ASX ANNOUNCEMENT 7 August 2023
Rare Earth Ironstone and Carbonatite Drilling Update – Mangaroon (100%)
HIGHLIGHTS
•
In July 2022, initial discovery drilling at the Yin Ironstone Complex (“Yin”) intersected the thickest and highestgrade rare-earth ironstone intercepts seen in over 35 years of exploration in the Gifford Creek Carbonatite
Complex. Over the next 12 months, Dreadnought would announce:
• Two JORC 2012 Mineral Resource (“Resource”) estimates at Yin for 20.06Mt @ 1.03% TREO (ASX 5
Jul 2023)
• An Exploration Target* of 50-100Mt of 0.9-1.2% TREO on the ~43km long Yin trend (ASX 13 Feb 2023)
• Discovery of additional rare earth ironstones at Sabre, Y8 and Y2
• Discovery of high-grade rare earth and niobium zones at the C3 and C5 carbonatites
•
First pass, wide spaced (400m x 40m) RC drilling of ~18km strike along the ~43km Yin trend is now complete
with ~16 kms of mineralised ironstones confirmed. Significant new intercepts include:
YINRC262: 24m @ 1.14% TREO
2.3 kg/t Nd2O3+Pr6O11
(20% NdPr:TREO) from 106m including:
5m @ 2.06% TREO
4.2 kg/t Nd2O3+Pr6O11
(21% NdPr:TREO) from 106m.
YINRC244: 6m @ 1.45% TREO
2.5 kg/t Nd2O3+Pr6O11
(17% NdPr:TREO) from 68m including:
2m @ 3.60% TREO
6.4 kg/t Nd2O3+Pr6O11
(18% NdPr:TREO) from 68m.
YINRC252: 5m @ 1.29% TREO
2.4 kg/t Nd2O3+Pr6O11
(19% NdPr:TREO) from 96m including:
2m @ 2.12% TREO
4.0 kg/t Nd2O3+Pr6O11
(19% NdPr:TREO) from 96m.
•
Within the ~16km of mineralised ironstones, ~5-6kms of high NdPr:TREO ratio mineralisation is being infill drilled
(100m x 40m and 50m x 40m) for a third Resource update due in the December 2023 quarter. That Resource
update will underpin an initial Scoping Study.
•
First pass, wide spaced (160m x 160m) RC drilling is ongoing at the C1-C5 carbonatites. C1-C5 has now been
confirmed to extend over an additional 3kms and is now ~9km x ~1km in dimension.
•
An initial Resource for C3 remains on track for August 2023.
Dreadnought Resources Limited (“Dreadnought”) is pleased to announce a drilling update
from the first pass and resource drilling along the Yin
Ironstone Complex and the recommencement of first
pass drilling at the C1-C5 carbonatites, part of the 100%
owned Mangaroon Project, located in the Gascoyne
Region of Western Australia.
Dreadnought’s Managing Director, Dean Tuck, commented: “Over the past
month we have completed the infill drilling for the December 2023 Resource
update for Yin. Drilling at C1-C5 has now extended the carbonatites to 9km x
1km and is ongoing. The initial Resource for C3 remains on track for August
2023. These Resources will be factored into future studies. We look forward to
additional discoveries within this highly prospective and fertile carbonatite
intrusive complex.”
Figure 1: Dreadnought geologist Claudia Tomkins sighting in a drill pad
for an angled hole at Yin.
dreadnoughtresources.com.au
1
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
SNAPSHOT – MANGAROON CRITICAL MINERALS
Mangaroon is 100% Owned by Dreadnought
Genuine Scale Potential Already at Yin REE Ironstone Complex
•
Independent Yin Resource of 20.06Mt @ 1.03% TREO (ASX 5 Jul 2023) covers only ~4km of ~43km of strike including
an initial Indicated Resource of 5.52Mt @ 1.23% TREO covering only ~250m of strike (ASX 5 Jul 2023).
•
Exploration Target* of 50-100Mt @ 0.9-1.3% TREO estimated for the top 150m of the Yin REE Ironstone
Complex (ASX 13 Feb 2023).
