Drilling of 4 Compelling Targets Completed - Central Yilgarn
Released
Released
Announcement PDF
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
ASX ANNOUNCEMENT 29 April 2024
Drilling of 4 Compelling Gold Targets Completed - Central Yilgarn (100%)
HIGHLIGHTS
•
A 13 hole (1,590m) RC program has been completed at Central Yilgarn, testing 4 compelling gold
targets being Viper, Leghorn, Chicken Little and Honey.
•
Drilling at each target intersected the expected mineralisation style and anomalism. Assay results
are expected in June 2024.
•
Viper, Leghorn and Chicken Little have known gold mineralisation from limited previous
exploration with significant intercepts including:
• T1: BARAC0136: 15m @ 1.5g/t Au from 12m, incl. 3m @ 6.7g/t Au from 12m (Viper)
• T2: BARRC007: 48m @ 0.7g/t Au from 27m, incl. 21m @ 1.3 g/t Au from 54m (Leghorn)
• T6: BARAC0477: 24m @ 1.6 g/t Au from 0m, incl. 9m @ 3.3g/t Au from 12m (Chicken Little)
•
Honey is a shallow historical working with free gold in altered ultramafic rocks, similar to the highgrade Wattle Dam deposit (~250koz @ 10.9 g/t Au produced1). Honey contains no previous drilling.
Dreadnought Resources Limited (“Dreadnought”) is pleased to announce the completion of
drilling at 4 compelling gold targets at the 100% owned Central Yilgarn project located in
Western Australia.
Dreadnought’s Managing Director, Dean Tuck, commented: “We liked what we saw from our RC drilling at Viper, Leghorn,
Chicken Little and Honey. Assays in June 2024 are eagerly anticipated. We are now mobilising to test our high-grade gold
targets at Mangaroon and to undertake further target generation and definition work. Our gold and copper focused exploration
programs for 2024 are well underway and we look forward to a steady stream of results for the remainder of the year.”
Figure 1: RC Rig drilling at Honey with historical workings in the foreground.
1. Bath, A. B., et al., Alteration patterns linked to high grade gold mineralisation the Wattle Dam deposit, Western Australia. Ore Geology Reviews 125 (2020).
dreadnoughtresources.com.au
1
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
SNAPSHOT – CENTRAL YILGARN
Central Yilgarn - 100% Owned
•
Over 1,400km2 of highly prospective ground within the world class Yilgarn Craton.
•
Covering 140 strike kms of greenstone belts including Illaara, Yerilgee, Evanston and South Elvire.
Consolidated Opportunity
•
For the first time ever, the Illaara, Yerilgee, Evanston and South Elvire greenstone belts are under one group’s
control and can be assessed on a consolidated basis. Dreadnought has systematically merged all data in
relation to the greenstone belts.
Genuine Camp Scale Potential
•
An intensive review has identified 7 camp scale prospects with promising lithostructural settings and known
gold mineralisation with supportive pathfinder geochemistry.
Significant, Step-change, Growth Potential
•
Key catalysts to be pursued in 2024 include:
•
Honey: Wattle Dam analogue (>250koz @ 10.9 g/t Au)
•
Viper: ~1,500m x ~800m Au-As-Sb anomaly with 15m @ 1.5g/t Au from 12m, including 3m @ 6.7g/t
Au from 12m (BARAC0136 ASX.AMD 14 September 2017)
•
Leghorn: ~3,500m x ~300m Au-As-Bi-Mo-Te-W anomaly with 48m @ 0.7g/t Au from 27m, including
21m @ 1.3 g/t Au from 54m (BARRC007 ASX.AMD 14 September 2017)
•
Chicken Little: ~1,500m x ~300m Au-As-Sb-Pb-Zn-Ag anomaly with 56m @ 0.8g/t Au from 0m,
including 24m @ 1.6 g/t Au from 0m and 9m @ 3.3g/t Au from 12m (BARAC0447 ASX.AMD 14 June 2018)
•
Snowflake: 16m @ 1.9g/t Au from 0m, including 4m @ 8.5 g/t Au from 0m (STKAC0118 ASX.AMD 22
November 2018)
•
Megatron: 9m @ 2.6g/t Au from 23m, including 3m @ 7.1 g/t Au from 26m (STKAC0154 ASX.AMD 22
November 2018)
Gold is a Long-term, Strategic, Global Asset During Uncertain Times
•
Gold is a long-term, strategic, global asset that provides a store of value in uncertain times. With banking
sector uncertainty, geopolitical tensions and a challenging economic environment, gold’s role as a safe haven
has come to the fore.
