Shallow, Thick, High-Grades at Mangaroon incl 8m@16.2 g/t Au
Released
Released
Announcement PDF
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX ANNOUNCEMENT 25 August 2025
Shallow, Thick, High-Grades at Mangaroon including 8m @ 16.2 g/t Au
HIGHLIGHTS
• Assays have been received from 7 of 37 infill holes at Star of Mangaroon, all 3 of the first ever holes at the Lesgo
prospect and 9 holes at and around Popeye.
• The initial infill holes from the northern section of the Star of Mangaroon have returned shallow, thick, high-grade
intercepts including:
•
SOMRC062: 8m @ 16.2 g/t Au from 20m, incl: 3m @ 32.2 g/t Au from 20m
•
SOMRC060: 4m @ 15.0 g/t Au from 72m, incl: 2m @ 29.3 g/t Au from 72m
•
SOMRC056: 6m @ 3.8 g/t Au from 8m, incl. 1m @ 14.8 g/t Au from 9m
• Assays for the remaining 30 holes at Star of Mangaroon are expected in September 2025.
• The Lesgo structure can be traced in magnetics and mapping for >2.6kms. A surface geochemical survey has
commenced after first ever drilling confirmed shallow, high-grade bedrock mineralisation including:
•
LGRC001: 1m @ 7.4 g/t Au and 49.9g/t Ag from 22m
• The next RC drilling program at Mangaroon Au will commence in early September 2025.
Dreadnought Resources Ltd (“Dreadnought”) is pleased to announce assays from RC drilling
at the Mangaroon Gold Project (“Mangaroon”), in the Gascoyne region of WA.
Dreadnought’s Managing Director, Dean Tuck, commented: “We are thrilled to have received thick, high-grade results
from the most northern line at Star of Mangaroon, including shallow intercepts coming to surface. The infill grade control
drilling is holding together exceptionally well, and we look forward to receiving the remainder of the assays over the coming
weeks and the updated Resource following. Furthermore, as we head into a discovery focused drill program, it is great to have
early, high-grade bedrock mineralisation confirmed at Lesgo. Drilling is set to commence the first week of September 2025
and will test several new prospects as well as follow up on encouraging results from Steve’s Reward and Lesgo.”
Figure 1: Photo of RC drilling at Star of Mangaroon.
ASX:DRE
Dreadnought Resources Ltd 1
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Infill Drilling – Star of Mangaroon (100%)
(First right to develop with Black Cat Syndicate Ltd.)
This infill program comprises 37 RC holes (2,894m) and 4 diamond holes (308m) and brings drilling to a 10m x 10m
spacing within and around the current Resource (ASX 27 November 2024). All holes intersected the target lode horizon.
Assays have been received for the first 7 of the 37 holes and include:
•
SOMRC062: 8m @ 16.2 g/t Au from 20m, incl: 3m @ 32.2 g/t Au from 20m
•
SOMRC060: 4m @ 15.0 g/t Au from 72m, incl: 2m @ 29.3 g/t Au from 72m
•
SOMRC056: 6m @ 3.8 g/t Au from 8m, incl. 1m @ 14.8 g/t Au from 9m
These results have extended mineralisation to the north (SOMRC056 and SOMRC60) including in areas previously
thought to be mined out (SOMRC062). Importantly, these shallow results are expected to positively impact on the
current Resource of 23,300oz (56,600t @ 12.8 g/t Au) and consequently the already robust project economics (ASX
28 January 2025).
Results for the remaining 30 RC holes are expected in September 2025.
Figure 2: Plan view map showing the location of recently completed drilling (blue dots) at Star of Mangaroon.
ASX:DRE
Dreadnought Resources Ltd 2
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Lesgo prospect (100%)
Lesgo is defined by a ~2.6km long shear zone with evidence of mineralisation and alteration that was identified
through mapping. The Lesgo is located
on a recently granted tenement and 3 RC
holes (246m) were drilled in order to
assess
bedrock
alteration
and
mineralisation.