*Cautionary Statement: The Exploration Target has been prepared and reported in accordance with the 2012 edition of the JORC Code. The potential quality
and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Resource for all target areas reported. It is
uncertain if further exploration will result in the estimation of a Resource.
•
Resource extension and first pass wide spaced drilling ongoing.
Significant, Step-Change, Growth Potential Beyond Yin REE Ironstone Complex
•
C1-C7 carbonatites are considered to be the regional source of rare earths – initial drill program expands C1C5 to ~9kms x 1km.
•
C6 located ~25kms south of C1-C5 and C7 is situated over a crustal scale structural splay off the Lyons River
Fault; associated with an outcropping pyroxenite intrusion; and geophysically similar to globally significant
carbonatites such as Mt Weld, Araxa, Palabora and Ngualla.
•
First pass, wide spaced discovery focused drilling is ongoing at C1-C7.
High-Grade, Multi-Metal Potential Including REE (Neodymium, Praseodymium), Phosphate,
Niobium, Titanium & Scandium (REE-P2O5-Nb2O5-TiO2-Sc)
•
The mineralisation at the Yin REE Ironstone Complex contains significantly higher NdPr as a fraction of the total
rare earth oxides (“NdPr:TREO” ratio) than most other REE deposits globally, over 50% higher than the global
average.
•
Partially completed, first pass, wide spaced drilling over C1-C7 has identified significant critical metal potential
with REE, P2O5, Nb2O5, TiO2 and Sc.
•
A ~600m x 550m zone of REE-P2O5-Nb2O5-TiO2-Sc mineralisation has been confirmed at C3 where an initial
Resource is on track for August 2023.
Potentially Attractive Mining Proposition
•
Broad zones of flat to moderate dipping mineralisation with parallel lodes and Resource intensity of ~5Mt/km
make for a potentially attractive mining proposition.
Positive Metallurgy Results
•
Metallurgical test work from Yin has performed well, achieving recoveries ranging from 85.9% to 92.8% at
concentrate grades of 10.76% to 15.31% Nd2O3+Pr6O11.
•
REEs at Yin are predominantly hosted in monazite which is amenable to commercial processing.
•
Significant metallurgical studies ongoing – results expected throughout 2023.
Global Strategic Imperative Driving Rare Earth Growth & Prices
•
Supply chain security and low carbon transition are imperatives against a backdrop of heightened geopolitical
tension.
•
Dreadnought is receiving increasing levels of interest from midstream and downstream industry participants in
Mangaroon. While the current focus is on upstream options (mining, milling and concentrating) opportunities to
collaborate with midstream and downstream industry participants may represent an additional upside value
opportunity for Dreadnought’s shareholders in the future.
dreadnoughtresources.com.au
2
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
RC Drill Program Yin Ironstone Complex (YINRC130-YINRC425, Y3RC039-Y3RC053)
So far in 2023, 310 RC holes (36,204m) and 11 diamond holes (1,525.95m) have been drilled testing portions of the
~43km long Exploration Target and extending and upgrading the current Yin Resource.
Two High-Grade NdPr Discoveries (Y2 and Yin North): In addition, wide spaced (400m x 40m) drilling has identified
two new ironstone lodes (over ~2kms) to the north of the Yin Resource. Importantly, these lodes contain the highest
NdPr:TREO ratios seen to date including:
YINRC152: 17m @ 0.85% TREO
2m @ 3.12% TREO
5m @ 1.35% TREO
2m @ 2.40% TREO
3.4 kg/t Nd2O3+Pr6O11 (40% NdPr:TREO) from 20m including:
13.4 kg/t Nd2O3+Pr6O11 (43% NdPr:TREO) from 34m and:
6.0 kg/t Nd2O3+Pr6O11 (45% NdPr:TREO) from 58m including:
11.0 kg/t Nd2O3+Pr6O11 (46% NdPr:TREO) from 60m
Y2 Discovery: Additionally, the shallowly dipping Y2 ironstone, located ~1km northwest of the Yin Resource, is
expected to grow into a high-grade NdPr Resource with significant intercepts including:
YINRC172: 22m @ 2.01% TREO
12m @ 3.10% TREO
7.7 kg/t Nd2O3+Pr6O11 (38% NdPr:TREO) from surface, including:
12.0 kg/t Nd2O3+Pr6O11 (39% NdPr:TREO) from 6m
Infill drilling at Y2 continues to deliver thick, near surface ironstone mineralisation to be included in the December
2023 quarter Resource update.
