New World Metals Corporate Presentation
Released
Released
Announcement PDF
Finding the Metals
for Our Future
C O R P O R AT E P R E S E N TAT I O N
SEPTEMBER 2023
ASX:DRE
dreadnoughtresources.com.au
Disclaimer
Refer to Dreadnought announcements for JORC Table 1 and Table 2 for results and
information contained in this presentation.
Illaara Gold-VMS-Iron Ore Project
27 April 2021
Illaara Update and Regional Target Generation
31 May 2021
Drilling Results – Illaara Au-Cu-Iron Ore Project
7 July 2021
High-Grade Tantalum Results from Peggy Sue – Illaara Project
15 February 2022
Eight Conductors to be Drilled at Nelson and Trafalgar CuPb-Zn-Ag Prospects – Illaara Project
9 May 2022
Drilling Complete at Illaara Project
Kimberley Ni-Cu-Au Project
25 August 2021
RC Results from Orion, Grant’s Find & Fuso Indicate Large
Cu-u-Ag-Co System
27 August 2021
Bonanza Grade Cu-Ag-Sb-Bi Mineralisation at rough Triangle
15 November 2021
High-Grade Cu-Ag-Au-Co Discovery at Orion
8 December 2021
Further High-Grade Cu-Ag-Au-Co-Zn Orion Discovery
29 April 2022
EIS Drilling Grants for Mangaroon REE and Orion Cu-Ag-AuCo
22 June 2022
Orion Auger Program – Taraji-Yampi Project
20 June 2023
Highly Conductive Anomalies Enhance Orion Look-Alikes–
Taraji-Yampi Project
Mangaroon Ni-Cu-PGE, REE & Au Project
07 April 2021
Option/JV Agreement Signed with Global Base Metal Miner
29 November 2021
Five Carbonatite Intrusions Identified at Mangaroon Project
14 February 2022
Conductors Defined along the Money Intrusion – Mangaroon
FQM JV
29 April 2022
EIS Drilling Grants for Mangaroon REE and Orion Cu-Ag-AuCo
17 October 2022
Mineralised carbonatite discovered at C3 and C4
24 October 2022
Broad high-grade assays at Yin REE Discovery
10 November 2022
Exploration Update Mangaroon Ni-Cu-PGE
28 December 2022
Initial High-Grade, Independent Resource Over 3kms at Yin
27 January 2023
Mineralised REE Ironstones increased by 13kms to 43kms
13 February 2023
Rare Earth Ironstone Exploration Target Defined
3 April 2023
Carbonatites deliver thick near surface REE Results
29 May 2023
Metallurgical TestwOrk Supports High Grade Concentrate
6 June 2023
Mangaroon Gold Review and Further Consolidation
13 June 2023
Yin Extended by 1km & 2.5km of High Grade NdPr
Discoveries
5 July 2023
40% Increase in Resource Tonnage at Yin
28 August 2023
Initial, Independent REE-Nb-P-Ti-Sc Resource at C3
ASX:DRE
Bresnahan REE-Au Project
8 February 2023
Bresnahan Emerging As a Light & Heavy Rare Earth
Province
This presentation has been prepared by Dreadnought Resources Limited
(Dreadnought or the Company). It contains general information about the
Company’s activities current as at the date of the presentation. The information
is provided in summary form and does not purport to be complete. This
presentation is not to be distributed (nor taken to have been distributed) to any
persons in any jurisdictions to whom an offer or solicitation to buy shares in the
Company would be unlawful. Any recipient of the presentation should observe
any such restrictions on the distribution of this presentation and warrants to the
Company that the receipt of the presentation is not unlawful. It should not be
considered as an offer or invitation to subscribe for or purchase any securities in
the Company or as an inducement to make an offer or invitation with respect to
those securities. No agreement to subscribe for securities in the Company will
be entered into on the basis of this presentation or any information, opinions or
conclusions expressed in the course of this presentation. This presentation is not
a prospectus, product disclosure document or other offering document under
Australian law or under any other law. It has been prepared for information
purposes only. This presentation contains general summary information and does
not take into account the investment objectives, financial situation and particular
needs of any individual investor. It is not financial product advice and investors
should obtain their own independent advice from qualified financial advisors
having regard to their objectives, financial situation and needs. Dreadnought nor
any of their related bodies corporate is licensed to provide financial product
advice. This presentation and information, opinions or conclusions expressed in
the course of this presentation contains forecasts and forward-looking
