Exceptional Gold Recoveries from Star of Mangaroon
Released
Released
Announcement PDF
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
ASX ANNOUNCEMENT 14 October 2024
Exceptional Gold Recoveries from Star of Mangaroon - Mangaroon Au (100%)
HIGHLIGHTS
•
Five composite samples representing various grades from the Star of Mangaroon were submitted
to determine recoveries from standard gravity and carbon in leach (“CIL”) circuits.
•
The results are exceptional with:
•
•
o
Combined gravity and leach recoveries averaging 96.7% and up to 99.5%
o
High gravity recovery averaging 74.4% and up to 85.2%
Test work confirms that mineralisation at the Star of Mangaroon is free milling (non-refractory)
and amendable to conventional cyanide extraction methods with a strong gravity recovery
component. Additional strengths include:
o
Rapid leach kinetics with extraction largely completed within 8 hours.
o
Low cyanide and moderate lime consumption on all tests.
Metallurgical results will provide positive input to a scoping study for an open pit at the Star of
Mangaroon deposit. An initial Mineral Resource for the deposit is on track for in November 2024.
Dreadnought Resources Limited (“Dreadnought”) is pleased to announce exceptional
metallurgical test results from the Star of Mangaroon part of the 100% owned Mangaroon
Gold Project, located in the Gascoyne region of Western Australia.
Dreadnought’s Managing Director, Dean Tuck, commented: “These metallurgical results highlight the quality of the
mineralisation at the Star of Mangaroon and strongly support our strategy to transform into a self-funded explorer. Initially,
this involves a potential high-grade open pit at the Star of Mangaroon where we outsource funding, development, haulage &
processing to third parties. We will then look to extend this concept to Popeye, Two Peaks, Lead, Pritchard Well and so on.
This strategy allows us to focus on exploration and growth while “outsourcing” our cash-flow generating activities. These
exceptional metallurgical results will be included in the initial open-pit Mineral Resource in November 2024 which will be
promptly followed by completion of a scoping study.”
Figure 1: Image of panned gold from SOMRC004 16-17m which assayed 19.8g/t Au. Field of view ~5cm.
dreadnoughtresources.com.au
1
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Metallurgical Test Work - Star of Mangaroon Planned Open Pit
The metallurgical program assessed conventional gravity and CIL gold recovery at a range of grind sizes (212µm,
150µm, 106µm, 75µm). The results confirm that exceptional gold recoveries are achieved using conventional gravity
and CIL processing.
Key results after 48 hours were:
-
Combined gravity and leach recovery averaged 96.7% across all grind sizes and 98.6% at 75μm grind size.
-
Gravity gold recovery averaged 74% at 212 μm grind size.
-
Rapid leach kinetics with extraction largely completed within 8 hours.
-
Low cyanide and moderate lime consumption on all tests.
The test work was carried out on a total of five composite samples from the 2023 Star of Mangaroon RC drilling
program which were selected to represent a range of head grades and locations within the planned open pit (Table 1
and Figure 2). The tests were conducted using Perth tap water (Composite S1) and site water from the Paulsens Gold
Operation (Composites S2-S5). The program was completed by independent metallurgical consultants Strategic
Metallurgy.
Additional metallurgical and geotechnical test work is underway with the recently drilled diamond core.
Table 1: Summary table of the gravity recoverable gold test work.
