Strong Gold Anomaly at Steves Reward - Mangaroon
Released
Released
Announcement PDF
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX ANNOUNCEMENT 22 July 2025
Strong Gold Anomaly at Steve’s Reward - Mangaroon (100%)
HIGHLIGHTS
• A recently completed surface geochemical survey at Steve’s Reward has defined a large gold-in-soil anomaly
(>~2,600m x ~600m) that remains open along strike.
• Significantly, the strongest gold-in-soil anomaly is located ~500m northwest of recent drilling (assays pending)
including one of the highest gold-in-soil values from Mangaroon to date of 770ppb Au.
• Steve’s Reward has never previously been drilled or mined.
• Additional soil and stream sediment surveys are underway and a detailed airborne magnetic survey was completed
to assist with lithostructural interpretations and targeting.
• Assays from recent RC drilling at Steve’s Reward and Inevitable are expected in July 2025.
• Assays from a batch of samples from RC drilling at Popeye and Star of Mangaroon are expected in August 2025.
• Drilling continues with an RC rig and diamond rig at Star of Mangaroon and a diamond rig at Stinger. Drilling will
finish in August 2025 with assays in September 2025.
Dreadnought Resources Ltd (“Dreadnought”) is pleased to provide an update on activities
at Steve’s Reward, part of the 100% owned Mangaroon Gold Project (“Mangaroon”), in the
Gascoyne region of WA.
Dreadnought’s Managing Director, Dean Tuck, commented: “Exploring for the next major gold discovery at Mangaroon
is a key pillar of the Finding More Gold, Faster strategy. As part of that, target generation and definition work like surface
geochemical surveys are critical to building compelling drill targets. The drill programs at Steve’s Reward currently underway
are the first to focus on discoveries. We are excited by the scale and grade of these gold-in-soil anomalies at Steve’s Reward
and eagerly await assays from the recent lode drilling there.”
Figure 1: Photo of the RC rig at Steve’s Reward.
ASX:DRE
Dreadnought Resources Ltd 1
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Steve’s Reward (100%)
Steve’s Reward is hosted by metasediments, volcanics and chemical formations of the 2.4Ga Leake Spring
Metamorphics in proximity to the Magweera and Jimmy Well shear zones. Both zones are splays off the crustal scale
Minga Bar Fault. The occurrence of major structural splays and host rocks with significant chemical and rheological
contrasts is prospective for orogenic gold.
An outcropping gold lode was identified in 1996 producing significant rock chip results, up to 116g/t Au (*123105) over
80m in strike, however no further work or drilling was undertaken.
Recent surface sampling and detailed mapping identified numerous high-grade, sub-cropping, gold rich lodes over an
area of ~300m x ~200m with significant rock chip assays including:
JRK002: 30.3g/t Au
SRRK008: 49.5g/t Au
SRRK006: 100.5g/t Au
SRRK002: 155.5g/t Au
In addition, a further 404 soil samples were collected prior to the commencement of drilling of these lodes. This
work has resulted in a gold-soil-anomaly >~2,600m x 600m in dimension and remaining open along strike in both
directions.
Significantly, the strongest gold-in-soil anomaly is located ~500m to the northwest of the lode drilling.
Furthermore, the gold-in-soil anomaly has become one of the largest and most significant at Mangaroon to date,
extending zone from ~300m x 200m to >~2,600m x 600m.
A total of 15 RC holes were recently drilled at Steve’s Reward and assays are expected in July 2025.
Figure 2: Plan view image of the gold-in-soil anomaly at Steve’s Reward in relation to recent lode drilling.
ASX:DRE
Dreadnought Resources Ltd 2
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Dreadnought’s work plan summary
Star of Mangaroon
Open Pit
Mangaroon Drilling
Sep 2025 Quarter
Dec 2025 Quarter
Mining, Haul, Process Agreement
Approvals and Commencement of
Production
Star of Mangaroon extensions, Popeye, Pritchard’s, McCarthy Workings,
Steve’s Reward, Cullens, Midday Moon, Nina, Lightening Ridge, Minga Bar and Edmund.