information. Such forecasts, projections and information are not a guarantee of
future performance, involve unknown risks and uncertainties. Actual results and
developments will almost certainly differ materially from those expressed or
implied. There are a number of risks, both specific to Dreadnought, and of a
general nature which may affect the future operating and financial performance of
Dreadnought, and the value of an investment in Dreadnought including and not
limited to title risk, renewal risk, economic conditions, stock market fluctuations,
commodity demand and price movements, timing of access to infrastructure,
timing of environmental approvals, regulatory risks, operational risks, reliance on
key personnel, reserve estimations, native title risks, cultural heritage risks,
foreign currency fluctuations, and mining development, construction and
commissioning risk. You should not act or refrain from acting in reliance on this
presentation, or any information, opinions or conclusions expressed in the
course of this presentation. This presentation does not purport to be all inclusive
or to contain all information which its recipients may require in order to make an
informed assessment of the prospects of Dreadnought. You should conduct your
own investigation and perform your own analysis in order to satisfy yourself as to
the accuracy and completeness of the information, statements and opinions
contained in this presentation before making any investment decision. Recipients
of this presentation must undertake their own due diligence and make their own
assumptions in respect of the information contained in this presentation and
should obtain independent professional advice before making any decision based
on the information. No representation or warranty, express or implied, is made
in relation to the fairness, accuracy or completeness of the information, opinions
and conclusions expressed in the course of this presentation. To the maximum
extent permitted by law, no representation, warranty or undertaking, express or
implied, is made and, to the maximum extent permitted by law, no responsibility
or liability is accepted by the Company or any of its officers, employees, agents
or consultants or any other person as to the adequacy, accuracy, completeness
or reasonableness of the information in this presentation. To the maximum
extent permitted by law, no responsibility for any errors or omissions from this
presentation whether arising out of negligence or otherwise is accepted. An
investment in the shares of the Company is to be considered highly speculative.
The exploration targets or conceptual exploration targets in this presentation or
expressed during the course of this presentation are subject to completion of the
necessary feasibility studies, permitting and execution of all necessary
infrastructure agreements. This presentation and information, opinions or
conclusions expressed in the course of this presentation should be read in
conjunction with Dreadnought's other periodic and continuous disclosure
announcements lodged with the ASX, which are available on the Dreadnought
website. They involve risk and uncertainties that could cause actual results to
differ from estimated results. Forward-looking statements include, but are not
limited to, statements concerning the Company’s exploration programme,
outlook and target sizes. They include statements preceded by words such as
“potential”, “target”, “scheduled”, “planned”, “estimate”, “possible”, “future”,
“prospective” and similar expressions.
Competent Person’s Statement
The information in this announcement that relates to geology and exploration
results and planning was compiled by Mr. Dean Tuck, who is a Member of the
AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient
experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the 'Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr.
Tuck consents to the inclusion in the report of the matters based on the
information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that
materially affects the information in the original reports, and that the forma and
context in which the Competent Person’s findings are presented have not been
materially modified from the original reports. (referencing historic and new
company announcements).
