Large, High Confidence Yin Ironstone Resource - Mangaroon (100%)
HIGHLIGHTS
•
Large, independent JORC Code 2012 Mineral Resource (“Resource”) at the Yin REE Ironstone Complex
(“Yin”) delivers a high confidence Resource – 87% Measured & Indicated. The Resource now totals 29.98Mt
@ 1.04% TREO and has been delivered in only 18 months from discovery.
•
The Resource contains significant neodymium and praseodymium (“Nd2O3+Pr6O11” or “Nd+Pr”) at various
cut-off grades (Table 1).
Cut-Off
(%TREO)
0.20
0.40
1.00
Table 1: Yin Resource as adjusted for different cut-off grades.
Resource
TREO
NdPr:TREO Contained TREO
Contained NdPr
(Mt)
(%)
(%)
(t)
(t)
29.98
1.04
29%
311,800
89,900
21.06
1.35
29%
82,100
284,300
11.63
1.93
29%
66,300
224,400
•
The Resource only covers ~10% of the 43km long Yin strike.
•
Importantly, an initial Measured Resource of 5.17Mt @ 1.34% TREO has been defined over just ~250m of
strike where the thick, high-grade Resource occurs at surface. And the Indicated Resource has increased to
21.13Mt @ 1.02% TREO (see Figures 5-7 and Tables 4-7).
•
This confirms the 100% owned Mangaroon project as a globally significant critical minerals complex with a
combined, high confidence Resource at Yin and the Gifford Creek Carbonatite of 40.82Mt @ 1.03% TREO.
This points to a long-life, strategically important, Tier 1 project in one of the world’s top investment
jurisdiction, Western Australia (Investment Attractiveness Index - Fraser Institute, May 2023).
Dreadnought Resources Limited (“Dreadnought”) is pleased to announce a significant
Resource increase and upgrade at Yin, part of the 100% owned Mangaroon project, located
in the Gascoyne Region of WA.
Dreadnought’s Managing Director, Dean Tuck, commented: “Since drilling commenced in June 2022, Dreadnought
has delivered another substantial increase in the initial Resource over just 4.6kms of the Yin Ironstone Complex.
The
upgraded
independent
Resource confirms Yin as a highgrade and high Resource intensity
deposit. Both material factors in a
project’s
economics.
Yin
continues to demonstrate one of
the highest NdPr:TREO ratios in
the world. We are proud of how
much has been achieved in such a
short space of time and are
looking forward to continuing to
build on the regions potential in
2024.”
Figure 1: Photo of Dreadnought’s
Luke Blais, Frank Murphy, Matt
Crowe and Sam Busetti with the
discovery hole YINRC001 in June
2022.
dreadnoughtresources.com.au
1
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
SNAPSHOT – MANGAROON CRITICAL MINERALS
Mangaroon is 100% Owned
•
100% owned Mangaroon confirmed as a globally significant critical minerals complex with a combined Resource
at Yin and the Gifford Creek Carbonatite of 40.82Mt @ 1.03% TREO.
Genuine Scale Potential Already at Yin
•
Independent Yin Resource of 29.98Mt @ 1.04% TREO (ASX 30 Nov 2023) covers only ~4.6km of ~43km of strike
- 87% Measured and Indicated.
•
Large JORC Exploration Target for the top 150m of the Yin REE Ironstone Complex (ASX 13 Feb 2023) to be
updated in 2024.
Cautionary Statement: The Exploration Target has been prepared and reported in accordance with the JORC Code 2012.
The potential quality and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to
estimate a Resource for all target areas reported. It is uncertain if further exploration will result in the estimation of a Resource.
Significant, Step-Change, Growth Potential at the Gifford Creek Carbonatite
•
The Gifford Creek Carbonatite is considered to be the regional source of REE.
•
In less than 12 months from discovery of the Gifford Creek Carbonatite, a large, independent Resource of
10.84Mt @ 1.00% TREO was delivered (ASX 28 Aug 2023). The Resource contains a range of critical minerals
including rare earths, niobium, phosphate, titanium and scandium.
•
The initial Resource covers an area of only ~600m x 550m. With the Gifford Creek Carbonatite now expanding
to >17kms x 1km under wide-spaced, first pass drilling, it is expected that the Resource will grow substantially
with future drilling.