Mangaroon
Exploration
Bordah, High Range and Minga Bar
Illaara Drilling
(Aircore)
Metzke’s, Lawrence, SW BIF Horizon,
Black Oak – Homestead
Upcoming News
•
•
•
•
•
•
•
•
•
•
July: Drilling results from Steve’s Reward and Inevitable
25th July: Presenting at the Noosa Mining Conference, Noosa QLD
29th July: Quarterly Hubinar - Online
August: Drilling results from Popeye and Star of Mangaroon
4-6th August: Attending Diggers and Dealers Mining Forum, Kalgoorlie WA
August: Completion of drilling at Mangaroon
September: Drilling results from Star of Mangaroon
September Quarter: Update on Star of Mangaroon Processing Agreement
September: Recommencement of gold drilling at Mangaroon
October: Presenting at the Australian Gold Conference, Sydney NSW
For further information please refer to previous ASX announcements:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
25 November 2020
15 March 2021
17 May 2021
12 September 2022
7 June 2023
4 September 2023
11 December 2023
13 March 2024
26 July 2024
26 July 2024
1 October 2024
14 October 2024
27 November 2024
28 January 2025
30 January 2025
18 March 2025
20 June 2025
23 June 2025
Mangaroon Ni-Cu-PGE & Au Project
Exploration Commences at Mangaroon Ni-Cu-PGE & Au Project
Update on Mangaroon Ni-Cu-PGE & Au Project
Star of Mangaroon Acquisition & Consolidation
Mangaroon Gold Review and Further Consolidation
Outstanding Gold Opportunities Along >10km Mangaroon Shear Zone
Thick, High-Grade Gold Including 7m @ 23.0g/t Au
Star of Mangaroon Camp Scale Gold Prospect Expands to ~15km x 10km
Strategic & Prospective Consolidation
Consolidation, Growth & Commercialisation
Shallow, High-Grades at Star of Mangaroon & Popeye
Exceptional Gold Recoveries from Star of Mangaroon
Shallow, High-Grade, 84% Indicated Au Resource
Robust Scoping Study for Star of Mangaroon
Further Consolidation and High-Grade Gold at Mangaroon
High Grade Gold Lode Extended
Star of Mangaroon Extended
Gold Drilling Commenced at Mangaroon
~Ends~
For further information please contact:
Dean Tuck
Managing Director
Dreadnought Resources Limited
E: dtuck@dreres.com.au
Jessamyn Lyons
Company Secretary
Dreadnought Resources Limited
E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
ASX:DRE
Dreadnought Resources Ltd 3
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Snapshot – Mangaroon Gold (100%)
Mangaroon Gold is Large Scale
•
Mangaroon covers ~5,000kms2 with an initial focus on the gold system situated over the Mangaroon Shear Zone
between the crustal scale Minga Bar and Edmund Faults with multiple phases of intrusions. Numerous historical
workings along the Mangaroon Shear Zone have only seen limited drilling. This area also contains the ~12km x
6km Bordah and ~50km long High Range prospects where limited previous exploration has identified outcropping
gold and base metal mineralisation.
Self-Funded Explorer Strategy
•
Dreadnought’s strategy is to transform into a self-funded explorer. This involves a high-grade open pit at the Star
of Mangaroon where funding, development, haulage & processing are outsourced to third parties. This is a
common model in WA given the robust gold price. In this way, there is reduced reliance on market funding and
internal cashflows are aimed at making life-changing discoveries.
Consolidation Provides for First Ever Modern Exploration
•
All historical workings and known gold occurrences relate to outcropping mineralisation. There has been minimal
historical and modern exploration due to fractured, small-scale ownership with Dreadnought now undertaking
modern exploration for the first time.
Significant, Step-change, Growth Potential
•
Five historical mines developed on outcropping mineralisation and dozens of gold occurrences along highly
prospective structural corridors.
•
Dreadnought is deploying modern geochemical and geophysical techniques to explore for mineralisation under
shallow cover. These techniques have already generated new prospects with stronger and larger signatures than
the historical mines, including the region’s largest high-grade producer at the Star of Mangaroon mine.
•
Project-wide stream sediment sampling and geophysical surveys have identified additional camp scale prospects
at Bordah and High Range.