Composite
ID
S1
S2
S3
S4
S5
Average
Grind
Size
(μm)
212
150
106
75
212
150
106
75
212
150
106
75
212
150
106
75
212
150
106
75
Head
Grade
(g/t)
Gravity
Gold
Recovery
(%)
5.91
55.6
15.5
85.2
6.57
76.0
22.5
84.6
4.59
70.4
11.01 g/t
74.4%
dreadnoughtresources.com.au
Reagent
Consumption
Gold Extraction (%)
4 hrs
8 hrs
24 hrs
48 hrs
87.6
92.3
96.4
97.1
94.0
97.5
98.1
99.0
76.5
92.9
95.6
98.1
90.3
92.0
92.2
93.0
94.5
94.0
95.5
95.6
93.6%
88.9
94.0
96.4
97.1
96.4
98.3
99.3
99.5
78.5
95.3
98.0
98.7
92.7
94.7
94.1
95.0
96.2
95.7
97.1
97.2
95.2%
91.1
95.1
96.4
97.4
97.4
98.3
99.4
99.5
79.1
95.3
98.6
98.7
95.7
97.7
97.5
98.7
97.9
98.3
98.3
98.4
96.4%
91.1
95.1
96.4
97.4
97.4
98.3
99.4
99.5
79.1
96.0
98.6
98.7
96.8
98.9
98.3
98.8
98.2
98.3
98.3
98.4
96.7%
Cyanide
(kg/t)
0.30
0.33
0.34
0.31
0.25
0.15
0.08
0.18
0.53
0.37
0.30
0.58
0.65
0.90
0.66
0.66
0.34
0.33
0.23
0.33
0.39
2
Lime
(kg/t)
1.44
1.33
1.83
2.10
0.21
0.31
0.35
0.43
1.43
1.43
1.26
1.33
1.71
1.67
1.66
1.98
1.50
1.15
1.17
1.27
1.28
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Gravity Recovery
Gravity tests simulated the gravity recovery stage of a conventional milling circuit. Samples were ground using a
laboratory rod mill and the resultant feed was upgraded using a Falcon concentrator. Results showed high gravity
recoveries as shown below.
Gravity recoveries range from 55-85% with an average gravity recovery of 74% using a coarse grind size of 212µm. Recoveries
were highest with the high grade S2 and S4 composites, however all results are well above industry averages and reflect the
high-grade and coarse nature the gold in the deposit.
CIL Leaching
Cyanide leach tests were carried out at four different grind sizes using the gravity tails to characterise the performance at
different grind sizes. Samples were milled and then transferred to a bottle where cyanide and lime were added to achieve the
required pH of 10. The favourable leach extraction and associated reagent consumption results are shown in table below:
Results from all samples show:
-
Excellent overall recoveries;
-
Rapid leach kinetics with extraction largely completed within 8 hours; and
-
Low cyanide and moderate lime consumption.
Figure 2: Long Section through the Star of Mangaroon showing the location of metallurgical samples.
dreadnoughtresources.com.au
3
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
SNAPSHOT – MANGAROON GOLD (100%)
Mangaroon Gold is 100% Owned by Dreadnought
•
Mangaroon covers >5,300km2 with an initial focus on the ~15km x 10km gold system situated over the
Mangaroon Shear Zone between the crustal scale Minga Bar and Edmund Faults with multiple phases of intrusions.
Numerous historical workings along the Mangaroon Shear Zone have only seen limited, shallow drilling along
~200m of strike near the Star of Mangaroon mine.
Self-Funded Explorer Strategy
• Dreadnought’s strategy is to transform into a self-funded explorer. This involves a potential high-grade open pit
at the Star of Mangaroon where we outsource funding, development, haulage & processing to third parties. This
is a common model in WA given the robust gold price. Once successful, extend this model concept to Popeye,
Two Peaks, Lead, Pritchard Well, etc. In this way, we reduce reliance on market funding and generate our own
cashflow aimed at making life changing discoveries.
Consolidation Provides for First Ever Modern Exploration
•
All historical workings and known gold occurrences relate to outcropping mineralisation. There has been minimal
historical and modern exploration due to fractured, small-scale ownership with Dreadnought now undertaking
modern exploration for the first time.
Genuine Camp Scale Potential
•
Five historical mines developed on outcropping mineralisation and dozens of gold occurrences along highly
prospective structural corridors.
Significant, Step-change, Growth Potential
•
Dreadnought is deploying modern geochemical and geophysical techniques to explore for mineralisation under
shallow cover.
•
Initial geochemical and geophysical surveys have generated new prospects with stronger and larger signatures
than the historical mines, including the region’s largest high-grade producer at the Star of Mangaroon mine.