•
Private and central bank demand for gold from China is strong as is other central bank buying.
dreadnoughtresources.com.au
2
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
T1 Prospect: Viper BIF Hosted, High Grade Au Target
Viper is located within the Evanston greenstone belt ~10kms along strike from the historic Evanston gold mine (Ramelius
Resources). The Evanston deposit was discovered as outcropping mineralisation in 1937 and mined intermittently until the early
2000s. Evanston is a banded iron formation (“BIF”) hosted, high-grade deposit and, along with the Copperhead gold mine in
Bullfinch, is a conceptual analogue for Viper.
Between the Evanston gold mine and Viper, there are shallow historical workings on outcropping BIFs. Viper itself is a ~1,500m x
~800m Au-As-Sb anomaly over an area of complexly deformed and possibly faulted BIFs and ultramafic rocks. There is no
outcropping BIF, a possible indication of sulphidation and mineralisation undercover.
First pass AC drilling in 2017 and 2018 intersected significant mineralisation including:
BARAC0136 15m @ 1.5g/t Au from 12m, including 3m @ 6.7g/t Au from 12m.
The recent drilling at Viper (3 RC holes, 612m) targeted coincident AC, downhole EM and IP anomalies. Drilling intersected a
sequence of moderately west dipping mafic amphibolites, ultramafics and BIFs. Significant sulphide mineralisation and silicification
was observed through the BIF horizons, characterised by a disseminated pyrite-pyrrhotite-arsenopyrite assemblage. Highly altered
sections of the BIF were focused on the footwall contact with the volcanic sequence, consisting of meta-basalts, dolerites and
ultramafics similar to mineralisation at Evanston.
The main chargeability anomaly tested
with CYRC009 coincided with both a
shallower sulphidised BIF-mafic-ultramafic
contact (that is also coincident with the
down hole EM anomaly) and deeper
moderately
disseminated magnetite
within
serpentinised
ultramafic
stratigraphy. It is uncertain at this stage
which is responsible for the IP anomaly.
The downhole EM anomaly appears to be
related to magnetite-rich and sulphidised
BIF
horizons
that
are
related
stratigraphically
with
mineralised
intercepts in previous AC drilling and
therefore
possibly
related
to
mineralisation.
Assay results are expected in June 2024.
Figure 2: Cross section of Viper showing
previous shallow AC drilling in relation to
the
modelled
DHEM
plate,
IP
chargeability shells and 2 of the recent RC
holes.
dreadnoughtresources.com.au
3
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Figure 3: Plan view of Viper highlighting the location of recent drilling in relation to previous drill intercepts, the IP anomaly and
the gold-in-soil geochemical anomalies over a greyscale magnetics image.
dreadnoughtresources.com.au
4
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
T2 Prospect: Leghorn and Honey Targets
Leghorn is located within the South Elvire greenstone belt which was first identified as prospective for gold in the late 1980s with
significant BLEG anomalies which have never been followed up.
Leghorn itself is a ~3,500m x ~300m Au-As-Bi-Mo-Te-W anomaly along a sheared contact of ultramafics and high titanium mafic
amphibolites that has seen limited drilling by shallow, wide spaced, first pass AC and RC drilling.
During the AC program, gold mineralisation was identified during earthworks and an RC fence line was drilled producing significant
gold intercepts including:
BARRC007 48m @ 0.7g/t Au from 27m, including 21m @ 1.3 g/t Au from 54m.
