
August: Results from drilling at Tarraji-Yampi (80/100%)
August: Results of further target generation and definition work at Mangaroon Au (100%)
August: Results from Nb-REE at the Gifford Creek Carbonatite (Mangaroon 100%)
August/September: Results from EIS co-funded IP surveys at Tarraji-Yampi (80%/100%)
August/September: Results from Au and Cu-Au-Zn-Ag drilling at Mangaroon (100%)
~Ends~
For further information please contact:
Dean Tuck
Managing Director
Dreadnought Resources Limited
E: dtuck@dreres.com.au
Jessamyn Lyons
Company Secretary
Dreadnought Resources Limited
E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
dreadnoughtresources.com.au
8
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and
forward-looking information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown
risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. There
are a number of risks, both specific to Dreadnought, and of a general nature which may affect the future operating and financial
performance of Dreadnought, and the value of an investment in Dreadnought including and not limited to title risk, renewal risk,
economic conditions, stock market fluctuations, commodity demand and price movements, timing of access to infrastructure, timing of
environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve estimations, native title risks, cultural
heritage risks, foreign currency fluctuations, and mining development, construction and commissioning risk.
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where
concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information
regarding impurities or deleterious physical properties relevant to valuations.
Competent Person’s Statement – Exploration Results
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled
by Mr. Dean Tuck, who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken
to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the announcement of the matters based on the information in the
form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports,
and that the forma and context in which the Competent Person’s findings are presented have not been materially modified from the
original reports.
Figure 6: Photo of consultant Gerard Tripp inspecting diamond core with Dreadnought’s Claud Tomkins (Left) and
inspecting Grant’s Cu-Au lode with Matt Crowe.
dreadnoughtresources.com.au
9
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
INVESTMENT HIGHLIGHTS
Kimberley Ni-Cu-Au Project (80/100%)
The project is located only 85kms from Derby in the
West Kimberley region of WA and was locked up as a
Defence Reserve since 1978.
The project has outcropping mineralisation and historic
workings which have seen no modern exploration.
Results to date indicate that there may be a related, large
scale, Proterozoic Cu-Au VMS system at Tarraji-Yampi,
similar to DeGrussa and Monty in the Bryah Basin.
Mangaroon Ni-Cu-Co-3PGE, Au & REE Project
(100%)
Mangaroon covers ~5,000kms2 and is located 250kms
south-east of Exmouth in the Gascoyne Region of WA.
At the Money Intrusion, Ni-Cu-Co-3PGE has been
identified. Dreadnought also has areas of outcropping
high-grade gold including the historic Star of Mangaroon
and Diamond gold mines. In addition, Mangaroon has
emerged as a globally significant, rapidly growing,
potential source of critical minerals. Highlights include:
•
An Exploration Target estimated for the top 150m
of ~40km of the Yin REE Ironstone Complex (ASX
13 Feb 2023).
•
An independent Resource for Yin Ironstones
Complex of 29.98Mt @ 1.04% TREO over only
~4.6kms – including a Measured and Indicated Resource of 26.3Mt @ 1.04% TREO (ASX 30 Nov 2023).
•
Regional source of rare earths at the Gifford Creek Carbonatite totaling ~17kms x ~1km (ASX 7 Aug 2023).
•
A large, independent initial Resource of 10.84Mt @ 1.00% TREO at the Gifford Creek Carbonatites, containing
a range of critical minerals including rare earths, niobium, phosphate, titanium and scandium (ASX 28 Aug 2023).
Bresnahan HREE-Au-U Project (100%)
Bresnahan is located ~125km southwest of Newman in the Ashburton Basin. The project comprises ~3,700kms2
covering over 200kms strike along the Bresnahan Basin / Wyloo Group unconformity. Bresnahan is prospective for
unconformity related heavy rare earth (“HREE”) deposits similar to Browns Range HREE deposits, unconformity
uranium (“U”) deposits and mesothermal lode gold similar to Paulsens Au-Ag-Sb deposits along strike.
Prior to consolidation by Dreadnought, the Bresnahan Basin had been successfully explored for unconformity
uranium with limited exploration for mesothermal gold. Bresnahan is a first mover opportunity to explore for
unconformity HREE.
Central Yilgarn Gold, Base Metals, Critical Minerals & Iron Ore Project (100%)
Central Yilgarn is located ~190km northwest of Kalgoorlie in the Yilgarn Craton. The project comprises ~1,400kms2
covering ~150km of strike along the majority of the Illaara, Yerilgee, South Elvire and Evanston greenstone belts.
Central Yilgarn is prospective for typical Archean mesothermal lode gold deposits, VMS base metals, komatiitehosted nickel sulphides and critical metals including Lithium-Cesium-Tantalum.
Prior to consolidation by Dreadnought, the Central Yilgarn was predominantly held by iron ore explorers and
remains highly prospective for iron ore.
dreadnoughtresources.com.au
10
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Table 3: Drill Collar Data (GDA94 MGAz50)
Hole ID
Easting
Northing
KMDD001
627943
8168679
KMDD002
628248
8168621
KMDD003
627958
8168558
KMDD004
627829
8168614
KMDD005
627698
8168790
KMDD006
627921
8169380
RL
66
66
64
65
68
70
Dip
-60
-66
-60
-65
-70
-61
Azimuth
292
292
270
292
280
302
EOH
219.5
552.2
251.1
150.3
171.8
179.9
Type
DD
DD
DD
DD
DD
DD
Prospect
Repeat
Extension
Splay
Offset
OR2
OR1
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling techniques
•
Diamond (DD) drilling was undertaken to produce samples
for assaying.
•
•
•
Drilling techniques
Drill sample recovery
•
•
•
•
Logging
•
•
•
Sub-sampling
techniques and sample
•
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter, half or
all core taken.
dreadnoughtresources.com.au
Core is orientated for structural and geotechnical logging
where possible. In orientated core, half core is submitted to
the lab for analysis in intervals ranging from 20cm to 1m
depending on the geological context. If core is orientated,
then the half core is cut so as to preserve the orientation
line with the same side of the core submitted down the hole.
QAQC samples consisting of duplicates, blanks and CRM’s
(OREAS Standards) will be inserted through the program at
a rate of 1:50 samples. Duplicate samples are submitted as
quarter core.
All samples are submitted to ALS Laboratories in Perth for
determination of 48 multi-elements via 4 acid digestion with
MS/ICP finish (ALS Code ME-MS61) determination of Au by
Fire Assay and ICP-AES finish (ALS Code Au-ICP22).
Diamond Drilling
Diamond drilling was undertaken by Top Drill with a truckmounted low impact Sandvik DE880 diamond drill rig.
Drilling is either HQ to end of hole or initially HQ and
dropping to NQ once the hole is cased off for deeper drill
holes.
Core is
Share your feedback
Discover