2
Company Snapshot
Capital Structure
ASX Code
DRE
Share Price (12/09/2023)
$0.055
Shares on Issue
3,359M
60
59
Market Cap
$184.7M
Cash (30/06/2023)
~$11.7M
Nd
Pr
60.2M
Neodymium
Praseodymium
28
29
Ni
Cu
Nickel
Copper
Unlisted Securities (various strike prices)
Liquidity (90-day average)
~$0.5M / day
Board and Management Cash Investment
~$5,300,000
Board & Management
Paul Chapman
Dean Tuck
Managing Director
Philip Crutchfield
Non-Executive Director
Robert Gee
Non-Executive Director
Debbie Fullarton
Matt Crowe
ASX:DRE
Non-Executive Chairman
Jessamyn Lyons
Chief Financial Officer
COO & Exploration Manager
Company Secretary
3
Project Overview
Mangaroon REE & Au (100%)
➢ ~5,300km2 in the Gascoyne
➢ Initial JORC Resource delivered over <10% of known REE
ironstones
➢ Six carbonatites to be tested for Mt Weld style (Lynas - $7,800m)
➢ Three rigs on site delivering discovery and resource drill outs
Mangaroon Ni-Cu-PGE (FQM earning up to 70%)
➢ ~1,100km2 in the Gascoyne
➢ FQM to spend $15M for 51% and 70% upon decision to mine
➢ High tenor Ni-Cu-PGE sulphide confirmed in drilling
Tarraji-Yampi Cu-Ag-Au-Co (100%, E04/2315 80%)
➢ ~2,400km2 in the West Kimberley
➢ Outcropping mineralisation, unexplored since 1978
➢ Orion Cu-Ag-Au-Co massive sulphide discovery
Bresnahan HREEs (100%)
➢
➢
~3,700km2 covering the Bresnahan Basin in the Gascoyne
Prospective for unconformity HREEs (Northern Minerals - $300M)
Central Yilgarn Ni-Au-LCT-Iron Ore (100%)
ASX:DRE
➢
➢
~1,600km2 covering ~150km strike over four greenstone belts in the Yilgarn
Significant gold, nickel and LCT pegmatite potential
4
Mangaroon Project
Rare Earths - Niobium: (100%)
• Ironstones: high-grade, high NdPr, de-risked
metallurgy
• Carbonatites: Multiple pulses of high-grade Rare
Earths, Niobium, Phosphate, Titanium and
Scandium
Ni-Cu-PGE: (FQM earning up to 70%)
• FQM earning 51% by spending $12M and a
further 19% by sole funding to a Decision to Mine
Gold: (100%)
• Historical high-grade gold mined by pastoralists
and prospectors, no modern exploration
ASX:DRE
5
Mangaroon Rare Earths – Yin Ironstones
High NdPr:TREO Ratios
• Region contains the highest NdPr:TREO ratios in the world: 28-31%
NdPr:TREO ratio
• Currently bringing higher >40% NdPr:TREO ironstones into Resource
Metallurgy Confirmed
• Region contains some of the highest rare earth recoveries in the world
• 15.31% Nd2O3 + Pr6O11 with 92.8% recovery
• 10.76% Nd2O3 + Pr6O11 with 85.9% recovery
Significant Resource Drilling Completed
• Converting higher NdPr:TREO material
• Significant upgrade to Indicated to support Scoping Study
• Project de-risking
Mt
TREO
(%)
Nd2O3+Pr6O11
(kg/t)
NdPr:TREO
(%)
Contained
TREO (t)
20.06
12.49
8.38
5.66
1.03
1.41
1.88
2.18
2.9
4.3
5.6
6.5
28%
29%
30%
30%
205,900
182,800
157,700
123,400
Contained
Nd2O3+Pr6O11 (t)
Cut-Off
(%TREO)
58,400
53,300
47,000
37,000
0.20
0.40
1.00
1.50
Yin Indicated + Inferred Resource as adjusted for different cut-off grades.
ASX:DRE
5 July 2023
40% Increase in Resource Tonnage at Yin
6
Mangaroon Rare Earths – Gifford Creek Complex
Large Scale Potential
• 43kms of REE Ironstones
• Ever expanding carbonatite complex
Ironstones
• Similar to the Yangibana Ironstones next door
• Resource Drilling Complete over only 10% of
known strike
• Exploration Target: 50-100mt @ 0.9-1.3%
TREO
Carbonatites
• New to the region, recent discovery
• Still finding the edges
ASX:DRE
7
CI-C5 Carbonatites
Mt
TREO
(%)
NdPr:TREO
(%)
Nb2O5
(%)
P2O5
(%)
TiO2
(%)
Sc (ppm)
5.73
10.84
20.55
45.87
1.18
1.00
0.80
0.58
21
21
21
21
0.25
0.22
0.15
0.10
3.8
3.5
3.0
2.7
5.4
4.9
3.9
3.0
92
85
68
52
C3 Inferred Resource as adjusted for different cut-off grades.