In 2018, a diamond hole (BARDD002) was drilled close to BARRC007 to provide core for structural and petrophysical study.
BARDD002 intersected 34m @ 0.5g/t Au including 1m @ 2.0g/t, 7m @ 1.0g/t and 1m @ 2.9g/t Au. Mineralisation was confirmed
to be hosted in multiple phases of quartz-sulphide veins, disseminated sulphides and carbonate alteration within high titanium mafic
amphibolites. In 2019, an IP survey identified a significant chargeability anomaly beneath the shallow drilling. Despite these
encouraging results, no further work was undertaken.
Drilling at Leghorn (2 RC holes, 414m) targeted both mafic-hosted gold mineralisation identified in historical drilling and a nearby
IP chargeability anomaly. Drilling (CYRC007) beneath the historical mineralisation intersected a highly deformed package of mafic
amphibolites, felsic intrusives and ultramafic rocks. Moderate amphibolite-hosted sulphide mineralisation was observed between
40-51m, and 140-170m depth. Both zones were adjacent to strong rheological contrasts with thick ultramafic sequences adjacent
to aplitic dykes, and leaves open the potential for both shallow or steeply dipping mineralisation and/or multiple mineralised lodes.
Drilling (CYRC008) of the IP chargeability intersected a thicker sequence of serpentinised ultramafic rocks with abundant
disseminated magnetite and sulphides. This magnetite-sulphide unit coincided with the main chargeability anomaly.
Honey is a shallow working that hosts free gold within altered ultramafic rocks with no obvious sulphide alteration or veining. This
is similar to the high-grade Wattle Dam deposit (>250koz @ 10.9 g/t Au). Honey contains no previous drilling.
Drilling at Honey (6 RC holes, 294m) targeted the historical shallow, high-grade gold workings and a coincident gold-in-auger
anomaly, within highly deformed mafic and ultramafic rocks under shallow calcrete cover. All 6 shallow holes successfully
intersected the target stratigraphic sequence of sheared mafics, ultramafics and serpentinites. The targeted lithological contacts
were highly deformed,
consistent with geological
mapping
within
and
surrounding the shallow
gold workings. Sporadic
quartz veinlets with
associated
sulphides
were observed in the
footwall and hangingwall,
which may be related to
mineralisation.
Results are expected in
June 2024.
Figure 4: Cross section of
Leghorn showing
previous RC drilling in
relation to IP
chargeability shells. The
conceptual mineralised
structure and recent
holes are also shown.
dreadnoughtresources.com.au
5
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Figure 5: Plan view of Leghorn and Honey highlighting the location of recent drilling in relation to previous drill intercepts and the
IP anomaly and gold-in-soil geochemical anomalies over a greyscale magnetics image.
dreadnoughtresources.com.au
6
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
T6 Prospect: Chicken Little Target
The Chicken Little, Snowflake and Megatron targets are located within the T6 prospect in the centre of the Yerilgee greenstone
belt. T6 contains significant gold and pathfinder anomalism associated with a series of felsic and lamprophyre intrusions into a
sequence of mafic, ultramafic and BIF lithologies. Across T6, there is a clear fractionated intrusion related hydrothermal cell with
the pathfinder geochemical gradient transitioning from Mo-W associated with a major felsic intrusion to Bi-Te and As-Sb.
Chicken Little is a ~1,500m x ~300m Au-As-Sb-Pb-Zn-Ag anomaly along an intrusive contact of BIFs-ultramafic and sediment
package with felsic porphyries. During first pass wide spaced AC drilling in 2018, gold mineralisation was identified during
earthworks and an RC fence line was drilled producing significant gold intercepts including:
BARAC0477: 56m @ 0.8g/t Au from 0m, including 24m @ 1.6 g/t Au from 0m and 9m @ 3.3g/t Au from 12m.
In 2018, 4 shallow RC fence lines along ~900m of strike were drilled identifying pervasive gold mineralisation.