These first ever holes intersected a
package of sheared and altered chlorite
schist and orthogneiss with several
quartz veins and a mafic unit.
Mineralisation was intersected within a
base metal rich vein that was associated
with vanadium mica (roscoelite)
alteration
and
Au-Ag-Bi-Mo-Sb-Te
pathfinder anomalism. Encouragingly, an
intercept of was returned: 1m @ 7.4
g/t Au and 49.9g/t Ag from 22m.
This drilling was based on mapping alone
and not on a geochemical survey which
is now underway.
Lesgo has no previous exploration and
represents a new structure that can be
traced in magnetics and mapping for
>2.6kms.
Figure 3: Plan view map of Lesgo showing the
location of the 3 recent holes.
Figure 4: Cross section of the first ever drilling at Lesgo that confirmed shallow, high-grade bedrock mineralisation.
ASX:DRE
Dreadnought Resources Ltd 3
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Popeye
At and around Popeye, 9 RC discovery holes (738m) were drilled testing gold in soil anomalies. No significant
mineralisation was intersected and no further drilling is planned for Popeye at this time.
Dreadnought’s work plan summary
Star of Mangaroon
Open Pit
Mangaroon Drilling
Sep 2025 Quarter
Dec 2025 Quarter
Mining, Haul, Process Agreement
Approvals and Commencement of
Production
Star of Mangaroon extensions, Pritchard’s, McCarthy Workings, Steve’s Reward, Cullens,
Midday Moon, Nina, Lightening Ridge, Minga Bar and Edmund.
Mangaroon
Exploration
Bordah, High Range and Minga Bar
Illaara Drilling
(Aircore)
Metzke’s, Lawrence, SW BIF Horizon,
Black Oak – Homestead
Upcoming News
•
•
•
•
•
•
•
•
•
September: Drilling results from Star of Mangaroon
September Quarter: Update on Star of Mangaroon processing agreement
September: Commencement of discovery drilling at Mangaroon Au
September: Assay results from deep diamond drilling at Stinger Nb-REE
September: Results from geochemical survey at Lesgo
October: Presenting at the Australian Gold Conference, Sydney NSW
October/November: Results from discovery drilling at Mangaroon Au
October/November: Mineralogy results from diamond drilling at Stinger Nb-REE
November: Commencement of drilling at Illaara Gold Project
For further information please refer to previous ASX announcements:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
25 November 2020
15 March 2021
12 September 2022
7 June 2023
4 September 2023
11 December 2023
13 March 2024
26 July 2024
1 October 2024
14 October 2024
27 November 2024
28 January 2025
30 January 2025
18 March 2025
20 June 2025
Mangaroon Ni-Cu-PGE & Au Project
Exploration Commences at Mangaroon Ni-Cu-PGE & Au Project
Star of Mangaroon Acquisition & Consolidation
Mangaroon Gold Review and Further Consolidation
Outstanding Gold Opportunities Along >10km Mangaroon Shear Zone
Thick, High-Grade Gold Including 7m @ 23.0g/t Au
Star of Mangaroon Camp Scale Gold Prospect Expands to ~15km x 10km
Consolidation, Growth & Commercialisation
Shallow, High-Grades at Star of Mangaroon & Popeye
Exceptional Gold Recoveries from Star of Mangaroon
Shallow, High-Grade, 84% Indicated Au Resource
Robust Scoping Study for Star of Mangaroon
Further Consolidation and High-Grade Gold at Mangaroon
High Grade Gold Lode Extended
Star of Mangaroon Extended
~Ends~
For further information please contact:
Dean Tuck
Managing Director
Dreadnought Resources Limited
E: dtuck@dreres.com.au
Jessamyn Lyons
Company Secretary
Dreadnought Resources Limited
E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
ASX:DRE
Dreadnought Resources Ltd 4
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Snapshot – Mangaroon Gold (100%)
Mangaroon Gold is Large Scale
•
Mangaroon covers ~5,000kms2 with an initial focus on the gold system situated over the Mangaroon Shear Zone
between the crustal scale Minga Bar and Edmund Faults with multiple phases of intrusions. Numerous historical
workings along the Mangaroon Shear Zone have only seen limited drilling. This area also contains the ~12km x
6km Bordah and ~50km long High Range prospects where limited previous exploration has identified outcropping
gold and base metal mineralisation.