Drilling south of the Yin Resource has successfully confirmed an additional ~12kms of mineralised ironstones with
significant intercepts including:
YINRC262: 24m @ 1.14% TREO
2.3 kg/t Nd2O3+Pr6O11
(20% NdPr:TREO) from 106m including:
5m @ 2.06% TREO
4.2 kg/t Nd2O3+Pr6O11
(21% NdPr:TREO) from 106m
YINRC244: 6m @ 1.45% TREO
2.5 kg/t Nd2O3+Pr6O11
(17% NdPr:TREO) from 68m including:
2m @ 3.60% TREO
6.4 kg/t Nd2O3+Pr6O11
(18% NdPr:TREO) from 68m
YINRC252: 5m @ 1.29% TREO
2.4 kg/t Nd2O3+Pr6O11
(19% NdPr:TREO) from 96m including:
2m @ 2.12% TREO
4.0 kg/t Nd2O3+Pr6O11
(19% NdPr:TREO) from 96m
Drilling of the ironstones continues to show that the main lodes pinch, swell and change dip, potentially plunge and
orientation along strike and ranges in thickness from 1-54m. In addition, parallel lodes have been intersected above
and below the main lodes and often exhibit a similar orientation as the main lodes with thicknesses ranging from 110m.
The mineralised ironstones consist of goethite and hematite dominated oxide zones near the surface (top ~60-120m)
transitioning into a fresh ferrocarbonatite dyke (fresh REE ironstone), comprised of ankerite and siderite below the
base of oxidation. The ironstones are surrounded by a variable zone of fenitised country rock with the fenitised zone
often including thin ironstone veins.
Both the ironstone and the fenite immediately surrounding the ironstone are mineralised with each ironstone and
ferrocarbonatite containing at least one central interval of higher-grade mineralisation. Oxidised mineralisation
contains REE bearing phosphate monazite-Ce and monazite-Nd, variable amounts of the hydrated REE phosphate
rhabdophane and trace amounts of apatite which occasionally carries small amounts of rare earths. Fresh
ferrocarbonatite mineralisation contains monazite and variable amounts of apatite and REE fluoro-carbonates such
as bastnaesite.
The upcoming Resource upgrades will underpin an initial Scoping Study.
dreadnoughtresources.com.au
3
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Figure 2: Plan view of the recently completed drilling around the current Yin Resource (red dots – assays received, blue
dots – assay pending and white dots – planned drilling) over an ortho-image. This drilling is expected to both extend
the current Resource and to convert portions of the Exploration Target to Resource. The bold red line represents the
recently confirmed mineralised ironstones from the first pass wide spaced drilling program.
dreadnoughtresources.com.au
4
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Figure 3: Cross section A-A’ showing the shallowly dipping 5-30m thick Y2 lode horizon mineralised from surface.
Figure 4: Cross section B-B’ showing part of the extension to the wide main lode horizon at Yin with ~100m of oxidation and
moderately dipping to the east and remaining open at depth.
dreadnoughtresources.com.au
5
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
RC Drill Program C1-C5 Carbonatites (CRBRC90-CRBRC142)
Carbonatite intrusions are known globally to host several different commodities including rare earths, niobium,
phosphate, titanium and scandium often as different mineralised bodies within the same intrusion. Great examples
of this include Mt Weld in Australia, Ngualla in Tanzania, Araxa in Brasil and Bayan Obo in China. We also know
that a world class deposit like Mountain Pass in California can fit into a relatively small footprint (700m x 150m =
~0.1km2).
