ASX ANNOUNCEMENT 28 January 2025
Robust Scoping Study for Star of Mangaroon - Mangaroon Au (100%)
HIGHLIGHTS (all amounts are in A$ unless otherwise stated)
•
Initial production target of ~20koz @ 10g/t Au. The Star of Mangaroon remains open along
strike and at depth. As such, the initial production target is subject to expansion from
extensional drilling.
•
Ore processing agreement (non-binding) in place with Black Cat Syndicate Ltd. (“Black
Cat”) to process Star of Mangaroon material at the Paulsens processing facility.
•
Robust financials at $4,100oz include:
•
o
Maximum cash drawdown of ~$10.2M
o
All-in Sustaining Cost (“AISC”) of $1,800/oz
o
Operating Cashflow after all Capital and Tax (“Operating Cashflow”) of
~$40.1M
o
87% Indicated Resource
Detailed mine studies are well advanced, with approvals and early contractor engagement
underway for potential commencement in 2025.
Dreadnought Resources Limited (“Dreadnought”) is pleased to announce a scoping study for
an initial open pit at Star of Mangaroon, part of the 100% owned Mangaroon Gold Project,
located in the Gascoyne region of Western Australia.
Dreadnought’s Managing Director, Dean Tuck, commented: “The initial scoping study for Star of Mangaroon
highlights the opportunity that the high grade, near surface mineralisation at the Star of Mangaroon presents and
forms the foundation of our strategy to become a self-funded explorer.
With the scoping study delivered, Dreadnought will seek to advance discussions with third parties to outsource funding,
development, haulage & processing to generate cashflow. The cashflow from this operation would present a major
milestone for Dreadnought and our shareholders as the proceeds could be used to fund future exploration and
potentially return capital to our shareholders.
The favourable outcome of the initial scoping study justified completing the required baseline studies to progress
approvals ahead of potential open pit mining. With gold prices continuing to climb, there could be no better time to
bring a high-grade gold asset into production.
In parallel with our efforts to get the Star of Mangaroon into production this year, we will aggressively pursue
opportunities to add resource ounces on our five granted mining leases with an aim to extend production and
operations. We see potential to extend the Star of Mangaroon along strike and at depth, as well as following up high
grade near surface intercepts at Popeye and undertake targeted drilling at Pritchard’s, the Lead Gold Mine and Two
Peaks. These existing mining leases provide short term pathways to extending operations.
For the medium and long term, our team will continue the low cost, high impact target generation and definition work
at our Bordah and High Range camp scale prospects with the aim of delivering a major gold discovery.
We believe that Dreadnought is now well positioned to take advantage of its gold opportunities while still providing
significant leverage and optionality for our shareholders with our critical metal and base metal assets also at
Mangaroon. We look forward to 2025 and delivering on our self-funded explorer strategy.”
ASX:DRE
Dreadnought Resources Ltd 1
Cautionary Statement – Scoping Study
The January 2025 Scoping Study (“the Study”) has been prepared to ascertain whether a business case can be made before
proceeding with more definitive studies of Star of Mangaroon’s viability. The Study is a preliminary technical and economic
assessment of the potential viability of Star of Mangaroon.
The Study is based on low level technical and economic assessments that are not yet sufficient to support the estimation of
Ore Reserves. Further exploration and evaluation work and appropriate studies may be required before any estimate of Ore
Reserves or to provide any assurance of an economic development case.
The Study includes a production target comprising Indicated (87%) and Inferred Resources (13%). Investors are cautioned
that there is a low level of geological confidence in Inferred Resources and there is no certainty that further drilling will result
in the determination of Measured or Indicated Resources, or that a production target will be realised.
The Study is based on the material assumptions outlined in this announcement including assumptions about the availability
of funding. While Dreadnought considers all the material assumptions to be based on reasonable grounds, there is no
certainty that they will prove to be correct or that the range of outcomes indicated by the Study will be achieved.
To achieve the range of outcomes indicated in the Study, funding in the order of $10.2M (maximum cash drawdown) will
likely be required. Investors should note that there is no certainty that Dreadnought will be able to raise that amount of
funding when needed. It is also possible that such funding may only be available on terms that may be dilutive to or otherwise
affect the value of Dreadnought’s existing shares.