High-grade, Multi-Metal Potential Including REE (Neodymium, Praseodymium), Phosphate,
Niobium, Titanium & Scandium
•
The mineralisation at the Yin REE Ironstone Complex contains significantly higher NdPr as a fraction of the
rare earth oxides (“NdPr:TREO” ratio) than most other REE deposits globally; over 50% higher than the
global average.
•
Partially completed, first pass, wide-spaced drilling over the Gifford Creek Carbonatite has identified significant
critical metal potential with REE, P, Nb, Ti and Sc.
Potentially Attractive Mining Proposition
•
At Yin, broad zones of flat to moderate dipping mineralisation with parallel lodes and Resource intensity of
~4.8Mt/km make for a potentially attractive mining proposition. This is further demonstrated by an initial
Measured Resource of 5.17Mt @ 1.34% TREO over just ~250m of strike at Yin where the thick, high-grade
Resource occurs at surface.
Positive Metallurgy Results
•
Metallurgical test work from Yin has performed well, achieving recoveries ranging from 85.9% to 92.8% at a
concentrate grade of 10.76% to 15.31% Nd2O3+Pr6O11.
•
REE at Yin is predominantly hosted in monazite which is amenable to commercial processing.
•
Significant metallurgical studies ongoing – final results expected in March 2024 quarter.
Global Strategic Imperative Driving Rare Earth Growth & Prices
•
Supply chain security and low carbon transition are imperatives against a backdrop of heightened geopolitical
tension.
•
Dreadnought is receiving increasing levels of interest from midstream and downstream industry participants in
Mangaroon. While the current focus is on upstream options (mining, milling and concentrating) opportunities
to collaborate with midstream and downstream industry participants may represent an opportunity.
dreadnoughtresources.com.au
2
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Discussion
Outcropping REE mineralisation was first observed at Mangaroon in July 2021. Since then, ~43kms of REE bearing
ironstones and the 17km long Gifford Creek Carbonatite have been identified.
To date, 688 RC holes and 42 diamond holes have been drilled along Yin and the Gifford Creek Carbonatite. The
first two years of drilling have delivered:
-
a Resource at Yin of 29.98Mt @ 1.04% TREO over ~4.6kms - 87% Measured & Indicated; and
-
an initial Resource at the 17km long Gifford Creek Carbonatite of 10.84Mt @ 1.00% TREO as well as
significant REE-Nb-Ti-P-Sc mineralisation; and
-
a combined Resource at Mangaroon of 40.82Mt @ 1.03% TREO.
The Yin Resource of 29.98Mt @ 1.04% TREO covers ~4.6kms of the Yin REE Ironstone Complex and is based
on 345 RC drill holes (38,904m) and 32 diamond drill holes (3,358.72m). Importantly, the Resource includes an
initial Measured Resource of 5.17Mt @ 1.34% TREO and Indicated Resource of 21.13Mt @ 1.02% TREO
(NdPr:TREO of 29%).
With a large, high-confidence Resource now defined, further site work on rare earths at Mangaroon will, in the
short term, be limited to drilling a number of geophysical targets that are analogous to high-grade zones already
identified. EIS co-funding is in place to conduct this work in 2024.
Figure 2: Photo of Dreadnought’s Claudia Tomkins and Sam Busetti inspecting pXRF results from RC drill chips.
dreadnoughtresources.com.au
3
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Material Information Summary – Resource Estimation
Pursuant to ASX listing rule 5.8.1 and complementing JORC Table 1 (attached), Dreadnought advises that the
Resource was estimated by an independent consultant from Widenbar and Associates Pty Ltd (“Widenbar”).
Widenbar worked in conjunction with Dreadnought’s geologists and Payne Geological Services Pty Ltd. Commentary
on the relevant input parameters for the Resource process is contained at the end of this announcement.
Location and Region
Mangaroon contains the Yin REE Ironstone Complex and is located ~250kms south-east of Exmouth, in the Gascoyne
Region of Western Australia. The Yangibana REE Ironstone Project is Dreadnought’s immediate neighbour and is
located to the north of Yin on the northern side of the Lyons River Fault.