Drilling at Chicken Little (2 RC holes, 270m) intersected a moderate to strongly sulphidised ~40m wide BIF horizon, comprised
predominantly of pyrite-pyrrhotite, with isolated sections hosting significant arsenopyrite mineralisation. The BIF horizon is
consistent with gold mineralisation intersected in historical up-dip AC drilling. Within the BIF horizon, highest zones of deformation
and sulphide alteration occurred on the footwall and hangingwall contacts with a quartz-feldspar intrusive porphyry, along with a
highly altered horizon of felsic
schist. The felsic schist is
interpreted to be either highly
altered sedimentary rock or a
small porphyritic intrusion and
appears to be a key structural
component
to
the
mineralisation at Chicken
Little. Accompanying the BIFhosted sulphide mineralisation,
variable weak to moderate
quartz veining with associated
sulphides were observed
throughout the footwall and
hangingwall
quartz-feldspar
porphyry intrusion.
Results are expected in June
2024.
Figure 6: Cross section of
Chicken
Little
showing
previous RC drilling, gold
mineralisation within BIFs and
associated ultramafics and
recent RC holes.
dreadnoughtresources.com.au
7
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Figure 7: Plan view of the T6 prospect highlighting the location of recent drilling at Chicken Little in relation to previous drill
intercepts and gold-in-soil geochemical anomalies over a greyscale magnetics image.
dreadnoughtresources.com.au
8
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Central Yilgarn (100%) – Background
Central Yilgarn covers four greenstone belts within the highly prolific Yilgarn Craton of Western Australia. The project is located
~190kms northwest of Kalgoorlie and is adjacent to numerous large gold operations including Davyhurst (Ora Banda Mining),
Marda (Ramelius Resources) and Mt Ida (Delta Lithium & Aurenne Group Mining) – Figure 8.
Modern gold exploration only commenced in 2016 with wide spaced geochemical work to define evidence of camp scale gold,
pathfinders and alteration signatures. Since then, detailed project scale geophysical (magnetics, gravity) and soil geochemical work
has defined over a dozen camp scale prospects which have received only limited first pass AC and/or RC drilling. First pass drilling
at several of these camp scale prospects intersected significant gold mineralisation that was not followed up.
For the first time ever, the Illaara, Yerilgee, Evanston and South Elvire greenstone belts are under one group’s control and can be
assessed on a consolidated basis. Dreadnought has systematically merged all data in relation to the greenstones. This has resulted
in the prioritisation of 7 camp scale prospects (T1, T2, T6, T11, T18, T20, and T21). Importantly, 3 of these prospects have walk
up targets which were drilled in this recent program. Target definition and generation work is ongoing.
Figure 8: Plan view image of Central Yilgarn in relation to neighboring projects and existing infrastructure over a basic granite
greenstone geology map.
dreadnoughtresources.com.au
9
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Below is a summary of prospects, targets, highlights, activities and observations:
Prospect
T1
Target
Viper
Highlights
~1,500m x ~800m Au-As-Bi-Sb-Te-W soil
anomaly.
Previous significant intercepts:
15m @ 1.5g/t Au from 0m, incl.
3m @ 6.7g/t Au from 12m
Leghorn
~3,500m x ~300m Au-Bi-Mo-Sb-Te-W soil
anomaly.
Previous significant intercepts:
48m @ 0.7g/t Au from 27m, incl.
21m @ 1.3 g/t Au from 54m
Honey
Wattle Dam analogue (>250koz @ 10.9 g/t
Au)
T2
Chicken
Little
T6
Snowflake
Megatron
T11
TBD
T18
Sheoak
Lawrence’s
T20
CRA
Homestead
T21
Black Oak
Metzke’s
Find
~1,500m x ~300m Au-As-Pb-Zn-Sb-Ag soil
anomaly.
Previous significant intercepts:
56m @ 0.8g/t Au from 0m, incl.