It is also possible that Dreadnought could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint
venture of Star of Mangaroon or its other projects. If it does, this could materially reduce Dreadnought’s proportionate
ownership of the relevant project(s).
Given the uncertainties involved, investors should not make any investment decisions based solely on the results of the Study.
This announcement has been prepared in compliance with the JORC Code 2012 Edition (“JORC”) and the ASX Listing
Rules. All material assumptions, on which the forecast financial information is based, have been included in this
announcement and are also outlined in the attached JORC Table disclosures.
Overview
Main activities include the following outsourced activities:
•
•
•
•
installation of a mobile mining camp proximal to the Star of Mangaroon;
initial contract development of an open pit (12 months);
contract haulage for 330kms; and
processing at Black Cat’s Paulsens processing facility.
Physical & Financial Summary
The Study demonstrates a robust economic case, mining an initial ~20koz, which generates an Operating
Cashflow of ~$40.1M (@ $4,100/oz) over one year at an AISC of $1,800/oz.
Current market conditions have been factored into the Study costs and show that Star of Mangaroon is
expected to be highly competitive alongside other active WA gold operations.
A gold price of $4,100/oz has been used in the Study. The gold sector is strong with the average spot price
since October 2024 consistently above $4,100/oz. Indicative forward market prices available are at
~$4,600oz.1
1
Average gold forward sales price based on a $4,390/oz spot price and assumes commencing delivery date of January 2026 for 12 months. The
forward prices have been provided by an independent source (a large Australian bank) with inputs used being the prevailing data as of 23 January
2025. The quoted price of $4,600/oz has been rounded down to the nearest $10.
ASX:DRE
Dreadnought Resources Ltd 2
Table 1: Star of Mangaroon Physicals Summary
Project Physicals
Units
Total
Duration
Mined Ore
Grade
Gold in Ore
Recovery
Gold Recovered
Months
kt
g/t Au
koz
%
koz
12
62.1
10.0
19.9
98
19.5
Project Financials
Units
Total
Gold Price
Revenue
Capital Costs
Pre-Production Infrastructure
Pre-Production Development
Rehabilitation
Operating Costs
Mining
Ore Haulage and Processing
Royalties
Operating Cashflow (after all Capital and Tax)
AISC
$/oz
$M
4,100
80.1
$M
$M
$M
1.7
1.2
1.8
$M
$M
$M
$M
$/oz
25.5
6.7
3.0
40.1
1,800
Table 2: Star of Mangaroon Financial Summary
Investors are advised the Study is a preliminary economic assessment based on assumptions outlined in this
document and a range of financial outcomes are possible: +/-10% variance from the base case is shown below.
Operating Cashflow Sensitivity
Gold Price
Capex
Opex
$32
$34
$36
$38
$40
-10%
$42
$44
$46
$48
10%
Figure 1: Sensitivity of project variables.
A gold price movement of $100/oz changes Operating Cashflow by ~$1.9M as shown in the price range below:
Table 3: Sensitivity to $100/oz gold price increments
ASX:DRE
Gold Price $/oz
Operating Cashflow ($M)
$3,600
$3,700
$3,800
$3,900
$4,000
$4,100 (base case)
$4,200
$4,300
$4.400 (~spot)
$4,500
$4,600 (~forward)
$30.7
$32.6
$34.5
$36.4
$38.2
$40.1
$42.0
$43.9
$45.8
$47.6
$49.5
Dreadnought Resources Ltd 3
Opportunities
There are extensive opportunities to build on the Study including:
•
Potentially proving up additional Resources on existing mining leases, these include Popeye, Star of
Mangaroon extensions, Two Peaks, Lead Gold Mine and Pritchard’s.
•
Potential for gold recovery from an existing heap leach located on the Star of Mangaroon mining lease and
within the limits of the pit design.
•
Spare capacity within the mining fleet may be utilised for additional mining within the operational period.
•
Use of forwards increases the Study Operating Cashflow to ~$50M.
Existing Mining Leases
There are currently 5 granted mining leases within the area covering historical mines and include the Star of
Mangaroon, Lead Gold Mine, Two Peaks and Pritchard’s. Proving up additional Resources on the existing mining
leases could extend production with minimal additional approvals.
In addition, there is potential to extend the Star of Mangaroon along strike and at depth. Immediate follow up
targets from initial drilling include Popeye which intersected 3m @ 22.8 g/t Au from 13m (POPRC001).