Rare earths at the Yangibana ironstones were first identified in 1981 and have similar metallurgical properties as the
Yin ironstones to the south of the Lyons River Fault. However, rare earths to the south of the Lyons River Fault also
vary significantly to those in the north including:
•
a high Resource intensity of ~6.5Mt/km (~3.8Mt/km of oxide mineralisation), making for potentially low-cost
Resource growth and a likely attractive mining proposition;
•
the potential regional source of the rare earths in the Gifford Creek Carbonatite already at ~17kms x 1km;
•
a suite of critical minerals including light and heavy rare earths, phosphate, niobium, titanium and scandium.
The Resource of 29.98Mt @ 1.04% TREO only covers ~4.6km of the ~43km long Yin REE Ironstone Complex.
Geological Interpretation and Wireframing
Mangaroon occurs within the Gascoyne Province of the Capricorn Orogen, situated between the Archean Pilbara
and Yilgarn cratons. The Gascoyne Province consists of a basement suite of Neoarchean to Palaeoproterozoic granite
gneisses that are overlain by various Proterozoic rocks. These Proterozoic rocks include:
•
the 1830–1780 Ma Moorarie Supersuite consisting of granitic rocks;
•
the Durlacher Supersuite, a unit comprising granitic and minor gabbroic intrusions that are heavily deformed
and believed to be largely synchronous with the 1680-1620 Ma Mangaroon Orogeny; and
•
the c.1680 Ma Pooranoo Metamorphics comprising of pelitic gneiss and metamorphosed feldspathic
sandstones.
REE-bearing ironstones and carbonatites form components of the ~1370 Ma Gifford Creek Carbonatite Complex
(“GCCC”). GCCC is an area surrounding the Lyons River Fault, which is the major crustal structure formed during
the suturing of the Neoarchean Glenburgh Terrane with the Archean Pilbara Craton during the 2215-2145 Ma
Ophthalmian Orogeny.
The rocks of the GCCC include calcite carbonatite, dolomite carbonatite, ankerite-siderite carbonatite, magnetitebiotite dykes, fenites, glimmerites and REE-bearing ironstones and carbonatite plugs. The previously defined boundary
of the GCCC has been significantly expanded due to drilling by Dreadnought (Figure 3). A large body of carbonatite
plugs (Gifford Creek Carbonatite) form the central intrusions in the region while the highly fractionated
ferrocarbonatite dykes form cone sheets around the intrusions and the radial/ring dykes splay off the intrusion (Figure
3).
dreadnoughtresources.com.au
4
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Figure 3: Local geological relationships between the Gifford Creek Carbonatite and the known ironstones across the
Yin and the nearby Yangibana Projects. The ~4.6km long Yin Resource is highlighted.
Dreadnought supplied a detailed Digital Elevation Model for the whole of Mangaroon. This was subset into a smaller
version to cover the Yin and Yin South deposits.
Dreadnought’s drill hole database identified the Base of Complete Oxidation (“BOCO Depth”) and the Top of
Fresh material (“TOFR Depth”). The material between these two down hole depths is considered oxide. Based on
increased experience, this Resource update includes a significant relogging and interpretation of the BOCO Depth
and TOFR Depth which has resulted in refined oxide and fresh domaining.
The BOCO Depth is generally quite shallow, typically from 0 to 5m, whereas the TOFR Depth can typically be
between 50-80m below surface. The position of these depths is used in conjunction with weathering logging in the
lithology data to generate BOCO Depth and TOFR Depth. In turn, this data is used in conjunction with lithology
logging in assigning density and also in differentiating between fresh and oxidised carbonatite (i.e. ironstone when not
fresh).
In addition, the lithology has been simplified and re-coded, and a new geological model digitised and wireframed.
This model was provided to Widenbar in DXF format as two files containing the interpreted dykes and the fenite
bodies.
The TOFR Depth was then used to split the single dyke into oxide (above) and fresh (below). In addition, the dyke
and fenite wireframes were split into individually connected wireframes for Resource domaining.
dreadnoughtresources.com.au
5
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Y2
Yin
Yin South
Figure 4: Geological wireframes for the Yin ironstone dyke (oxide and fresh) over ~4kms of strike.