Since the C1-C5 carbonatites have minimal outcrop, a first pass RC drill program was designed on a ~160m x ~160m
spaced grid to drill through cover and into fresh rock. The objective of this program was to confirm the extent and
complexity of the interpreted carbonatite intrusions, define zones of mineralisation and to better understand the
cover regolith and depth of weathering.
Whilst high-grade mineralisation can be contained within fresh carbonatite (Mountain Pass), often mineralisation is
upgraded via dissolution of fresh carbonatite and accumulation of resistate mineralogy (i.e. monazite, pyrochlore,
columbite) within the regolith. Karsting and localised anomalously deeper weathering can significantly enhance
mineralisation grades (Mt Weld, Araxa).
To date only 118 holes (8,948m) out of a 260-hole first pass program have been completed (~45%). Already the
program has identified a ~600m x ~550m zone of REE-P2O5-Nb2O5-TiO2-Sc mineralisation at C3 and extended the
C1-C5 carbonatite system to ~9kms x 1km. In addition to the first pass program, follow up 80m x 80m angled, infill
drilling (24 holes, 3,805m) designed to identify higher-grade zones has been completed at C3. An initial Resource for
C3 remains on track for August 2023.
First pass drilling at C1-C5 has been recommenced with significant 320m x 320m steps outs to define the edges of
the carbonatites. This drilling has already successfully extended the carbonatites to ~9km x 1km and still growing.
Drilling is now defining the southwest and northeast edges before focusing on systematic drilling of the intrusive
complex for high-grade zones.
Figure 5: Plan view of the C1-C5 carbonatites over a greyscale magnetic image (RTP 1VD) showing drilled (black
and blue dots) and planned (white dots) drill hole locations. The delineated C3 zone is highlighted as are the
recently announced niobium and rare earth mineralisation at C5.
dreadnoughtresources.com.au
6
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
This infill drilling recently defined high-grade zones of rare earths and niobium over an area of ~400m x ~400m and
~250m x ~150m respectively. Significant assays received from the 24 holes include (ASX 17 July 2023):
CBRC115:
CBRC121:
CBRC125:
CBRC124:
9m @ 3.88% TREO
8.6 kg/t Nd2O3+Pr6O11
(22% NdPr:TREO) from 77m within:
102m @ 1.14% TREO 2.6kg/t Nd2O3+Pr6O11
(22% NdPr:TREO) from 3m
15m @ 3.26% TREO
6.5kg/t Nd2O3+Pr6O11
(21% NdPr:TREO) from 34m within:
62m @ 1.68% TREO
3.4kg/t Nd2O3+Pr6O11
(20% NdPr:TREO) from 7m
4m @ 2.59% TREO
5.6 kg/t Nd2O3+Pr6O11
(22% NdPr:TREO) from 50m and:
9m @ 2.03% TREO
4.9 kg/t Nd2O3+Pr6O11
(24% NdPr:TREO) from 59m within:
113m @ 1.13% TREO 2.6 kg/t Nd2O3+Pr6O11
(23% NdPr:TREO) from 3m
5m @ 1.03% TREO
2.4 kg/t Nd2O3+Pr6O11
(23% NdPr:TREO) from 15m and:
7m @ 1.04% TREO
2.3 kg/t Nd2O3+Pr6O11
(22% NdPr:TREO) from 26m
These are in addition to previous first pass rare earth results from C3 which include (ASX 24 January 2023; 3 April 2023):
CBRC033 from 13m:
44m @ 1.00% TREO
2.2 kg/t Nd2O3+Pr6O11 (22% NdPr:TREO)
CBRC029 from 6m:
31m @ 1.26% TREO
2.8 kg/t Nd2O3+Pr6O11 (22% NdPr:TREO)
CBRC027 from 9m:
21m @ 1.25% TREO
2.9 kg/t Nd2O3+Pr6O11 (23% NdPr:TREO)
CBRC084 from 16m:
24m @ 1.26% TREO
2.8 kg/t Nd2O3+Pr6O11 (22% NdPr:TREO)
CBRC083 from 14m:
34m @ 1.31% TREO
2.8 kg/t Nd2O3+Pr6O11 (21% NdPr:TREO)
Results from the infill drilling
will be included in an initial
Resource for C3 in August
2023.