Drilling on the existing mining leases will be priority work commencing in early 2025.
Figure 2: Long Section from Popeye through the Star of Mangaroon showing the location of historic and recent drilling
highlighting the lack of drilling along strike and at depth at the Star of Mangaroon.
ASX:DRE
Dreadnought Resources Ltd 4
Heap leach
There is a historic heap leach (~30m x 35m x 2m) located within the open pit. Grab samples of 10g/t Au have
been recorded from the heap leach. Systematic full-depth sampling of the heap leach may result in additional
economic material.
Figure 3: Location of heap leach within the pit design.
ASX:DRE
Dreadnought Resources Ltd 5
Camp Scale Prospects
Dreadnought has identified three camp scale prospects with the potential to deliver additional discoveries. These
include Bordah, High Range and additional targets around the Star of Mangaroon. Any significant discovery could
provide material to extend operations.
Target generation and definition work is ongoing to deliver targets for drilling in the second half of 2025.
Figure 4: Plan view image of a portion of Mangaroon highlighting the main gold and base metal camp scale prospects
which are the focus of ongoing target generation and definition work.
ASX:DRE
Dreadnought Resources Ltd 6
Excavator Utilisation
The mining schedule is driven by excavator hours, which are capped at a conservative 350 hours in the first month
of mining, and 450 hours per month thereafter. The mining schedule is also constrained by applying a maximum
vertical rate of descent of 15m, equivalent to 3x5m benches.
A total of 3,069 excavator hours are utilised in the mining schedule.
A total of 891 available excavator hours are available but not utilised during the final 5 months of mining.
Additional mining opportunities at Mangaroon could utilise these available hours and potentially further improve
cost metrics.
Excavator Hours Available
Excavator Utilisation
500
400
300
200
100
0
1
2
3
4
5
6
7
8
9
10
11
12
Month
Excavator Hours Utilised
Unutilised Excavator Hours
Figure 5: Star of Mangaroon fixed costs and excavator utilisation
•
Use of forwards increases the Study Operating Cashflow to ~$50M.
Figure 6: Photo of the historical infrastructure at the Star of Mangaroon.
ASX:DRE
Dreadnought Resources Ltd 7
JORC Code 2012 and ASX Listing Rules
This announcement has been prepared in accordance with JORC and ASX Listing Rules. Investors are referred to
several important statements in relation to this announcement and the Study contained herein including the
Cautionary Statement; Forward Looking Statements; Sensitivity Analysis; and Competent Persons’ Statements.
Cautionary Statement (In Accordance with Clause 38 of JORC)
Margin for Error: The Study documented in this announcement has a +/-30% Scoping Study level of accuracy.
Assumptions: The Study is based on the material assumptions outlined in this announcement. While Dreadnought
considers all the material assumptions to be based on reasonable grounds, there is no certainty that they will prove
to be correct or that the range of outcomes indicated by the Study will be achieved.
Inferred Resources: The Study includes a production target comprising Indicated (87%) and Inferred Resources
(13%). Investors are cautioned that there is a low level of geological confidence in Inferred Resources and there is
no certainty that further drilling will result in the determination of Measured or Indicated Resources or that a
production target will be realised.
Further Work Required: The Study has been undertaken to determine the potential viability of open pit mining
at Star of Mangaroon. Scoping studies are preliminary technical and economic assessments of the potential viability
of mining and are based on low level technical assessments that are not yet sufficient to support the estimation of
Ore Reserves. Further exploration and evaluation work and appropriate studies may be required before the
estimation of Ore Reserves or to provide any assurance of an economic development case.
Value Realisation: Dreadnought could pursue other ‘value realisation’ strategies such as a sale, partial sale or
joint venture of Star of Mangaroon. If it does, this could materially reduce Dreadnought’s proportionate ownership
of the relevant project(s).
Uncertainty: Given the uncertainties involved, investors should not make any investment decision based solely
on the results of the Study.
Economic Viability: Dreadnought considers the deposits subject to the Study to be economically viable based
on a gold price of $4,100/oz.
Funding: To achieve the range of outcomes indicated in the Study, funding of ~$10.2M (maximum cash drawdown)
will be required to commence initial production. This funding is assumed. Investors should note that there is no
certainty that Dreadnought will be able to generate or raise that amount of funding when needed. It is also possible
that such funding may only be available on terms that may be dilutive to or otherwise affect the value of
Dreadnought’s existing shares.