Drilling Techniques
Dreadnought’s drilling at Yin was conducted by Ausdrill Limited using reverse circulation (“RC”) drilling and by
Hagstrom using diamond (“DD”) drilling techniques. In total, 345 RC holes have been drilled, sampled and assayed
to estimate the Resource. In addition, 32 DD holes were drilled and sampled to produce samples for density
measurements, ongoing metallurgical testing and additional QAQC analysis. The results of a twinned hole study
between RC and DD holes found that all statistics and graphic logs support a reasonable correlation. The DD holes
generally confirm the grade distribution and tenor in the RC holes and hence that the RC holes are suitable for
further use in Resource estimation and classification.
All holes used in the Resource estimation have been previously announced with the necessary additional collar and
assay details provided. These holes are also shown in Tables 11 and 12.
RC holes were drilled with a 5¾-inch bit and face sampling hammer. RC holes are drilled with some water injection
at the bit for dust suppression and with the use of booster/auxiliary air if ground water is encountered. A total of
688 RC holes (77,624m) have been drilled to date. The updated Resource is based on 345 RC drill holes (38,904m)
drilled between June 2022 and September 2023.
DD holes were drilled as orientated HQ and NQ size with no RC pre-collars. A total of 42 DD holes (4,806.01m)
have been drilled to date. The updated Resource includes the results of 32 DD holes (3,358.72m) drilled between
June 2022 and September 2023.
The Yin Resource does not include drilling:
•
Further north and south along the Yin trend and the Y8 ironstones; and
•
the Gifford Creek Carbonatite.
Collar positions were recorded using a Emlid Reach RS2 RTK GPS system (+/- 0.2m x/y, +/-0.5m z).
GDA94 Z50s is the grid format for all xyz data reported.
Azimuth and dip of each drill hole were recorded after the completion of the hole using a Reflex Sprint IQ Gyro. A
reading was undertaken every 30th metre with an accuracy of +/- 1° azimuth and +/-0.3° dip.
dreadnoughtresources.com.au
6
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Sampling and Subsampling Techniques
RC samples were collected using two techniques, 1m splits directly from the rig sampling system and 3m composite
sampling from spoil piles.
From every 1m drilled, a 2-3kg sample (split) was sub-sampled into a calico bag via a Metzke cone splitter. All
remaining spoil from the sampling system was collected in buckets and deposited in rows adjacent to the rig. An
aluminium scoop was used to then sub-sample each spoil pile to create a 2-3kg 3m composite sample in a calico bag.
The rig geologist used preliminary pXRF analysis of pulverised and partially homogenised reject RC sample piles to
define mineralised zones which were subsequently sampled in detail (the 1m splits). Prior to February 2023,
unmineralised zones were sampled by 3m composite, post February 2023 unmineralised material is not sampled.
All samples were then sent for full analysis at ALS laboratories in Perth and Brisbane. Only assays received from the
laboratory were used for this Resource, no pXRF results have been used.
Industry standard QAQC measures were employed involving insertion of:
•
appropriate CRM standards at regular intervals;
•
field duplicates collected for both 1m splits and 3m composites at regular intervals; and
•
additional field duplicates and blanks collected in mineralised intervals.
All samples were dried and pulverised at the laboratory prior to analysis.
Orientated DD core samples were collected with a diamond drill rig drilling HQ and NQ core. After geological
logging and processing, the core was marked up for sampling at a typical minimal interval of 0.3m to ensure adequate
sample weight and to a typical maximum interval of 1.0m. The selected sample intervals of drill core were cut in half
or quartered along the length of the drill core. Specific Gravity, or density measurements, were taken for each
geological domain within the Resource by Dreadnought geologists and the laboratory for QAQC.
Sample sizes for both RC and DD are considered appropriate for the style of mineralisation.
Assaying and QAQC
Samples were submitted to the Perth laboratory for preparation and analysis by ME-MS61. Pulverised samples were
then transported to the Brisbane laboratory for analysis by Lithium Borate Fusion XRF (ALS Method “ME-XRF30”).
The 2-3kg samples were submitted to the Perth laboratory, oven dried to 105°C and pulverised to 85% passing 75um
to produce a 0.25g charge for determination of 48 multi-elements via 4 acid digestion with MS/ICP finish (ALS Code
ME-MS61). The pulverised sample was then sent to the Brisbane laboratory where a 0.66g charge was used for the
determination of TREO by ME-XRF30 analysis.