28 August 2023
Initial, Independent REE-Nb-P-Ti-Sc Resource at C3
Large Scale Potential
• Multiple carbonatite intrusions identified
• Bulk tonnage with near surface supergene
enrichment
Multiple Critical Metals
• Rare Earths, Niobium, Phosphate, Titanium,
Scandium
Next Steps
• Complete geophysical review
• Targeted first pass drilling
• Metallurgy
ASX:DRE
SEPTEMBER 2023
8
Mangaroon Ni-Cu-PGE (FQM Earn-In)
Money Intrusion
• ~50km long, outcropping mafic-ultramafic intrusion
• High tenor magmatic Ni-Cu-Co-PGE Sulphide System
FQM Earn-In
• FQM to spend $12M to earn an initial 51% and additional
19% upon a decision to Mine
Next Steps
• Additional geophysics: DHEM, IP
• Drilling November 2023
ASX:DRE
9
Mangaroon Ni-Cu-PGE (FQM Earn-In)
Drill Program
• Originally 5 RC holes testing 5 EM plates with
DHEM
• Massive sulphides confirmed – thick halo of
mineralisation blind to geophysical surveys
completed to date
• Mineralisation confirmed over 400m of blind step
out holes – open in all directions
ASX:DRE
10
Mangaroon Ni-Cu-PGE (FQM Earn-In)
Money Intrusion
• Technically, mineralisation open all the way to
Bookathanna, 2.5kms to the South and still open.
• High tenors mean even non massive sulphide can
produce high grades (Jinchuan)
• With a fertile system confirmed, deeper trap sites remain
highly prospective for high tenor massive sulphides
(Eagle)
• Continues to underscore the potential of the rest of the
intrusion
ASX:DRE
11
Tarraji-Yampi Cu-Ag-Au-Co
Why are we here?
• Off-limits to exploration since 1978
• Mineralisation sticking out of the ground
The Opportunity
• Cloncurry / Tennant Creek in WA
• High Grade Cu-Ag-Au-Co
• Unexplored, no modern exploration
Next Steps
• Discovery Drilling – September
WMC’s David Barr (L) & Roy
Woodall (R) at Tarraji 1950s
ASX:DRE
DRE’s Nicholas Chapman at Tarraji 2021
12
Tarraji-Yampi Cu-Ag-Au-Co
2021 Orion Discovery
• KMRC022: 16m @ 2.2% Cu, 38.7gt Ag, 6.6g/t Au,
0.4% Co
• Confirmed over 250m strike, to a depth of ~150m
• Geophysics shows it down to 500m
Orion Discovery 2021
Shallow Cover
• Black plain soils only 1-9m thick
• Auger geochemistry a transformative dataset
Orion’s Friends
• 13 Orion look-a-likes defined
• Similar geochemical and geophysical signature
• Some with outcropping gossans
• Ready to drill
ASX:DRE
Prove the Scale, prove the met, prepare for 2024
Drilling to commence next week
13
Take Away Message
Strong news flow throughout 2023
• Average >1 ASX announcement / week
Track record of delivering discoveries
• Yin REE ironstone
• C3 and C5 REE-Nb carbonatites
• Sabre/Y8 REE ironstones
• Orion Cu-Ag-Au-Co massive sulphide
• Metzke’s and Longmore’s gold
Poised to deliver additional discoveries in 2023/2024
• Mangaroon Ni-Cu-PGE (FQM Earn-in/ JV)
• Kimberley Cu-Ag-Au-Co
• Mangaroon Au (100%)
• Bresnahan HREEs, Au-Ag-Sb
• Central Yilgarn Ni, Au, Li
Experienced management team with a track record of success and strongly
aligned with shareholders
• $5.3M invested to date
• ~15% Board and management ownership
ASX:DRE
14
ASX:DRE Dreadnought Resources Ltd
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court, Osborne Park WA 6017
dreadnoughtresources.com.au
Share your feedback
Discover