The Company believes that it is reasonable to assume there will be available funding to commence Star of
Mangaroon because:
-
These are strong technical and economic fundamentals which provide an attractive return on capital
investment and generate a robust cashflow at a range of gold prices below current market levels. This
provides a strong platform to attract both debt and equity investment.
-
The board and management of have a strong track record of raising equity funding as required to further
exploration and evaluation of the Mangaroon Gold Project
-
The board and management have strong experience in project funding mine development with a mixture
of debt and equity.
-
The project is in a stable geopolitical environment with established infrastructure and regulations. Details
of the Study follow.
ASX:DRE
Dreadnought Resources Ltd 8
STAR OF
MANGAROON
SCOPING STUDY
January 2025
ASX:DRE
Dreadnought Resources Ltd 9
1.
INTRODUCTION
Dreadnought owns 100% of ~5,300km2 of highly prospective ground at Mangaroon located ~250km south-east of
Exmouth in the Gascoyne Region of WA and is accessed by the Towera, Lyndon and Ullawarra Roads.
Part of the area is comprised of the ~10km x 15km Mangaroon Gold Camp (Au, Cu-Zn-Ag-Au): where fractured,
small-scale ownership has limited previous gold exploration with only ~200m of the >12km long Mangaroon Shear
Zone having been drilled. This area is a focus for Dreadnought.
The Star of Mangaroon, located within the Mangaroon Gold Camp, was mined between 1960 and 1983 and produced
a total of 7,464 oz @ 34.8 g/t Au.
Dreadnought’s objective is to commence open pit mining at Star of Mangaroon in 2025 and process material at Black
Cat’s Paulsens processing facility. Ongoing exploration is expected to prove up further gold in the region for future
mining.
Figure 1: Star of Mangaroon location relative to Paulsens processing facility.
Star of Mangaroon Scoping Study January 2025
dreadnoughtresources.com.au
Dreadnought Resources Ltd 1
2.
STUDY PARAMETERS
The Study is based on the following outsourced activities:
3.
•
Constructing a mobile camp proximal to the mine;
•
Clearing vegetation and removal of topsoil prior to mining;
•
Contractor open pit mining for 12 months;
•
Contract haulage; and
•
Processing at Black Cat’s Paulsen processing facility; and
•
Contractor demobilisation at the completion of mining.
STUDY TEAM
The following consultants contributed to the Study.
Table 1: Consultant contributions to the Study
Study Area
Consultant
Fauna & Flora
Onshore Environmental
Geotechnical
Peter O’Bryan & Associates
Metallurgy
Strategic Metallurgy
Mineral Resource
Payne Geological Services
Mining and Processing
Black Cat
4.
Scope
•
Desktop flora, vegetation & fauna
assessment (2021)
•
Reconnaissance flora and vertebrate fauna
survey (2021)
•
Targeted flora survey & vegetation type
mapping (2022, 2023)
•
Fauna survey (2023)
•
Pit wall stability assessment (2024)
•
Gravity and cyanide leachable recovery of
5x diamond core composite samples
(2024)
•
Validation of exploration drilling data
•
Interpretation and modelling of all
geological domains and structures
•
Generation of a Resource model (2024)
•
Early contractor engagement
•
Open pit optimisation, mine design and
scheduling
•
Capital cost estimation
•
Financial modelling
PERMITS & APPROVALS
Star of Mangaroon has low approval barriers being located on approved and developed mining lease (M09/175) and
is accessible via miscellaneous lease L09/114.
Baseline environmental studies required to support a Mining Proposal submission are underway and are expected to
be completed in early 2025 as detailed below.
Table 2: Studies pending
Study Area
Consultant
Scope
Fauna & Flora
Onshore Environmental
•
Geotechnical
Peter O’Bryan & Associates
Hydrology/ hydrogeology
Pennington Scott
Soil Characterisation
Botanica Consulting
Waste Rock Characterisation
Botanica Consulting
Star of Mangaroon Scoping Study January 2025
dreadnoughtresources.com.au
•
•
•
•
•
•
•
Targeted fauna survey
Waste dump final slope stability assessment
Abandonment bund position
Groundwater to support operations
Flooding assessment
Soil reclamation strategy
Waste dump final slope stability assessment
Acid mine drainage & rehabilitation
Dreadnought Resources Ltd 2
5.