Shallow, High-grade Gold
•
The initial Resource at Star of Mangaroon contains shallow, high-grade gold as per Table 1 below:
Table 1: Resource (2g/t Au cut-off grade) - Numbers may not add up due to rounding.
Type
Transition
Fresh
Total
•
Indicated
Tonnes
1,900
42,500
44,400
Au (g/t)
26.9
13.0
13.6
Inferred
Au (Oz)
1,700
17,800
19,500
Tonnes
12,200
12,200
Au (g/t)
9.8
9.8
Total
Au (Oz)
3,900
3,900
Tonnes
1,900
54,700
56,600
Au (g/t)
26.9
12.3
12.8
Au (Oz)
1,700
21,700
23,400
Also, Popeye, located <1km from the Star of Mangaroon, contains significant shallow high-grade gold including:
POPRC001: 3m @ 22.8 g/t Au from 13m POPRC002: 1m @ 1.6 g/t Au, 15.5g/t Ag from 11m
Exceptional Metallurgical Recoveries
•
The region is known for its free gold. Accordingly, metallurgical work at Star of Mangaroon produced exceptional
recoveries from standard gravity and carbon in leach circuits averaging 96.7% combined recovery including an
average 74.4% gravity recovery (ASX 14 Oct 2024).
ASX:DRE
Dreadnought Resources Ltd 4
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forward-looking
information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual
results and developments will almost certainly differ materially from those expressed or implied. There are a number of risks, both specific to
Dreadnought, and of a general nature which may affect the future operating and financial performance of Dreadnought, and the value of an investment
in Dreadnought including and not limited to title risk, renewal risk, economic conditions, stock market fluctuations, commodity demand and price
movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve
estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and mining development, construction and commissioning risk.
Competent Person’s Statement – Mineral Resources
The information in this announcement that relates to the Star of Mangaroon Mineral Resource is based on information compiled by Mr. Paul Payne, a
Competent Person who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr. Payne is a full-time employee of Payne Geological Services
Pty Ltd and is a shareholder of Dreadnought Resources Limited. Mr. Payne has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity that is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves’. Mr. Payne consents to the inclusion in the announcement
of the matters based on his information in the form and context that the information appears.
Competent Person’s Statement – Exploration Results
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled by Mr. Dean Tuck,
who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the
announcement of the matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information included in the original market
announcements by Dreadnought Resources Limited referenced in this report and in the case of Mineral Resources, Production Targets, forecast financial
information and Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. To the extent disclosed above, the Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcements.
GOLD RESOURCES AT MANGAROON AU
Star of Mangaroon – Indicated and Inferred Resources
Table 2: Resource (2g/t Au cut off grade) - Numbers may not add up due to rounding
Type
Transition
Fresh
Total
ASX:DRE
Indicated
Tonnes
1,900
42,500
44,400
Au (g/t)
26.9
13.0
13.6
Inferred
Au (Oz)
1,700
17,800
19,500
Tonnes
12,200
12,200
Au (g/t)
9.8
9.8
Total
Au (Oz)
3,900
3,900
Tonnes
1,900
54,700
56,600
Au (g/t)
26.9
12.3
12.8
Au (Oz)
1,700
21,700
23,400
Dreadnought Resources Ltd 5
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling techniques
•
Rock Chips
•
•
•
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed information.
Rock Chips were collected by Dreadnought staff and
submitted for analysis. Rock chips are random, subject to
bias and often unrepresentative for the typical widths
required for economic consideration. They are by nature
difficult to duplicate with any acceptable form of precision or
accuracy.
Rock chips have been collected by Dreadnought to assist in
characterising different lithologies, alterations and
expressions of mineralisation. In many instances, several
rock chips were collected from a single location to assist
with characterising and understanding the different
lithologies, alterations and expressions of mineralisation
present at the locality.
Rock chips were submitted to ALS Laboratories in Perth for
determination of gold by fire assay and ICP-MS finish (ALS
Method Au-ICP22) and 48 other elements by four acid
digest and ICP-MS finish (ALS Method ME-MS61).
Soil Sampling
Soil samples were collected by Dreadnought and contractor
(OZEX Exploration Services) personnel on a 800x50m,
400x50m, 200x50m or 100x50m grid across the Project.