Self-Funded Explorer Strategy
•
Dreadnought’s strategy is to transform into a self-funded explorer. This involves a high-grade open pit at the Star
of Mangaroon where funding, development, haulage & processing are outsourced to third parties. This is a
common model in WA given the robust gold price. In this way, there is reduced reliance on market funding and
internal cashflows are aimed at making life-changing discoveries.
Consolidation Provides for First Ever Modern Exploration
•
All historical workings and known gold occurrences relate to outcropping mineralisation. There has been minimal
historical and modern exploration due to fractured, small-scale ownership with Dreadnought now undertaking
modern exploration for the first time.
Significant, Step-change, Growth Potential
•
Five historical mines developed on outcropping mineralisation and dozens of gold occurrences along highly
prospective structural corridors.
•
Dreadnought is deploying modern geochemical and geophysical techniques to explore for mineralisation under
shallow cover. These techniques have already generated new prospects with stronger and larger signatures than
the historical mines, including the region’s largest high-grade producer at the Star of Mangaroon mine.
•
Project-wide stream sediment sampling and geophysical surveys have identified additional camp scale prospects
at Bordah and High Range.
Shallow, High-grade Gold
•
The initial Resource at Star of Mangaroon contains shallow, high-grade gold as per Table 1 below:
Table 1: Resource (2g/t Au cut-off grade) - Numbers may not add up due to rounding.
Type
Transition
Fresh
Total
•
Indicated
Tonnes
1,900
42,500
44,400
Au (g/t)
26.9
13.0
13.6
Inferred
Au (Oz)
1,700
17,800
19,500
Tonnes
12,200
12,200
Au (g/t)
9.8
9.8
Total
Au (Oz)
3,900
3,900
Tonnes
1,900
54,700
56,600
Au (g/t)
26.9
12.3
12.8
Au (Oz)
1,700
21,700
23,400
Also, Popeye, located <1km from the Star of Mangaroon, contains significant shallow high-grade gold including:
POPRC001: 3m @ 22.8 g/t Au from 13m POPRC002: 1m @ 1.6 g/t Au, 15.5g/t Ag from 11m
Exceptional Metallurgical Recoveries
•
The region is known for its free gold. Accordingly, metallurgical work at Star of Mangaroon produced exceptional
recoveries from standard gravity and carbon in leach circuits averaging 96.7% combined recovery including an
average 74.4% gravity recovery (ASX 14 Oct 2024).
ASX:DRE
Dreadnought Resources Ltd 5
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forward-looking
information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual
results and developments will almost certainly differ materially from those expressed or implied. There are a number of risks, both specific to
Dreadnought, and of a general nature which may affect the future operating and financial performance of Dreadnought, and the value of an investment
in Dreadnought including and not limited to title risk, renewal risk, economic conditions, stock market fluctuations, commodity demand and price
movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve
estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and mining development, construction and commissioning risk.
Competent Person’s Statement – Mineral Resources
The information in this announcement that relates to the Star of Mangaroon Mineral Resource is based on information compiled by Mr. Paul Payne, a
Competent Person who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr. Payne is a full-time employee of Payne Geological Services
Pty Ltd and is a shareholder of Dreadnought Resources Limited. Mr. Payne has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity that is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves’. Mr. Payne consents to the inclusion in the announcement
of the matters based on his information in the form and context that the information appears.
Competent Person’s Statement – Exploration Results
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled by Mr. Dean Tuck,
who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the
announcement of the matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information included in the original market
announcements by Dreadnought Resources Limited referenced in this report and in the case of Mineral Resources, Production Targets, forecast financial
information and Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. To the extent disclosed above, the Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcements.