•
Project wide stream sediment sampling and geophysical surveys have identified additional camp scale prospects at
Bordah and High Range.
Shallow, High-grade, Au-Ag Potential
•
•
The Star of Mangaroon deposit contains significant shallow high-grade gold intersections including (ASX: 6 Jun 2023,
4 Sep 2023, 11 Dec 2023, 22 Jan 2024):
MA10: 4m @ 26.0 g/t Au from 9m
MA17: 7m @ 14.3 g/t Au from 21m
SOMRC004: 9m @ 13.4 g/t Au from 9m
SOMRC005: 7m @ 23.0 g/t Au from 53m
SOMRC006: 8m @ 15.5 g/t Au from 89m
SOMDD001: 1.4m @ 87.9 g/t Au from 16m
Popeye, located <1km from the Star of Mangaroon, contains significant shallow high-grade gold intersections
including:
POPRC001: 3m @ 22.8 g/t Au from 13m
•
POPRC002: 1m @ 1.6 g/t Au, 15.5g/t Ag from 11m
Rock chip results from regional prospects and historical workings include:
MNRK0515: 74.8 g/t Au (Diamond)
dreadnoughtresources.com.au
TPRK05: 41.7 g/t Au (Two Peaks)
4
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Background on Mangaroon (E8/3178, E08/3229, E08/3274, , E08/3275, E08/3439, E09/2290, E09/2359, E09/2370,
E09/2384, E09/2405, E09/2422, E09/2433, E09/2448, E09/2449, E09/2450, E09/2467, E09/2473, E09/2478, E09/2535,
E09/2616, M09/91, M09/146, M09/147, M09/174, M09/175: 100%)
Mangaroon (Figure 5) covers >5,300kms2 of the Mangaroon Zone in the Gascoyne Region of Western Australia and
is comprised of:
-
>45km long Money Intrusion (Ni-Cu-Co-PGE): containing high tenor magmatic Ni-Cu-Co-PGE.
-
~10km x 15km Mangaroon Gold Camp (Au, Cu-Zn-Ag-Au): where fractured, small-scale ownership has
limited previous gold exploration with only ~200m of the >12km long Mangaroon Shear Zone having been
drilled.
-
~43km long Yin Ironstone (REE): which already contains: an independent Resource of 20.06Mt @ 1.03%
TREO (ASX 5 Jul 2023) over only ~4km of the ~43km of ironstones including an initial Indicated Resource of
5.52Mt @ 1.23% TREO over only ~250m of strike (ASX 5 Jul 2023).
-
~17km long Gifford Creek Carbonatites (REE-Nb-Ti-P-Sc): which contains a suite of critical minerals and an
initial independent Inferred Resource of 10.84Mt @ 1.00% TREO at C3 (ASX 28 Aug 2023).
Figure 3: Plan view map of Dreadnought’s 100% owned Mangaroon projects: the >45km long Money Intrusion (Ni-Cu-CoPGE); the ~10km x 15km Mangaroon gold camp (Cu-Zn-Ag-Au); Yin Ironstone Complex (REE) and the Gifford Creek
Carbonatites (REE-Nb-Ti-P-Sc) in relation to major structures, geology and roads.