REE mineralisation has been
confirmed in both weathered
and fresh carbonatites with
petrographic work showing
coarse grained (up to 0.25mm)
monazite and REE carbonate
mineralisation
in
ferrocarbonatites and magnesiocarbonatite.
XRD analysis of the weathered
carbonatites has confirmed the
presence of monazite with
further mineralogical work
ongoing
and
recently
expanded to include highgrade niobium, phosphate,
titanium and scandium zones.
Figure 6: Plan view of the highgrade rare earth (~400m x
400m) and niobium (~250m x
150m) zones at C3. Intercepts
and planned holes are featured
over a greyscale magnetic
image (RTP 1VD).
dreadnoughtresources.com.au
7
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Background on Mangaroon (E08/3274, E8/3178, E09/2384, E09/2433, E09/2473: FQM Earn-in)
(E08/3275, E09/2370, E09/2448, E09/2449, E09/2450, E09/2467, E09/2478: 100%)
Mangaroon covers >5,200sq kms of the Mangaroon Zone in the Gascoyne Region of Western Australia. Part of the
project is targeting Ni-Cu-PGE and is subject to First Quantum Minerals Ltd (“FQM”) earning up to 70% (Figure 7).
The region is also host to high-grade gold mineralisation at the Bangemall/Cobra and Star of Mangaroon gold mining
centres and the high NdPr:TREO ratio Yin and Yangibana REE deposits.
Dreadnought has located outcropping high-grade gold bearing quartz veins along the Edmund and Minga Bar Faults,
outcropping high-grade REE ironstones, similar to those under development at Yangibana, REE-Nb-Ti-P Carbonatites
and outcropping high tenor Ni-Cu-PGE blebby sulphides in the recently defined Money Intrusion.
The Yin REE Ironstone Complex already contains an independent Resource of 20.06Mt @ 1.03% TREO (ASX 5 Jul 2023)
over only ~4km of ~43km of ironstones including an initial Indicated Resource of 5.52Mt @ 1.23% TREO over only
~250m of strike (ASX 5 Jul 2023).
Figure 7: Plan view map of Mangaroon showing the location of the FQM Earn-in and 100% Dreadnought ground in
relation to major structures, geology and roads.
dreadnoughtresources.com.au
8
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
For further information please refer to previous ASX announcements:
•
24 September 2021
Airborne Magnetic-Radiometric Survey Commenced at Mangaroon
•
29 November 2021
Five Carbonatite Intrusions Identified at Mangaroon
•
1 February 2022
Rare Earths, Phosphate, Niobium & Zirconium Results from Mangaroon
•
28 September 2022
Drilling Commenced C1-C5 Carbonatites & Y8 Discovery
•
17 October 2022
Mineralised Carbonatites Discovered at C3 and C4
•
23 November 2022
Multiple, Large Scale, REE-Nb-Ti-P Carbonatites
•
24 January 2023
Carbonatite Discovery Shaping up as Regional Rare Earth Source
•
29 March 2023
Yin Resource to Grow, Carbonatite Drilling Commenced
•
3 April 2023
Carbonatites Deliver Thick, Near Surface REE Results
•
5 July 2023
40% Increase in Resource Tonnage at Yin
•
10 July 2023
High Grade Rare Earth & Niobium Zones at C3 & C5
•
17 July 2023
High Grade Rare Earth & Niobium Zones at C3 & C5
UPCOMING NEWSFLOW
August-December: Ongoing drilling results from Mangaroon REE (100%)
7-9 August: Diggers and Dealers Conference
August: Results of project nickel, gold and lithium review (Central Yilgarn 100%)
August: Initial C3 carbonatite Resource (Mangaroon 100%)
August: Results of gold target generation soil surveys at Mangaroon (100%)
September: Commencement of drilling at Tarraji-Yampi (80% and 100%)
September: Results of geophysical and geochemical surveys at Central Yilgarn (100%)
12 & 14 September: New World Metals Conference
October: Commencement of RC drilling at the Money Intrusion (Mangaroon First Quantum Earn-in)
October/November: Commencement of RC drilling at Mangaroon Au (100%)
October/November: Results from target generation and definition work at Bresnahan (100%)
December 2023 quarter: REE Resource upgrade (Mangaroon 100%)
~Ends~
For further information please contact:
Dean Tuck
Managing Director
Dreadnought Resources Limited
E: dtuck@dreres.com.au
Jessamyn Lyons
Company Secretary
Dreadnought Resources Limited
E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
dreadnoughtresources.com.au
9
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and
forward-looking information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown
risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. There
are a number of risks, both specific to Dreadnought, and of a general nature which may affect the future operating and financial
performance of Dreadnought, and the value of an investment in Dreadnought including and not limited to title risk, renewal risk,
economic conditions, stock market fluctuations, commodity demand and price movements, timing of access to infrastructure, timing of
environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve estimations, native title risks, cultural
heritage risks, foreign currency fluctuations, and mining development, construction and commissioning risk.