GOLD RESOURCES AT MANGAROON AU
Star of Mangaroon – Indicated and Inferred Resources
Table 2: Resource (2g/t Au cut-off grade) - Numbers may not add up due to rounding
Type
Transition
Fresh
Total
ASX:DRE
Indicated
Tonnes
1,900
42,500
44,400
Au (g/t)
26.9
13.0
13.6
Inferred
Au (Oz)
1,700
17,800
19,500
Tonnes
12,200
12,200
Au (g/t)
9.8
9.8
Total
Au (Oz)
3,900
3,900
Tonnes
1,900
54,700
56,600
Au (g/t)
26.9
12.3
12.8
Au (Oz)
1,700
21,700
23,400
Dreadnought Resources Ltd 6
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Table 3: Drill Collar Data (GDA94 MGAz50) and Significant Intercepts (>0.1g/t Au)
Hole ID
LGRC001
SOMRC056
Including
SOMRC057
SOMRC058
SOMRC059
And
SOMRC060
Including
SOMRC061
SOMRC062
Including
SOMRC063
SOMRC064
SOMRC065
SOMRC066
SOMRC067
SOMRC068
SOMRC069
SOMRC070
SOMRC071
SOMRC072
SOMRC073
SOMRC074
SOMRC075
SOMRC076
SOMRC077
SOMRC078
SOMRC079
SOMRC080
SOMRC081
SOMRC082
SOMRC083
SOMRC084
SOMRC085
SOMRC086
SOMRC087
SOMRC088
SOMRC089
SOMRC090
SOMRC091
SOMRC092
ASX:DRE
From
22
8
9
35
42
63
68
72
72
87
20
20
To
23
14
10
38
43
64
69
76
74
88
28
23
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Assays
Interval (m)
1
6
1
3
1
1
1
4
2
1
8
3
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Grade (g/t Au)
7.4
3.8
14.8
2.0
2.2
7.7
1.2
15.1
29.3
2.6
16.2
32.2
Prospect
Lesgo
Star of Mangaroon
Dreadnought Resources Ltd 7
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Table 4: Drill Collar Data (GDA94 MGAz50)
Hole ID
LGRC001
LGRC002
LGRC003
POPDD001
POPRC017
POPRC018
POPRC019
POPRC020
POPRC021
POPRC022
POPRC023
POPRC024
POPRC025
SOMDD010
SOMDD011
SOMDD012
SOMDD013
SOMRC056
SOMRC057
SOMRC058
SOMRC059
SOMRC060
SOMRC061
SOMRC062
SOMRC063
SOMRC064
SOMRC065
SOMRC066
SOMRC067
SOMRC068
SOMRC069
SOMRC070
SOMRC071
SOMRC072
SOMRC073
SOMRC074
SOMRC075
SOMRC076
SOMRC077
SOMRC078
SOMRC079
SOMRC080
SOMRC081
SOMRC082
SOMRC083
SOMRC084
SOMRC085
SOMRC086
SOMRC087
SOMRC088
SOMRC089
SOMRC090
SOMRC091
SOMRC092
ASX:DRE
Easting
371144
371179
371214
372599
372583
372543
372501
372574
372705
372665
372625
372279
372310
372318
372404
372364
372386
372325
372345
372360
372370
372378
372396
372332
372350
372365
372378
372390
372309
372352
372365
372373
372402
372312
372335
372349
372366
372395
372406
372315
372352
372380
372315
372370
372411
372351
372363
372378
372393
372404
372370
372386
372401
372335
Northing
7364218
7364235
7364254
7359436
7359031
7359034
7359035
7359406
7359693
7359694
7359695
7359603
7359635
7359775
7359784
7359779
7359826
7359830
7359827
7359826
7359830
7359829
7359826
7359809
7359809
7359808
7359808
7359807
7359758
7359755
7359751
7359755
7359753
7359771
7359772
7359764
7359766
7359770
7359771
7359781
7359779
7359771
7359788
7359780
7359777
7359790
7359787
7359789
7359787
7359787
7359798
7359791
7359809
7359795
RL
301
301
299
288
285
286
285
283
282
281
282
289
289
283
282
282
290
291
288
288
288
288
289
283
282
284
284
283
284
284
283
283
286
283
283
283
283
284
272
274
276
273
273
274
272
272
272
272
272
272
273
273
272
273
Dip
-60
-60
-60
-61
-60
-60
-60
-58
-58
-60
-60
-61
-60
-60
-60
-59
-60
-60
-58
-60
-60
-60
-60
-61
-60
-60
-60
-61
-60
-60
-60
-60
-60
-60
-61
-60
-60
-61
-60
-59