dreadnoughtresources.com.au
5
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
For further information please refer to previous ASX announcements:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
25 November 2020
15 March 2021
7 April 2021
17 May 2021
12 September 2022
7 June 2023
4 September 2023
1 November 2023
11 December 2023
22 January 2024
12 February 2024
13 March 2024
26 July 2024
26 July 2024
1 October 2024
Mangaroon Ni-Cu-PGE & Au Project
Exploration Commences at Mangaroon Ni-Cu-PGE & Au Project
Option/JV Agreement Signed with Global Base Metal Miner
Update on Mangaroon Ni-Cu-PGE & Au Project
Star of Mangaroon Acquisition & Consolidation
Mangaroon Gold Review and Further Consolidation
Outstanding Gold Opportunities Along >10km Mangaroon Shear Zone
Gold Drilling Commenced at Star of Mangaroon
Thick, High-Grade Gold Including 7m @ 23.0g/t Au
Star of Mangaroon Extended
Star of Mangaroon Camp Scale Prospect Continues to Expand
Star of Mangaroon Camp Scale Gold Prospect Expands to ~15km x 10km
Strategic & Prospective Consolidation
Consolidation, Growth & Commercialisation
Shallow, High-Grades at Star of Mangaroon & Popeye
UPCOMING NEWSFLOW
October: Results of further target generation and definition work at Mangaroon Au (100%)
October: Results from EIS co-funded IP surveys at Tarraji-Yampi (80%/100%)
October/November: Results from Au and Cu-Au-Zn-Ag drilling at Mangaroon (100%)
October/November: Results from airborne geophysical surveys at Mangaroon (100%)
October/November: Results from diamond drilling at the Star of Mangaroon (100%)
November: Initial Mineral Resource for Star of Mangaroon (100%)
October: Quarterly Activities and Cashflow Report
28 November: Annual General Meeting
~Ends~
For further information please contact:
Dean Tuck
Managing Director
Dreadnought Resources Limited
E: dtuck@dreres.com.au
Jessamyn Lyons
Company Secretary
Dreadnought Resources Limited
E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
dreadnoughtresources.com.au
6
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forwardlooking information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and
uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. There are a number of
risks, both specific to Dreadnought, and of a general nature which may affect the future operating and financial performance of Dreadnought,
and the value of an investment in Dreadnought including and not limited to title risk, renewal risk, economic conditions, stock market
fluctuations, commodity demand and price movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks,
operational risks, reliance on key personnel, reserve estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and
mining development, construction and commissioning risk.
Competent Person’s Statement – Exploration Results and Exploration Targets
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled by Mr.
Dean Tuck, who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'.
Mr. Tuck consents to the inclusion in the announcement of the matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports, and
that the forma and context in which the Competent Person’s findings are presented have not been materially modified from the original
reports.
Competent Person’s Statement – Metallurgical Results
The information in this report that relates to metallurgy and the processing response is based on and fairly represents information compiled
or reviewed by Mr Nick Vines. Mr Vines is a full-time employee of Strategic Metallurgy Pty Ltd. Mr Vines has confirmed that he has read and
understood the requirements of the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves. Mr Vines is a Competent Person as defined by the JORC Code 2012 Edition, having more than five years' experience which is
relevant to the processing method and type of deposit under consideration and to the activity for which he is accepting responsibility. Mr Vines
is a Member of the AusIMM and consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports, and
that the forma and context in which the Competent Person’s findings are presented have not been materially modified from the original
reports.
dreadnoughtresources.com.au
7
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
INVESTMENT HIGHLIGHTS
Mangaroon Au, Nb-REE, Ni-Cu-PGE Project (100%)
Mangaroon covers ~5,300kms2 and is located 250kms
south-east of Exmouth in the Gascoyne Region of WA.
At Mangaroon, Dreadnought has consolidated areas of
outcropping high-grade gold and historical high grade
gold mines including the historic Star of Mangaroon and
Diamond gold mines. Exploration at the Money Intrusion
has identified high tenor Ni-Cu-PGE sulphides. In
addition, Mangaroon has emerged as a globally
significant, rapidly growing, potential source of critical
minerals. Highlights include:
•
An independent Resource for Yin Ironstones
Complex of 29.98Mt @ 1.04% TREO over only
~4.6kms – including a Measured and Indicated
Resource of 26.3Mt @ 1.04% TREO (ASX 30 Nov
2023).
•
Discovery of the globally significant, Nb-REE-P-TiSc enriched Gifford Creek Carbonatite (ASX 7 Aug
2023).
•
A large, independent initial Resource of 10.84Mt @
1.00% TREO at the Gifford Creek Carbonatites,
containing a range of critical minerals including rare
earths, niobium, phosphate, titanium and scandium
(ASX 28 Aug 2023).