GEOLOGY & MINERALISATION
The Star of Mangaroon lies within the Proterozoic Gascoyne Province, in a zone of highly strained NW trending
paragneiss and paraschistose metamorphic rocks whose protolith were either sedimentary or felsic volcanic rocks.
The gneiss outcropping at Star of Mangaroon is a laminated sugary quartz micaceous (biotite) rock which has
undergone upper amphibolite to granulite facies regional metamorphism.
The principal gold-bearing horizon consists of an anastomosing quartz vein with a strike of ~10° dipping to the east
at ~65°. The gold-bearing vein system is about 150m long and 2-4m wide, hosted in a NS trending foliation. The
mineralisation in the northern portion appears to change to a more stockwork type of disseminated gold, and changes
to a more NW trending direction as it becomes sub-parallel to the WNW-ESE trending regional structural. Based
on analysis of hand specimens and historical mineralogy reports, the mineralisation at Star of Mangaroon is hosted in
crystallised quartz vein, consisting of a quartz-muscovite-pyrrhotite-chalcopyrite-arsenopyrite gold assemblage.
Geochemical pathfinders for the gold mineralisation observable in orientation soil surveys and whole rock
geochemistry include Te, Sb, Bi, & As, as well as elevated Ag, Cu, and Pb.
5.1
Resource Model
The November 2024 Resource model was used for the Study. The Resource is 84% Indicated.
Table 3: Star of Mangaroon November 2024 Resource
Indicated
Type
Au
Tonnes Au (g/t)
Tonnes
(Oz)
Transition
1,900
26.9
1,670
Fresh
42,500
13.0
17,800
12,200
Total
44,500
13.6
19,500
12,200
6.
Inferred
Au (g/t)
9.8
9.8
Total
Au
(Oz)
3,900
3,900
Tonnes
Au (g/t)
1,900
54,800
56,700
26.9
12.3
12.8
Au
(Oz)
1,700
21,700
23,300
GEOTECHNICAL PARAMETERS
Recommendations for wall design were based on information from geotechnical logging of two geotechnical diamond
drill holes (SOMDD007, SOMDD009) and an additional six diamond drill holes (SOMDD001 – SOMDD006) from
within the open pit. The base case wall design parameters are as follows:
Table 4: Open pit wall design parameters
North & West
Parameter
Walls
Face Height (m)
10
Face Height (m)
20
Face Height (m)
30
Face Angle (°)
55
Face Angle (°)
60
Face Angle (°)
75
Face Angle (°)
75
Berm Width (m)
5
Berm Width (m)
7
7.
South & East
Walls
10
20
30
50
55
60
75
5
7
Upper Limit
(mRL)
Surface
275
275
Surface
275
255
235
275
255
Lower Limit
(mRL)
275
235
Base of pit
275
255
235
Base of pit
275
Base of pit
HYDROLOGY AND HYDROGEOLOGY
The region comprises low undulating hilly country with stony and hardpan wash plains. Minor local drainage channels
intersect the area which are subject to seasonal flow. Natural groundwater level in the region is 20-30m below surface.
Groundwater is fresh to brackish, ranging from 1,000-5,000ppm TDS.
Groundwater inflow rates below the water table are expected to be minimal (<2.5L/sec). This is interpreted from
water return from drilling and an assessment of data from existing bores within a 5km radius of Star of Mangaroon.
To manage flooding, all landforms and work areas have been designed away from watercourses.
Star of Mangaroon Scoping Study January 2025
dreadnoughtresources.com.au
Dreadnought Resources Ltd 3
8.
METALLURGICAL TEST WORK
Metallurgical test work comprised conventional gravity and carbon-in-leach gold recovery at a range of grind sizes
and used site water from Black Cat Paulsens Gold Operation in four of the five tests2.
Composite samples from the 2023 Star of Mangaroon RC drilling program (SOMRC004-SOMRC008) were selected
to represent a range of head grades and locations within the mineralised lode and inside the open pit.