24m @ 1.6 g/t Au from 0m and
9m @ 3.3g/t Au from 12m
Previous significant intercepts:
16m @ 1.9g/t Au from 0m, incl.
4m @ 8.5 g/t Au from 0m
Previous significant intercepts:
9m @ 2.6g/t Au from 23m, incl.
3m @ 7.1 g/t Au from 26m
~20km long lithostructural corridor in the
centre of the greenstone belt with
intermediate to felsic intrusives. Numerous
Au-Bi-Mo-Sb-Te-W geochemical anomalies
broken up by recent sand cover. Previous
shallow workings with rock chip results up
to 15.4g/t Au
~12km long lithostructural corridor with a
moderate to strong Au-Ag-As-Bi-Mo-W soil
anomaly. Previous shallow workings with
rock chip results up to 54.4g/t Au
~15km long lithostructural corridor in the
centre of the greenstone belt with a weak to
locally intense Au-As-Sb anomaly in area of
anomalously deep weathering and sand
cover rendering soil surveys largely
ineffective.
~10km long lithostructural anomaly in the
western mafics with local felsic intrusives
with a moderate Au-Ag-As-Bi anomaly.
Contains previous workings and the
Metzke’s Find Resource (14,900oz @ 6.8g/t
Au).
Activities/Observations
3 RC holes, 612m completed.
Downhole EM anomaly appears related to magnetite-rich and
sulphidised BIF horizons that are related stratigraphically with
mineralised intercepts in previous AC drilling.
2 RC holes, 414m completed.
Drilling identified:
- beneath the historical mineralisation, a highly deformed
package of mafic amphibolites, felsic intrusives and ultramafic
rocks. Moderate amphibolite-hosted sulphide mineralisation
between 40-51m, and 140-170m. Both zones are adjacent to
strong rheological contrasts with thick ultramafic sequences
adjacent to aplitic dykes.
- at the IP chargeability anomaly, a thicker sequence of
serpentinised ultramafic rocks with abundant disseminated
magnetite and sulphides.
6 RC holes, 294m completed.
Drilling intersected the target stratigraphic sequence of sheared
mafics, ultramafics and serpentinites. Sporadic quartz veinlets
with associated sulphides were observed in the footwall and
hangingwall.
2 RC holes, 270m completed.
Drilling intersected a moderate to strongly sulphidised ~40m
wide BIF horizon, comprised predominantly of pyritepyrrhotite, with isolated sections hosting significant
arsenopyrite mineralisation.
Geochemical/geophysical work prior to follow up drilling,
planned.
Geochemical/geophysical work prior to follow up drilling,
planned.
Geochemical surveys and mapping, completed.
Geochemical surveys and mapping, planned.
AC drilling through cover and deep weathering, planned.
AC drilling through cover and deep weathering around Black
Oak and 1-2 RC holes at Metzke’s North, planned.
Table 1: Summary of prospects, targets, highlights, activities and observations
dreadnoughtresources.com.au
10
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Background on Central Yilgarn (E16/495, E29/957, E29/959, E29/965, E29/1050, E29/1153, E29/1204, E29/1205,
E30/471, E30/476, E30/485, E30/493, E30/494, E30/534, E30/554, E77/2403, E77/2416, E77/2432, E77/2634: 100%)
(E29/1074, E30/499, P30/1157: Option to Acquire)
Central Yilgarn is located ~190 kms from Kalgoorlie and comprises 22 tenements (~1,400kms2) covering ~150km of
strike along the majority of the Illaara, Yerilgee, South Elvire and Evanston greenstone belts. For the first ever time,
Central Yilgarn has been consolidated through acquisitions from various parties.
Historically, Central Yilgarn was held by parties looking to develop iron ore mines north of the Koolyanobbing Iron
Ore Operation. Given the long history of iron ore mining in the region, Central Yilgarn is well situated in relation to
existing road and rail infrastructure connecting it to a number of export ports.