Competent Person’s Statement – Mineral Resources
The information in this announcement that relates to Mineral Resources is based on information compiled by Mr. Lynn Widenbar, a
Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Widenbar is a full-time employee of
Widenbar and Associates Pty Ltd. Mr. Widenbar has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity that is being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves’. Mr. Widenbar consents
to the inclusion in the announcement of the matters based on his information in the form and context that the information appears.
Competent Person’s Statement – Exploration Results
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled
by Mr. Dean Tuck, who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken
to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the announcement of the matters based on the information in the
form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports,
and that the forma and context in which the Competent Person’s findings are presented have not been materially modified from the
original reports.
Yin Resource Tables
Table 1: Summary of Yin Resources at 0.20% TREO Cut-off.
Resource
Tonnes
TREO
Nd2O3+Pr6O11
Geology
Classification
(Mt)
(%)
(kg/t)
Indicated
Oxide
3.01
1.25
3.5
Indicated
Fresh
2.52
1.21
3.4
Indicated
Subtotal
5.52
1.23
3.4
Inferred
Oxide
11.35
0.91
2.5
Inferred
Fresh
3.18
1.09
3.3
Inferred
Subtotal
14.56
0.95
2.7
Total
Oxide
14.36
0.98
2.7
Total
Fresh
5.70
1.14
3.3
TOTAL
20.06
1.03
2.9
NdPr:TREO
Ratio (%)
28
28
28
28
31
29
28
29
28
Contained
TREO
37,700 t
30,400 t
68,100 t
102,900 t
34,900 t
137,800 t
140,600 t
65,300 t
205,900 t
Contained
Nd2O3+Pr6O11
10,400 t
8,400 t
18,800 t
28,900 t
10,600 t
39,500 t
39,300 t
19,100 t
58,400 t
Table 2: Summary of Yin Resources at 0.40% TREO% Cut-off.
Resource
Tonnes
TREO
Nd2O3+Pr6O11
Geology
Classification
(Mt)
(%)
(kg/t)
Indicated
Oxide
2.19
1.61
4.5
Indicated
Fresh
1.87
1.53
4.3
Indicated
Subtotal
4.05
1.57
4.4
Inferred
Oxide
6.35
1.38
4.0
Inferred
Fresh
2.09
1.52
4.7
Inferred
Subtotal
8.44
1.41
4.2
Total
Oxide
8.53
1.44
4.1
Total
Fresh
3.96
1.52
4.5
TOTAL
12.49
1.46
4.3
NdPr:TREO
Ratio (%)
28
28
28
29
31
30
29
30
29
Contained
TREO
35,100 t
28,500 t
63,600 t
87,400 t
31,800 t
119,200 t
122,500 t
60,300 t
182,800 t
Contained
Nd2O3+Pr6O11
9,900 t
8,000 t
17,900 t
25,500 t
9,900 t
35,400 t
35,400 t
17,900 t
53,300 t
dreadnoughtresources.com.au
10
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
INVESTMENT HIGHLIGHTS
Kimberley Ni-Cu-Au Projects
Dreadnought controls the second largest land
holding in the highly prospective West Kimberley
region of WA. The main project area, TarrajiYampi, is located only 85kms from Derby and has
been locked up as a Defence Reserve since 1978.