Gravity tests were carried out to simulate a gravity recovery stage as part of a conventional milling circuit. To
approximate this, the sample was stage ground to 212µm using a laboratory rod mill and the product was upgraded
using a Falcon Concentrator. The concentrate was then leached and the solution analysed for gold content. The
gravity tailings were then homogenised with the bulk sample before cyanidation test work.
Cyanide leach tests were carried out at P80 grind sizes of 212µm, 150µm, 106µm, 75µm. Milled samples were
transferred to a bottle where cyanide and lime were added to achieve the required pH of 10.
The combined gravity and leach extractions and associated reagent consumptions are shown in Table 5.
Table 5: Gravity and leach test results for composites S1 – S5
Comp.
ID
S1
S2
S3
S4
S5
Average
Grind
Size
(μm)
212
150
106
75
212
150
106
75
212
150
106
75
212
150
106
75
212
150
106
75
Head
Grade
(g/t)
Gravity
Gold
Recovery
(%)
5.91
55.6
15.5
85.2
6.57
76.0
22.5
84.6
4.59
70.4
11.01
74.4
Gold Extraction (%)
4 hrs
8 hrs
24 hrs
48 hrs
87.6
92.3
96.4
97.1
94.0
97.5
98.1
99.0
76.5
92.9
95.6
98.1
90.3
92.0
92.2
93.0
94.5
94.0
95.5
95.6
93.6
88.9
94.0
96.4
97.1
96.4
98.3
99.3
99.5
78.5
95.3
98.0
98.7
92.7
94.7
94.1
95.0
96.2
95.7
97.1
97.2
95.2
91.1
95.1
96.4
97.4
97.4
98.3
99.4
99.5
79.1
95.3
98.6
98.7
95.7
97.7
97.5
98.7
97.9
98.3
98.3
98.4
96.4
91.1
95.1
96.4
97.4
97.4
98.3
99.4
99.5
79.1
96.0
98.6
98.7
96.8
98.9
98.3
98.8
98.2
98.3
98.3
98.4
96.7
Tails
Grade
(g/t)
0.53
0.29
0.21
0.15
0.40
0.26
0.09
0.08
1.37
0.26
0.09
0.09
0.72
0.25
0.38
0.27
0.08
0.08
0.08
0.07
Reagent
Consumption
NaCN
Lime
(kg/t)
(kg/t)
0.30
1.44
0.33
1.33
0.34
1.83
0.31
2.10
0.25
0.21
0.15
0.31
0.08
0.35
0.18
0.43
0.53
1.43
0.37
1.43
0.30
1.26
0.58
1.33
0.65
1.71
0.90
1.67
0.66
1.66
0.66
1.98
0.34
1.50
0.33
1.15
0.23
1.17
0.33
1.27
0.39
1.28
Gravity recoveries range from 55-85% with an average gravity recovery of 74% using a coarse grind size of 212µm.
The highest recoveries were recorded in composites S2 and S4, however all results are well above industry averages
and reflect the high-grade (coarse gold) nature of these samples.
A metallurgical recovery of 98% was selected for the Study. This is based on the average metallurgical recovery of the
75-106µm test work with estimated processing gold solution and carbon attrition losses.
Table 6: Summary table of metallurgical recovery and reagent usage
Composite ID
S1
S2
S3
S4
S5
Average
Estimated Solution and Carbon Attrition Losses
Gold Recovery (incl. solution and carbon losses)
2
106µm 24hr Recovery
96.4%
99.4%
98.6%
98.3%
98.3%
98.2%
0.02g/t
98.0%
75µm 24hr Recovery
97.4%
99.5%
98.7%
98.8%
98.4%
98.6%
0.02g/t
98.3%
ASX announcement 14 October 2024: Exceptional Recoveries from Star of Mangaroon – Mangaroon Au (100%)
Star of Mangaroon Scoping Study January 2025
dreadnoughtresources.com.au
Dreadnought Resources Ltd 4
9.
OPEN PIT DESIGN – MODIFYING PARAMETERS
The open pit process included the following steps:
9.1
Resource Dilution
Datamine’s Mineable Shape Optimiser (“MSO”) software was used to apply mining dilution to the November 2024
Resource model and to define economic material above the cut-off grade. Parameters used in MSO are summarised
below:
Table 7: Resource model dilution settings for MSO
Parameter
Units
Setting
Cut-off Grade
Minimum Ore Width (excl. dilution)
Dilution Skin Width
g/t Au
M
M
1.0
1.0
Footwall = 0.5
Hangingwall = 0.5
2.0
Y = 5.0
Z = 2.5
Minimum Waste Pillar
Other Block Dimensions
9.2
M
M
Open Pit Optimisation
Open pit optimisation shells were generated in Datamine’s NPV scheduler software using the MSO diluted Resource
model, contractor supplied rates, overall wall angles based on geotechnical parameters and metallurgical recovery.