Figure 9: Plan view of the Central Yilgarn Project showing nearby projects and Yilgarn geology.
dreadnoughtresources.com.au
11
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
For further information please refer to previous ASX announcements:
•
24 June 2019
75 km Long Illaara Greenstone Belt Acquired from Newmont
•
23 September 2019
Illaara Gold Project Update
•
6 December 2019
Consolidation of 75km Long Illaara Greenstone Belt
•
25 November 2020
Mangaroon Ni-Cu-PGE & Au Project
•
27 April 2021
Illaara Update and Regional Target Generation
•
7 July 2022
Exercise of Option Consolidates Ownership of Illaara
•
13 July 2022
Divestment of Strickland Gold Project WA (ASX.AMD)
•
1 August 2022
Completion of Acquisition – Central Yilgarn Project
•
1 November 2022
Successful Drill Results Across Multiple Metals
•
27 April 2023
Initial High-Grade Resource at Metzke’s Find
•
8 February 2024
Seven Camp Scale Gold Prospects at Central Yilgarn
•
4 March 2024
Drilling of 4 Compelling Gold Targets Commenced
UPCOMING NEWSFLOW
April: Results of Ni-Cu-Co-PGE IP survey at Mangaroon (100%)
April: Quarterly Activities and Cashflow Report
April/May: Results from target generation and definition work at Central Yilgarn Au (100%)
May: Results of ANSTO Mixed Rare Earth Carbonate test work from Yin, Mangaroon REEs (100%)
May: Results of surface sampling programs at Mangaroon Au (100%)
May: Commencement of further target generation and definition work at Mangaroon Au (100%)
May: Commencement of RC drilling at Mangaroon Au (100%)
June: Results from RC drilling at Central Yilgarn Au (100%)
~Ends~
For further information please contact:
Dean Tuck
Managing Director
Dreadnought Resources Limited
E: dtuck@dreres.com.au
Jessamyn Lyons
Company Secretary
Dreadnought Resources Limited
E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
dreadnoughtresources.com.au
12
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts
and forward-looking information. Such forecasts, projections and information are not a guarantee of future performance, involve
unknown risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed
or implied. There are a number of risks, both specific to Dreadnought, and of a general nature which may affect the future
operating and financial performance of Dreadnought, and the value of an investment in Dreadnought including and not limited
to title risk, renewal risk, economic conditions, stock market fluctuations, commodity demand and price movements, timing of
access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve
estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and mining development, construction and
commissioning risk.
Competent Person’s Statement – Exploration Results
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was
compiled by Mr. Dean Tuck, who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the announcement of the
matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the original
reports, and that the forma and context in which the Competent Person’s findings are presented have not been materially
modified from the original reports.
dreadnoughtresources.com.au
13
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
INVESTMENT HIGHLIGHTS
Kimberley Ni-Cu-Au Project (80/100%)
The project is located only 85kms from Derby in the
West Kimberley region of WA and was locked up as a
Defence Reserve since 1978.
The project has outcropping mineralisation and historic
workings which have seen no modern exploration.
Results to date indicate that there may be a related, large
scale, Proterozoic Cu-Au-Ag-Bi-Sb-Co system at
Tarraji-Yampi, similar to Cloncurry/Mt Isa and Tennant
Creek.
Mangaroon Ni-Cu-Co-3PGE JV & Au/REE 100%
Project
Mangaroon covers ~5,000kms2 and is located 250kms
south-east of Exmouth in the Gascoyne Region of WA.
At the Money Intrusion, Ni-Cu-Co-3PGE has been
identified. Dreadnought also has areas of outcropping
high-grade gold including the historic Star of Mangaroon
and Diamonds gold mines. In addition, Mangaroon has
emerged as a globally significant, rapidly growing,
potential source of critical minerals. Highlights include:
-
An Exploration Target estimated for the top 150m
of ~40km of the Yin REE Ironstone Complex (ASX
13 Feb 2023).
-
An independent Resource for Yin Ironstones
Complex of 29.98Mt @ 1.04% TREO over only ~4.6kms – including a Measured and Indicated Resource of
26.3Mt @ 1.04% TREO (ASX 30 Nov 2023).