Kimberley Ni-Cu-Au Project (80/100%)
The project is located only 85kms from Derby in the
West Kimberley region of WA and was locked up as a Defence Reserve since 1978.
The project has outcropping mineralisation and historical workings which have seen no modern exploration.
Results to date indicate that there may be a related, large scale, Proterozoic Cu-Au VMS system at Tarraji-Yampi,
similar to DeGrussa and Monty in the Bryah Basin.
Central Yilgarn Gold, Base Metals, Critical Minerals & Iron Ore Project (100%)
Central Yilgarn is located ~190km northwest of Kalgoorlie in the Yilgarn Craton. The project comprises ~1,400kms2
covering ~150km of strike along the majority of the Illaara, Yerilgee, South Elvire and Evanston greenstone belts.
Central Yilgarn is prospective for typical Archean mesothermal lode gold deposits, VMS base metals, komatiitehosted nickel sulphides and critical metals including Lithium-Cesium-Tantalum.
Prior to consolidation by Dreadnought, the Central Yilgarn was predominantly held by iron ore explorers and
remains highly prospective for iron ore.
Bresnahan HREE-Au-U Project (100%)
Bresnahan is located ~125km southwest of Newman in the Ashburton Basin. The project comprises ~3,700kms2
covering over 200kms strike along the Bresnahan Basin / Wyloo Group unconformity. Bresnahan is prospective for
unconformity related heavy rare earth (“HREE”) deposits similar to Browns Range HREE deposits, unconformity
uranium (“U”) deposits and mesothermal lode gold similar to Paulsens Au-Ag-Sb deposits along strike.
Prior to consolidation by Dreadnought, the Bresnahan Basin had been successfully explored for unconformity
uranium with limited exploration for mesothermal gold. Bresnahan is a first mover opportunity to explore for
unconformity HREE.
dreadnoughtresources.com.au
8
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Table 2: Significant Intersections >0.3g/t Au with >10g/t Au highlighted.
Hole ID
SOMRC004
incl
SOMRC005
incl
SOMRC006
incl
SOMRC007
SOMRC008
Hole ID
SOMRC004
SOMRC005
SOMRC006
SOMRC007
SOMRC008
Easting
372324
372362
372403
372332
372376
From (m)
To (m)
9
16
53
54
89
90
19
68
18
18
60
57
97
93
20
70
Interval
(m)
9
2
7
3
8
3
1
2
Au (g/t)
Prospect
13.4
59.4
23.0
48.9
15.5
30.4
4.0
4.8
Star of Mangaroon
Table 3: Drill Collar Data (GDA94 MGAz50)
Northing
RL
Dip Azimuth EOH
7359784
284
-60
274
36
7359779
284
-61
274
84
7359783
283
-61
272
114
7359823
284
-59
272
42
7359824
284
-58
273
90
Type
RC
RC
RC
RC
RC
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling techniques
JORC Code explanation
•
•
•
•
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
Commentary
Reverse Circulation (RC) and Diamond (DD) drilling was
undertaken to produce samples for assaying.
RC Drilling
Two sampling techniques were utilised for the RC drilling, 1m
metre splits directly from the rig sampling system for each
metre and 3m composite sampling from spoil piles. Samples
submitted to the laboratory were determined by the site
geologist.
1m Splits
From every metre drilled a 2-3kg sample (split) was subsampled into a calico bag via a Metzke cone splitter from each
metre of drilling.
3m Composites
All remaining spoil from the sampling system was collected in
buckets from the sampling system and neatly deposited in
rows adjacent to the rig. An aluminium scoop was used to
then sub-sample each spoil pile to create a 2-3kg 3m
composite sample in a calico bag.
A pXRF is used on site to help determine mineralised samples.
Mineralised intervals have the 1m split collected, while
unmineralised samples have 3m composites collected.
Select samples are also submitted for 48 multi-elements via 4
acid digestion with MS/ICP finish (ALS Code ME-MS61) to
assist with lithological interpretation.
QAQC samples consisting of duplicates, blanks and CRM’s
(OREAS Standards) are inserted through the program at a
rate of 1:50 samples.