Tarraji-Yampi presents a rare first mover
opportunity
with
known
outcropping
mineralisation and historic workings from the early
1900’s which have seen no modern exploration.
Results to date indicate that there may be a related,
large scale, Proterozoic Cu-Au-Ag-Bi-Sb-Co
system at Tarraji-Yampi, similar to Cloncurry / Mt
Isa in Queensland and Tennant Creek in the
Northern Territory.
Mangaroon Ni-Cu-PGE JV & REE Au 100%
Project
Mangaroon is a first mover opportunity covering
~5,200 kms located 250kms south-east of
Exmouth in the vastly underexplored Gascoyne
Region of WA. Part of the project is targeting NiCu-PGE and is subject to a joint venture with First
Quantum Minerals (earning up to 70%). The joint
venture area contains outcropping high tenor NiCu-PGE blebby sulphides at the Money Intrusion.
Dreadnought’s 100% owned areas contain
outcropping high-grade gold bearing quartz veins
including the historic Star of Mangaroon and Diamond’s gold mines, along the Edmund and Minga Bar Faults and
outcropping high-grade REE ironstones and seven carbonatite intrusions which may be the source of the regions rare
earth mineralisation.
Dreadnought has delivered an initial JORC Inferred Resource over just ~4kms Yin REE Ironstone Complex delivering
20.06Mt @ 1.03% TREO (28% NdPr:TREO Ratio) (ASX 5 July 2023) with an additional ~39kms of strike still to be tested.
Bresnahan HREE and Au Project
Bresnahan is located ~125km southwest of Newman in the Ashburton Basin. The project comprises ~3,700 sq kms
covering over 200kms strike along the Bresnahan Basin / Wyloo Group unconformity. Bresnahan is prospective for
unconformity related heavy rare earth (“HREE”) deposits similar to Browns Range HREE deposits and mesothermal
lode gold similar to Paulsen’s Au-Ag-Sb deposits along strike.
Prior to consolidation by Dreadnought, the Bresnahan Basin had only been explored for unconformity uranium with
limited exploration for mesothermal gold. Bresnahan is a first mover opportunity to explore for unconformity HREE.
Central Yilgarn Gold, Base Metals, Critical Minerals & Iron Ore Project
Central Yilgarn is located ~190km northwest of Kalgoorlie in the Yilgarn Craton. The project comprises ~1,600 sq
kms covering ~150km of strike along the majority of the Illaara, Yerilgee and Evanston greenstone belts. Central
Yilgarn is prospective for typical Archean mesothermal lode gold deposits, VMS base metals, komatiite hosted nickel
sulphides and critical metals including Lithium-Caesium-Tantalum.
Prior to consolidation by Dreadnought, the Central Yilgarn was predominantly held by iron ore explorers and
remains highly prospective for iron ore.
dreadnoughtresources.com.au
11
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Table 3: Significant Intersections >0.3% TREO with >2% TREO highlighted.