Samples were collected by digging a 30x30x10cm pit,
homogenising and then sieving and collection of a dry 200g 177µm sample.
Soils samples were submitted to Labwest (Perth) for Ultra
Fine Fraction (UFF) separation (<2µm) and analysis by Aqua
Regia ICP-MS & ICP-OES for determination of Au and 45
other elements.
Stream Sediment Sampling
Soil samples were collected by Dreadnought and contractor
(OZEX Exploration Services) personnel on a ~1 sample per
5 sq km drainage catchment across the Project and infilled to
~1 sample per 1 sq km drainage catchment in areas of
interest.
Samples were collected by digging multiple pits across active
drainage lines in areas with the finest material and then
sieving and collection of a dry 200g -177µm sample.
Stream sediment samples were submitted to Labwest
(Perth) for Ultra Fine Fraction (UFF) separation (<2µm) and
analysis by Aqua Regia ICP-MS & ICP-OES for determination
of Au and 45 other elements.
Drilling techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
No drilling reported.
Drill sample recovery
•
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
No drilling reported.
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
No drilling reported.
•
•
Logging
•
•
•
ASX:DRE
Dreadnought Resources Ltd 6
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Criteria
JORC Code explanation
Commentary
intersections logged.
Sub-sampling
techniques and sample
preparation
•
•
•
•
•
•
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
Rock Chips
Entire rock chips were submitted to the lab for sample prep
and analysis.
Stream Sediment and Soil Samples
Stream sediment and soil samples were submitted to
LabWest in Perth where the -2 µm particle size fraction is
extracted using the UltraFine method developed by CSIRO
and LabWest.
Every 50 samples a field duplicate is collected by digging a
second 30x30x10cm pit within 2-3m of the original,
homogenising and then sieving and collection of a dry 200g 177µm sample.
Sample sizes for are appropriate to the grain size of the
material sampled.
No drilling reported.
Quality of assay data
and laboratory tests
•
•
•
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Rock Chips
Assay technique is Fire Assay which is a ‘Total Technique’
for Au. Four acid digest is considered a ‘near total’ technique
for the 48 elements received under ME-MS61.
Standard laboratory QAQC is undertaken and monitored by
the laboratory and by the company upon assay result
receival.
Stream Sediment and Soil Samples
Samples were screened in the field to -177µm.
Labwest then takes a sub-sample of <2µm material for
analysis.
The UFF sample preparation was defined following a
Research and Development project conducted under the
direction of CSIRO.
Field duplicates are submitted and perform to internal DRE
standards.
Orientation work as part of CSIRO research and previous
work by Dreadnought Resources indicates the grain size is
appropriate for the material being tested.
Verification of
sampling and assaying
•
•
•
•
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Rock Chips
All significant results are revisited with follow up sampling
and mapping.
Geochemical sample coordinates and geological information
is written in field books and coordinates and track data
saved from handheld GPSs used in the field.
Field data is entered into excel spreadsheets and then loaded
into a geological database.
Stream Sediment and Soil Samples
All significant results are revisited with follow up sampling
(upstream) including occasionally a repeat sample from the
original location.
Location of data points
•
•
•
Data spacing and
distribution
•
•
•
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
All sample locations were recorded with a Garmin handheld
GPS which has an accuracy of +/-3m
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Stream Sediment and Soil Samples
GDA94 MGAz50
The soil and stream sediment sample spacing and
distribution is not sufficient to establish the degree of
geological and grade continuity appropriate for a Mineral
Resource.
No drilling reported.
ASX:DRE
Dreadnought Resources Ltd 7
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Criteria
JORC Code explanation
Commentary
Orientation of data in
relation to geological
structure
•
At this early stage of exploration, mineralisation thickness’s,
orientation and dips are not known.
•
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
•
The measures taken to ensure sample security.
All geochemical samples were collected, bagged, and sealed
by Dreadnought or OZEX staff.
Sample security
No drilling reported.
Samples were delivered to Labwest (Perth) by Dreadnought
or its freight contractors.
No drilling reported.
Audits or reviews
•
The results of any audits or reviews of sampling techniques
and data.
The program is continuously reviewed by senior company
personnel.