Table 8: Open pit optimisation parameters
Parameter
Gold Price
Royalties (State and other)
Overheads
Fixed Costs
Drill and Blast
Units
$/oz
% Revenue
$/bcm
$/bcm
$/bcm
Load and Haul Waste (average)
$/bcm
Load and Haul Ore (average)
$/bcm
Ore Haulage
Processing
Mining Recovery
Metallurgical Recovery
Slope Angles
$/t
$/t
%
%
°
9.3
Unit Rate
$4,000
4%
$8.84
$1.15
Transitional = $3.05
Fresh= $5.54
Transitional = $7.86
Fresh= $9.68
Transitional = $7.51
Fresh= $11.28
$44.08
$55.00
95%3
98%
Transitional = 40°
Fresh = 45°
Open Pit Mine Design
The 100% revenue factor optimisation shell was used to design the open pit.
Open pit design parameters included:
•
12m wide, 1:9 gradient single lane ramp for the entirety of the open pit:
•
20m vertical interval between dual lane passing bays;
•
Open pit walls and berms were designed according to the specified geotechnical parameters detailed in Table
4.
The pit design is 250m long, 180m wide and 85m deep and is shown in Figures 2-4.
3
95% mining recovery was applied to the optimization process. The open pit physicals apply 100% mining recovery, with an additional 200% dilution
applied to the 5% Ore excluded from the optimization process..
Star of Mangaroon Scoping Study January 2025
dreadnoughtresources.com.au
Dreadnought Resources Ltd 5
Figure 2: Plan view of the Star of Mangaroon pit design and Resource
Figure 3: Long section (looking west) of the Star of Mangaroon pit design and Resource
Star of Mangaroon Scoping Study January 2025
dreadnoughtresources.com.au
Dreadnought Resources Ltd 6
Figure 4: Oblique view of the Star of Mangaroon pit design and Resource
Other infrastructure designed on tenement M09/175 include: a waste dump, ore pad (“ROM”), water storage dam,
topsoil storage stockpiles, roads, etc. Quantities for clearing, stripping, and stockpiling of vegetation and topsoil were
calculated using the design footprint.
Star of Mangaroon Scoping Study January 2025
dreadnoughtresources.com.au
Dreadnought Resources Ltd 7
Figure 5: Star of Mangaroon open pit mine infrastructure on mining lease M09/175.
Other mine design and scheduling assumptions include the following:
•
Required RC grade control drill metres for the life of mine were estimated to be 1,500m.
•
Blast hole drill metres and explosive quantities were calculated using the parameters detailed in Table 9. 100%
blasting was assumed.
•
Load and haul production was scheduled based on the capability of a 100t class excavator and 100t rigid trucks,
mining 2.5m flitch heights, with consideration of haulage distance to stockpile locations.
Star of Mangaroon Scoping Study January 2025
dreadnoughtresources.com.au
Dreadnought Resources Ltd 8
Table 9: Open pit drill and blast parameters
Production Drilling Parameters
Material Type
Hole Diameter (mm)
Burden (m)
Spacing (m)
Sub-drill (m)
Wall Control Factor (batter holes/pre-splits)
Powder Factor (kg/bcm)
Ave Penetration Rate (m/hr)
9.4
Transitional
102
3.0
3.4
0.5
1.05
0.5
30
Fresh
102
2.7
3.1
0.7
1.17
0.7
22
Mining Recovery
The Study assumes 100% of the diluted MSO Resouce is recovered as Ore, with the following assumptions:
•
95% of the Ore mined as per the diluted MSO Resource model with no further modifying factors applied; and
•
5% of the Ore applies a nominal 200% additional dilution at 0.00g/t Au.
The open pit physicals are shown below.
Table 10: Open pit physicals
Ore Physicals
Units
Total
High Grade Ore Tonnes (95% Ore)
High Grade Ore Grade (95% Ore)
High Grade Gold in