Metallurgical Composites
Primary B bags (~2-3kgs each) that were not used for
duplicate analysis were combined to create the Composite
samples for metallurgical test work.
Once samples were composited, each sample was stage
crushed to <3.35mm, homogenized and split via a rotary
sample divider to create 1kg test charges.
Head samples were splut from one of the test charges for
head assays with each sample beign submitted 2-4 times for
dreadnoughtresources.com.au
9
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Criteria
JORC Code explanation
Commentary
Drilling techniques
•
RC Drilling
Drill sample recovery
•
•
•
Logging
•
•
•
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
gold analysis
spectrometry.
vis
fire
assay
and
atomic
absorption
The first 3 drill holes were completed by Ausdrill utilising a
Drill Rigs Australia truck mounted Schramm T685WS drill rig
with additional air from an auxiliary compressor and booster.
Bit size was 5¾“.
The remaining drill holes were completed by Topdrill utilising
a Schramm T685WS drill rig with additional air from an
auxiliary compressor and booster. Bit size was 5½ ”.
RC Drilling
Drilling was undertaken using a ‘best practice’ approach to
achieve maximum sample recovery and quality through the
mineralised zones.
Best practice sampling procedure included: suitable usage of
dust suppression, suitable shroud, lifting off bottom between
each metre, cleaning of sampling equipment, ensuring a dry
sample and suitable supervision by the supervising geologist
to ensure good sample quality.
RC Drilling
RC chips were logged under the supervision of a Senior
Geologist with sufficient experience in this geological terrane
and relevant styles of mineralisation using an industry standard
logging system which could eventually be utilised within a
Mineral Resource Estimation.
Lithology, mineralisation, alteration, veining, weathering and
texture were all recorded digitally.
Chips were washed each metre and stored in chip trays for
preservation and future reference.
RC pulp material is also analysed on the rig by pXRF, and
magnetic susceptibility meter to assist with logging and the
identification of mineralisation.
RC logging is qualitative, quantitative or semi-quantitative in
nature.
Sub-sampling
techniques and sample
preparation
•
•
•
•
•
•
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
RC Drilling
From every metre drilled, a 2-3kg sample (split) was subsampled into a calico bag via a Metzke cone splitter.
QAQC in the form of duplicates and CRM’s (OREAS
Standards) were inserted through the ore zones at a rate of
1:50 samples. Additionally, within mineralised zones, a
duplicate sample was taken and a blank inserted directly after.
2-3kg samples are submitted to ALS laboratories (Perth),
oven dried to 105°C and crushed to >90% passing 3mm to
produce a 500g charge for determination of gold PhotonAssay
from crushed sample (ALS Method Au-PA01).
Additional material is then pulverised to 85% passing 75 μm
to produce a 0.25g charge for determination of 48 multielements via 4 acid digestion with MS/ICP finish (ALS Code
ME-MS61).
Standard laboratory QAQC is undertaken and monitored.
Quality of assay data
and laboratory tests
•
•
•
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
dreadnoughtresources.com.au
Laboratory Analysis
PhotonAssay is considered a total analysis and Method AuPA01 is appropriate for Au determination. ME-MS61 is
considered a near total digest and is appropriate for
pathfinder determination.
Standard laboratory QAQC is undertaken and monitored by
the laboratory and by the company upon assay result receival.
10
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Criteria
Verification of sampling
and assaying
JORC Code explanation
•
•
•
•
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Commentary
Logging and Sampling
Logging and sampling were recorded directly into a digital
logging system, verified and eventually stored in an offsite
database.
Significant intersections are inspected by senior company
personnel.
2 historical RC holes have been diamond twinned and 1 RC
twinned to compare and validate historical RC drilling.
No adjustments to any assay data have been undertaken.
Location of data points
•
•
•
Data spacing and
distribution
Orientation of data in
relation to geological
structure
•
•
•
•
•
Sample security
•
Audits or reviews
•
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised st
Share your feedback
Discover