From
To
Interval
TREO
Nd2O3+Pr6O11
Hole ID
(m)
(m)
(m)
(%)
(%)
2.59
0.80
YINRC001
0
34
34
6.05
1.89
incl
11
21
10
1.73
0.49
YINRC002
24
55
31
3.47
1.06
incl
29
36
7
0.99
0.25
YINRC003
23
25
2
and
0.82
0.19
44
45
1
and
2.01
0.62
50
75
21
3.11
0.97
incl
58
69
11
0.55
0.12
YINRC004
60
65
5
and
0.62
0.13
70
72
2
and
1.57
0.46
80
99
19
2.01
0.60
incl
85
93
8
0.91
0.24
YINRC005
18
32
14
and
88
90
2
1.12
0.31
and
94
129
35
2.75
0.80
105
120
15
4.08
1.21
incl
85
104
19
1.00
0.30
YINRC006
and
128
131
3
0.55
0.13
and
139
165
26
1.00
0.25
157
164
7
1.91
0.45
incl
YINRC007
0
20
20
0.75
0.22
incl
2
11
9
1.25
0.36
and
33
39
6
0.25
0.07
and
43
44
1
0.23
0.04
YINRC008
0
6
6
0.28
0.09
and
16
41
26
1.31
0.38
incl
28
36
8
2.55
0.76
and
47
48
1
0.47
0.14
YINRC009
5
7
2
0.34
0.02
and
48
51
3
0.44
0.13
and
55
79
24
0.83
0.24
incl
70
77
7
2.04
0.63
and
81
82
1
0.63
0.11
and
89
90
1
0.57
0.13
YINRC011
106
123
17
1.14
0.35
incl
110
120
10
1.54
0.49
YINRC012
151
159
8
1.44
0.44
incl
154
157
3
2.28
0.69
YINRC014
0
8
8
1.39
0.44
and
23
25
2
0.72
0.18
YINRC018
0
5
5
0.28
0.02
and
12
15
3
0.24
0.06
and
36
37
1
0.22
0.07
YINRC019
13
33
20
0.81
0.09
incl
29
31
2
2.59
0.58
and
36
37
1
0.38
0.09
incl
39
40
1
0.41
0.12
and
59
60
1
1.53
0.50
YINRC020
18
24
6
0.49
0.07
and
38
39
1
0.66
0.19
and
50
53
3
0.44
0.12
and
70
75
2
1.02
0.33
dreadnoughtresources.com.au
NdPr:TREO
(%)
31
31
28
31
25
23
31
31
22
21
29
30
26
28
29
30
30
24
25
24
29
29
28
17
32
29
30
30
6
30
29
31
17
23
31
32
31
30
32
25
7
25
32
11
22
24
29
33
14
29
27
32
Prospect
Yin
12
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Table 3 (continued): Significant Intersections >0.3% TREO with >2% TREO highlighted.
From
To
Interval
TREO
Nd2O3+Pr6O11
Hole ID
(m)
(m)
(m)
(%)
(%)
YINRC021
21
22
1
0.29
0.01
and
51
54
3
0.32
0.10
and
77
78
3
0.31
0.08
and
82
83
1
0.45
0.13
and
85
89
4
0.35
0.09
YINRC022
98
103
5
0.75
0.21
incl
100
101
1
2.02
0.59
and
107
111
4
1.03
0.30
and
118
120
2
0.27
0.06
and
132
140
8
0.52
0.11
incl
133
134
1
1.92
0.48
YINRC023
0
17
17
0.75
0.24
incl
8
11
3
2.24
0.75
YINRC024
28
29
1
0.44
0.12
and
32
33
1
0.20
0.04
and
40
58
18
1.02
0.32
incl
48
56
8
1.87
0.62
incl
51
55
4
2.26
0.75
and
67
70
3
0.37
0.10
YINRC025
59
69
10
0.30
0.08
and
83
102
19
1.00
0.33
incl
90
92
2
3.15
1.06
and
111
120
9
0.31
0.08
YINRC026
25
39
14
1.05
0.34
incl
26
30
4
2.11
0.73
YINRC027
24
27
3
0.20
0.04
and
32
34
2
0.37
0.13
and
52
71
19
1.15
0.40
incl
61
69
8
2.33
0.83
YINRC028
59
63
4
0.34
0.10
and
72
122
50
0.72
0.23
incl
98
103
5
2.81
0.85
YINRC029
49
51
2
0.31
0.09
YINRC030
107
108
1
0.25
0.07
YINRC031
155
156
1
0.34
0.09
YINRC032
27
30
3
0.63
0.20
YINRC033
59
67
8
1.07
0.36
incl
61
65
4
1.58
0.54
YINRC034
110
116
6
1.37
0.43
incl
111
115
4
1.88
0.60
YINRC035
13
21
8
1.90
0.67
incl
15
20
5
2.80
0.99
YINRC036
49
62
13
1.53
0.50
incl
52
60