QAQC in the form of duplicates and CRM’s (OREAS Standards) were inserted through the mineralised zones at a
rate of 1:50 samples. Additionally, within mineralised zones, a duplicate sample was taken and a blank inserted directly
after. All QAQC returned satisfactory results.
Standard laboratory QAQC is undertaken and monitored.
Further information regarding exploration results can be found in previous announcements:
DRE Announcement 28 July 2022: Assays Confirm Yin as a High-Grade Rare Earth Discovery
DRE Announcement 5 September 2022: Further Assays Confirm Yin as A Significant REE Discovery
DRE Announcement 12 October 2022: Broad, High-Grade Assays at Yin REE Discovery – Mangaroon
DRE Announcement 24 October 2022: Broad, High-Grade Assays at Yin REE Discovery – Mangaroon
DRE Announcement 21 November 2022: Broad, High-Grade Assays at Yin REE Discovery – Mangaroon
DRE Announcement 13 March 2023: Successful Yin Extensional Drilling Results – Mangaroon
DRE Announcement 29 March 2023: Yin Resource to Grow, Carbonatite Drilling Commenced
DRE Announcement 13 June 2023: Yin Extended by ~1km & ~2.5km of High-Grade NdPr Discoveries
DRE Announcement 7 August 2023: Rare Earth Ironstone and Carbonatite Drilling Update
DRE Announcement 17 August 2023: Thick, High-Grade Rare Earths Continue at Yin
DRE Announcement 13 September 2023: Highest Grades to date from Yin Infill Drilling
DRE Announcement 16 October 2023: 100m Thick Rare Earth Intercepts from Yin
dreadnoughtresources.com.au
7
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Estimation Methodology
Widenbar was retained to produce a Resource estimate for ~4.6km of the mineralized Yin ironstone. Validated
drillhole data and geological interpretations were supplied by Dreadnought. Widenbar produced the Resource using
standard processes and procedures including data selection, composting, variography and estimation by Ordinary
Kriging prior to model validation.
Estimates were made and are reported for TREO, Nd2O3, Pr6O11 and Nd2O3+Pr6O11 as well as bulk density.
Statistical Analysis and Variography
The original RC assays are a mixture of 1m and 3m samples, with mineralised intervals being identified using
preliminary pXRF analysis and being re-assayed at 1m intervals by an independent laboratory. DD sample intervals
are variable, corresponding to breaks in lithology and weathering.
For data analysis and Resource estimation processes, all assay data has been composited to 1m intervals.
The wireframe solids and the weathering surfaces were used to apply lithological and weathering codes to the
composite data. Summary statistics have been calculated for the major elements within each domain. There was a
total of 24,136 composites available for use in Resource estimation.
Probability plots and histograms were used to confirm domaining produced consistent data sets.
Table 2: Final density values used in converting volumes to tonnes.
LITH
WEATHERING
DENSITY
Ironstone
OX/TR
2.80
Fenite
OX/TR
2.68
Country Rock
OX/TR
2.60
Calcrete
OX/TR
2.41
Ironstone
FR
3.30
Fenite
FR
2.94
Country Rock
FR
2.75
There are 613 density measurements from DD core in the final data
set. These have been coded with the lithology wireframes and the
weathering surfaces and histograms and statistics have been collated.
The mean, median and the histogram distributions for fresh and
oxidised versions of each major lithology have been reviewed and a
single value determined for each weathering/lithology combination.
Variograms have been calculated for the combined
ironstone/carbonatite domain for Nd2O3, Pr6O11 and Nd2O3+Pr6O11
and used to control the Ordinary Kriging estimation process, which
was carried out in Micromine 2023 software.
Block Model and Resource Estimation
An “empty” rock model was created using the topographic and weathering surfaces and the geological wireframe
solids as constraints.
A process of “unfolding” is applied to the block model and the composite data to avoid issues related to the variable
dip and strike of parts of the mineralised domains. This effectively makes a dynamic search ellipse and all searches
become oriented in a simple north-south and vertical direction.
Interpolation is carried out using the Ordinary Kriging process in Micromine 2023. A two-pass search strategy was
used, with the following parameters.