-60
-59
-59
-59
-59
-59
-59
-60
-60
-60
-59
-59
-58
-60
Azi
246
244
245
168
189
86
92
69
97
90
92
228
225
304
273
276
271
280
291
281
284
279
280
282
281
280
283
282
311
283
284
283
282
307
286
283
283
282
283
309
282
281
283
279
280
280
279
279
280
281
278
281
287
285
EOH
82
82
82
20
82
82
82
82
82
82
82
82
82
24
110
79
95
28
70
82
88
88
112
46
58
82
94
106
22
72
90
96
114
24
54
72
84
86
120
24
66
90
30
78
120
66
84
102
96
102
84
102
114
48
Type
RC
RC
RC
DDH
RC
RC
RC
RC
RC
RC
RC
RC
RC
DDH
DDH
DDH
DDH
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Prospect
Lesgo
Popeye
Star of
Mangaroon
Dreadnought Resources Ltd 8
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling techniques
•
Reverse Circulation (RC) drilling was undertaken to produce
samples for assay.
•
•
•
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed information.
RC Drilling
Two sampling techniques were utilised for the RC drilling, 1m
metre splits directly from the rig sampling system for each
metre and 3m composite sampling from spoil piles. Samples
submitted to the laboratory were determined by the site
geologist.
1m Splits
From every metre drilled a 2-3kg sample (split) was subsampled into a calico bag via a Metzke cone splitter from each
metre of drilling.
3m Composites
All remaining spoil from the sampling system was collected in
buckets from the sampling system and neatly deposited in
rows adjacent to the rig. An aluminium scoop was used to
then sub-sample each spoil pile to create a 2-3kg 3m
composite sample in a calico bag.
A pXRF is used on site to help determine mineralised samples.
Mineralised intervals have the 1m split collected, while
unmineralised samples have 3m composites collected.
All samples are submitted to ALS Laboratories in Perth for
determination of gold by Photon assay from crushed sample
(ALS Method Au-PA01).
Select samples are also submitted for 48 multi-elements via 4
acid digestion with MS/ICP finish (ALS Code ME-MS61) to
assist with lithological interpretation.
QAQC samples consisting of duplicates, blanks and CRM’s
(OREAS Standards) are inserted through the program at a
rate of 1:50 samples.
Drilling techniques
Drill sample recovery
•
•
•
•
Logging
•
•
•
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
RC Drilling
Drilling was completed by Precision Exploration Drilling
(PXD) utilising a KWL 350 truck mounted drill rig with
additional air from an auxiliary compressor and booster. Bit
size was 5¾“.
RC Drilling
Drilling was undertaken using a ‘best practice’ approach to
achieve maximum sample recovery and quality through the
mineralised zones.
Best practice sampling procedure included: suitable usage of
dust suppression, suitable shroud, lifting off bottom between
each metre, cleaning of sampling equipment, ensuring a dry
sample and suitable supervision by the supervising geologist
to ensure good sample quality.
RC Drilling
RC chips were logged under the supervision of a Senior
Geologist with sufficient experience in this geological terrane
and relevant styles of mineralisation using an industry standard
logging system which could eventually be utilised within a
Mineral Resource Estimation.