-
Regional source of rare earths at the Gifford Creek Carbonatite totaling ~17kms x ~1km (ASX 7 Aug 2023).
-
A large, independent initial Resource of 10.84Mt @ 1.00% TREO at the Gifford Creek Carbonatites, containing
a range of critical minerals including rare earths, niobium, phosphate, titanium and scandium (ASX 28 Aug 2023).
Bresnahan HREE-Au-U Project (100%)
Bresnahan is located ~125km southwest of Newman in the Ashburton Basin. The project comprises ~3,700kms2
covering over 200kms strike along the Bresnahan Basin / Wyloo Group unconformity. Bresnahan is prospective for
unconformity related heavy rare earth (“HREE”) deposits similar to Browns Range HREE deposits, unconformity
uranium (“U”) deposits and mesothermal lode gold similar to Paulsens Au-Ag-Sb deposits along strike.
Prior to consolidation by Dreadnought, the Bresnahan Basin had been successfully explored for unconformity
uranium with limited exploration for mesothermal gold. Bresnahan is a first mover opportunity to explore for
unconformity HREE.
Central Yilgarn Gold, Base Metals, Critical Minerals & Iron Ore Project (100%)
Central Yilgarn is located ~190km northwest of Kalgoorlie in the Yilgarn Craton. The project comprises ~1,400kms2
covering ~150km of strike along the majority of the Illaara, Yerilgee, South Elvire and Evanston greenstone belts.
Central Yilgarn is prospective for typical Archean mesothermal lode gold deposits, VMS base metals, komatiite hosted
nickel sulphides and critical metals including Lithium-Cesium-Tantalum.
Prior to consolidation by Dreadnought, the Central Yilgarn was predominantly held by iron ore explorers and
remains highly prospective for iron ore.
dreadnoughtresources.com.au
14
ASX:DRE
+61 (08) 9473 8345
info@dreres.com.au
Unit 1, 4 Burgay Court
Osborne Park WA 6017
ABN 40 119 031 864
Table 2: Drill Collar Data (GDA94 MGAz50)
Hole ID
Easting
Northing
CYRC001
763385
6721893
CYRC002
763386
6721894
CYRC003
763385
6721897
CYRC004
763386
6721896
CYRC005
763383
6721890
CYRC006
763385
6721890
CYRC007
762392
6722399
CYRC008
762554
6722383
CYRC009
748565
6713859
CYRC010
748533
6713894
CYRC011
748605
6713994
CYRC012
786469
6688997
CYRC013
786445
6688997
RL
420
423
424
424
421
420
441
439
427
428
430
466
467
Dip
-45
-60
-45
-60
-45
-60
-60
-75
-60
-60
-70
-60
-60
Azimuth
272
269
299
300
255
256
270
270
129
127
135
99
89
EOH
66
60
42
42
42
42
198
216
216
204
192
120
150
Type
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Prospect
Honey
Leghorn
Viper
Chicken Little
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling techniques
•
Laboratory Analysis
Two sampling techniques were utilised for the RC program,
1m metre splits directly from the rig sampling system for
each metre and 3m composite sampling from spoil piles.
Samples submitted to the laboratory were determined by
the site geologist.
•
•
•
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
1m Splits
From every metre drilled a 2-3kg sample (split) was subsampled into a calico bag via a Metzke cone splitter from
each metre of drilling or taken as a grab sample from the
bulk reject in more clay-rich material.
3m Composites
All remaining spoil from the sampling system was collected
in buckets or green plastic mining bags if wet from the
sampling system and neatly deposited in rows adjacent to
the rig. An aluminium scoop was used to then sub-sample
each spoil pile to create a 2-3kg 3m composite sample in a
calico bag.
QAQC samples consisting of duplicates, blanks, and CRM’s
(OREAS Standards) will be inserted through the program at
a rate of 1:50 samples.
All
Share your feedback
Discover