Table 3: Search parameters used in Ordinary Kriging.
Search
Samples
Holes
Search
Pass
Min
Max
Min
Min/Hole
Max/Hole
Along Strike
Down Dip
Across Dip
1
8
16
2
2
4
120
60
5
2
2
16
1
1
4
200
100
10
Block model validation has been carried out as shown below and all methods produced good comparisons:
•
Drill hole section comparison;
•
Comparison of means for model vs data; and
•
Swathe plots of model vs data.
dreadnoughtresources.com.au
8
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Figure 5: Section 7350200N showing the grade distribution within the Resource model.
Figure 6: Detail of part of 7350200N showing high grades at surface.
Cut-off Grade
A series of TREO% cut-offs has been included in this announcement, with the lowest (0.20% TREO) used by or
approximating the cut-off applied at the close-by and advanced-stage Yangibana REE Ironstone Project. A TREO grade
of 0.20% represents the transition between consistently mineralised and unmineralised material.
dreadnoughtresources.com.au
9
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Resource Classification
The Resource has been classified in the Measured, Indicated and Inferred categories, in accordance with the 2012
Australasian Code for Reporting of Mineral Resources and Ore Reserves (2012 JORC Code). A range of criteria has
been considered in determining this classification including:
•
Geological continuity;
•
Data quality;
•
Drill hole spacing;
•
Modelling technique; and
•
Estimation properties including search strategy, number of informing data and average distance of data from
blocks.
The Resource classification methodology incorporated a number of parameters derived from the Ordinary Kriging
algorithms in combination with drill hole spacing and continuity and size of mineralised domains.
Geological Continuity
Geological continuity is understood with reasonable confidence. The classification reflects this level of confidence.
Data Quality
Resource classification is based on information and data provided from Dreadnought’s database. Descriptions of
drilling techniques, survey, sampling/sample preparation, analytical techniques and database management/validation
indicate that data collection and management is well within industry standards. Widenbar considers that the database
represents an accurate record of the drilling undertaken.
Drilling Spacing
Drill hole location plots have
been used to ensure that local
drill spacing conforms to the
minimum expected for the
resource classification. The
drilling at Yin and Y2 is mainly
on 50m spaced northing section
lines corresponding to an
Indicated classification, with an
area of infill 25m drilling in the
southern part of the main Yin
deposit which is considered
Measured. There are several
small, isolated zones either
informed by a single drill hole or
where section spacing is still
100m, which have been
classified in the Inferred
category. Drilling at the Sabre
deposit is nominally at 100m
spacing and has been classified as
Inferred.
Figure 7: Plan view image
showing the drill hole spacing at
Yin (left) and Sabre (right) –
Measured classification
highlighted in green.
dreadnoughtresources.com.au
10
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Resource Estimate
A summary of the current Resource of 29.98Mt @ 1.04% TREO is shown below. A series of TREO% cut-offs has
been used, with the lowest (0.20% TREO) used by or approximating the cut-off applied at the close-by and
advanced-stage Yangibana Project. Numbers may not add up due to rounding.
Table 4: Summary of Yin Resources at 0.20% TREO Cut-off.
Resource
Classification
Geology
Measured
Measured
Measured
Indicated
Indicated
Indicated
Inferred
Inferred
Inferred
Total
Total
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
TOTAL
Tonnes
(Mt)
TREO
(%)
NdPr:TREO
Ratio (%)
Contained
TREO (t)
Contained
Nd2O3+Pr6O11 (t)
2.47
2.70
5.17
13.46
7.67
21.13
1.51
2.17
3.68
17.44
12.54
29.98
1.61
1.09
1.34
1.06
0.95
1.02
0.75
0.75
0.75
1.11
0.95
1.04
29
27
28
29
29
29
25
28
27
29
29
29
39,700
29,500
69,300
142,600
72,800
215,400
11,200
16,300
27,600
193,600
118,700
312,300
11,400
8,100
19,500
41,000
21,300
62,300
2,800
4,500
7,300
55,300
33,900
89,300
Table 5: Summary of Yin Resources at 0.40% TREO% Cut-off.