Section 2 Reporting of Exploration Results
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Mineral tenement and
land tenure status
•
The Mangaroon Project consists of 22 granted Exploration
License (E08/3178, E08/3229, E08/3274, E08/3275,
E08/3439, E09/2195, E09/2290, E09/2359, E09/2370,
E09/2384, E09/2405, E09/2422, E09/2433, E09/2448,
E09/2449, E09/2450, E09/2467, E09/2473, E09/2478,
E09/2479, E09/2535, E09/2616), 1 pending Exploration
License (E08/3539) and 6 granted Mining Licenses (M09/63,
M09/91, M09/146, M09/147, M09/174, M09/175).
All tenements are 100% owned by Dreadnought Resources.
E08/3178, E09/2370, E09/2384, E09/2433, E08/3274,
E08/3275, E09/2433, E09/2448, E09/2449, E09/2450 are
subject to a 1% Gross Revenue Royalty held by Beau
Resources.
E09/2359 is subject to a 1% Gross Revenue Royalty held by
Prager Pty Ltd.
E09/2422, E08/*3229 and E08/3539 are subject to a 1%
Gross Revenue Royalty held by Redscope Enterprises Pty
Ltd.
E09/2290, M09/146 and M09/147 are subject to a 1% Gross
Revenue Royalty held by STEHN, Anthony Paterson and
BROWN, Michael John Barry.
E09/2497 is subject to a 1% net smelter royalty held by Nina
Minerals Pty Ltd.
M09/174 is subject to a 0.5% Gross Revenue Royalty held by
STEHN, Anthony Paterson.
M09/175 is subject to a 0.5% Gross Revenue Royalty held by
STEHN, Anthony Paterson and BROWN, Michael John
Barry.
M09/91 is subject to a 1% Gross Royalty held by DOREY,
Robert Lionel.
M09/63 and E09/2195 are subject to a 1% Net Smelter
Royalry held by James Arthur Millar
The Mangaroon Project covers 4 Native Title
Determinations including the Budina (WAD131/2004),
Thudgari (WAD6212/1998), Gnulli (WAD22/2019) and the
Combined Thiin-Mah, Warriyangka, Tharrkari and Jiwarli
(WAD464/2016).
The Mangaroon Project is located over Lyndon, Mangaroon,
Gifford Creek, Maroonah, Minnie Creek, Edmund,
Williambury and Towera Stations.
Historical exploration of a sufficiently high standard was
carried out by a few parties which have been outlined and
detailed in this ASX announcement including:
Regional Resources 1986-1988s: WAMEX Reports A23715,
23713
•
Exploration done by
other parties
ASX:DRE
•
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.
Acknowledgment and appraisal of exploration by other
parties.
Dreadnought Resources Ltd 8
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Criteria
Geology
Drill hole information
JORC Code explanation
•
•
•
Data aggregation
methods
•
•
•
Relationship between
mineralisation widths
and intercept lengths
•
•
•
Diagrams
•
Balanced reporting
•
Deposit type, geological setting and style of mineralisation.
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion does
not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(e.g. ‘down hole length, true width not known’).
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should include,
but not be limited to a plan view of drill hole collar locations
and appropriate sectional views.
Where comprehensive reporting of all Exploration Results
is not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
Commentary
Peter Cullen 1986: WAMEX Report A36494
Carpentaria Exploration Company 1980: WAMEX Report
A9332
Newmont 1991: WAMEX Report A32886
Hallmark Gold 1996: WAMEX Report A49576
Rodney Drage 2011: WAMEX Report A94155
Sandfire Resources 2005-2012: WAMEX Report 94826
Helix Resources 1996: WAMEX Report 49943
The Mangaroon Project is located within Mangaroon Zone
of the Gascoyne Province.
The Mangaroon Project is prospective for orogenic gold,
magmatic Ni-Cu-Co-PGE mineralisation and carbonatite
hosted REEs.
No drilling reported.
No drilling reported.
No drilling reported.
Refer to figures within this report.
The accompanying document is a balanced report with a
suitable cautionary note.
Figures within the announcement show the location and
results of all soil samples collected within the reported
area.
Statistics for UFF stream sediment samples (Au) wi
Share your feedback
Discover