Resource
Classification
Geology
Measured
Measured
Measured
Indicated
Indicated
Indicated
Inferred
Inferred
Inferred
Total
Total
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
TOTAL
Tonnes
(Mt)
TREO
(%)
NdPr:TREO
Ratio (%)
Contained
TREO (t)
Contained
Nd2O3+Pr6O11 (t)
2.09
2.22
4.31
9.16
5.18
14.34
1.07
1.35
2.42
12.32
8.74
21.06
1.84
1.27
1.55
1.41
1.25
1.35
0.92
1.00
0.96
1.44
1.22
1.35
29
28
28
29
30
29
26
28
27
29
29
29
38,500
28,100
66,600
129,200
64,800
194,000
9,800
13,400
23,200
177,500
106,300
283,800
11,100
7,800
18,900
37,900
19,200
57,100
2,500
3,700
6,300
51,500
30,700
82,200
Table 6: Summary of Yin Resources at 1.00% TREO% Cut-off.
Resource
Classification
Measured
Measured
Measured
Indicated
Indicated
Indicated
Inferred
Inferred
Inferred
Total
Total
Geology
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
Subtotal
Oxide
Fresh
TOTAL
Tonnes
(Mt)
TREO
(%)
NdPr:TREO
Ratio (%)
Contained
TREO (t)
Contained
Nd2O3+Pr6O11 (t)
1.60
1.36
2.96
5.34
2.65
7.99
0.26
0.42
0.68
7.20
4.43
11.63
2.22
1.68
1.97
1.99
1.81
1.93
1.67
1.72
1.70
2.03
1.76
1.93
29
28
29
30
30
30
28
29
29
30
29
29
35,600
22,800
58,400
106,400
47,900
154,300
4,300
7,300
11,600
146,300
78,000
224,300
10,400
6,400
16,800
31,600
14,400
46,000
1,200
2,100
3,300
43,200
23,000
66,200
dreadnoughtresources.com.au
11
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Figure 8: TREO% grade tonnage curve for oxide and fresh mineralisation.
Comparison with Previous Resource Estimates
Widenbar produced an initial Resource estimate for Yin in December 2022 and July 2023 as summarised below in
comparison to the current Resource.
Overall, there has been an increase from 14.4Mt to 20Mt to 30Mt, with a slight decrease in grade from 1.13%
TREO to 1.03% TREO to 1.04% TREO. This is due partly to an increase in the depth of the main part of the Yin
deposit and the inclusion of a Resource at Yin South, Y2 and Sabre.
Significantly, there has been a classification of 5.17Mt to the Measured category and 21.13Mt to the Indicated
category.
Table 7: Summary of December 2022 Yin Resources at 0.20% TREO Cut-off.
Resource
Tonnes
TREO
Nd2O3+Pr6O11
NdPr:TREO
Geology
Classification
(Mt)
(%)
(kg/t)
Ratio (%)
Inferred
Ironstone
4.80
1.67
5.1
31
Inferred
Carbonatite
4.09
1.54
4.7
31
Inferred
Fenite
5.47
0.36
0.8
23
TOTAL
14.36
1.13
3.4
30
Contained
TREO
80,100 t
63,000 t
19,700 t
162,800 t
Contained
Nd2O3+Pr6O11
24,500 t
19,300 t
4,400 t
48,200 t
Table 8: Summary of July 2023 Yin Resources at 0.20% TREO% Cut-off.
Resource
Tonnes
TREO
Nd2O3+Pr6O11
NdPr:TREO
Geology
Classification
(Mt)
(%)
(kg/t)
Ratio (%)
Indicated
Oxide
3.01
1.25
3.5
28
Indicated
Fresh
2.52
1.21
3.4
28
Indicated
Subtotal
5.52
1.23
3.4
28
Inferred
Oxide
11.35
0.91
2.5
28
Inferred
Fresh
3.18
1.09
3.3
31
Inferred
Subtotal
14.56
0.95
2.7
29
Total
Oxide
14.36
0.98
2.7
28
Total
Fresh
5.7
1.14
3.3
29
TOTAL
20.06
1.03
2.9
28
Contained
TREO
37,700 t
30,400 t
68,100 t
102,900 t
34,900 t
137,800 t
140,600 t
65,300 t
205,900 t
Con
Share your feedback
Discover