Lithology, mineralisation, alteration, veining, weathering and
texture were all recorded digitally.
Chips were washed each metre and stored in chip trays for
preservation and future reference.
RC pulp material is also analysed on the rig by pXRF to assist
with logging and the identification of mineralisation.
RC logging is qualitative, quantitative or semi-quantitative in
nature.
Sub-sampling
techniques and sample
preparation
•
•
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc.
RC Drilling
From every metre drilled, a 2-3kg sample (split) was subsampled into a calico bag via a Metzke cone splitter.
QAQC in the form of duplicates and CRM’s (OREAS
ASX:DRE
Dreadnought Resources Ltd 9
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Criteria
JORC Code explanation
•
•
•
•
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
Commentary
Standards) were inserted through the ore zones at a rate of
1:50 samples. Additionally, within mineralised zones, a
duplicate sample was taken and a blank inserted directly after.
2-3kg samples are submitted to ALS laboratories (Perth),
oven dried to 105°C and crushed to >90% passing 3mm to
produce a 500g charge for determination of gold by Photon
Assay from crushed sample (ALS Method Au-PA01).
Additional material is then pulverised to 85% passing 75um to
produce a 0.25g charge for determination of 48 multielements via 4 acid digestion with MS/ICP finish (ALS Code
ME-MS61).
Standard laboratory QAQC is undertaken and monitored.
Quality of assay data
and laboratory tests
•
•
•
Verification of
sampling and assaying
•
•
•
•
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Laboratory Analysis
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Logging and Sampling
Photon Assay is considered a total analysis and Method AuPA01 is appropriate for Au determination. ME-MS61 is
considered a near total digest and is appropriate for
pathfinder determination.
Standard laboratory QAQC is undertaken and monitored by
the laboratory and by the company upon assay result
receival.
Logging and sampling were recorded directly into a digital
logging system, verified and eventually stored in an offsite
database.
Significant intersections are inspected by senior company
personnel.
No diamond twinning has been undertaken at this time. .
No adjustments to any assay data have been undertaken.
Additional 1m splits have been sent to the lab for the 3m
composites that have returned mineralisation.
Location of data points
•
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Collar position was recorded using a Emlid Reach RS2 RTK
GPS system (+/- 0.3m x/y, +/-0.5m z).
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
See table 3 and 4 for hole positions and sampling information.
Drilling was undertaken at a near perpendicular angle to the
interpreted strike and dip of the mineralised lode.
•
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
Sample security
•
The measures taken to ensure sample security.
All geochemical samples were collected, bagged, and sealed
by Dreadnought staff and were delivered directly to ALS
Laboratories Perth by Jarrahbar Contracting or Exmouth
Haulage out of Carnarvon or Exmouth.
Audits or reviews
•
The results of any audits or reviews of sampling techniques
and data.
The program is continuously reviewed by senior company
personnel.
•
•
Data spacing and
distribution
•
•
•
Orientation of data in
relation to geological
structure
ASX:DRE
•
GDA94 Z50s is the grid format for all xyz data reported.
Azimuth and dip of the drill hole was recorded by PXD after
the completion of the hole using an Axis Champ Gyro. A
reading was undertaken every 20th metre with an accuracy of
+/- 0.75° azimuth and +/-0.15° dip.
Data spacing at this stage is not suitable for Mineral Resource
Estimation.
No sample bias is known at this time.
Dreadnought Resources Ltd 10
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Section 2 Reporting of Exploration Results
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Mineral tenement and
land tenure status
•
The Mangaroon Project consists of 22 granted Exploration
License (E08/3178, E08/3229, E08/3274, E08/3275,
E08/3439, E09/2195, E09/2290, E09/2359, E09/2370,
E09/2384, E09/2405, E09/2422, E09/2433, E09/2448,
E09/2449, E09/2450, E09/2467, E09/2473, E09/2478,
E09/2479, E09/2535, E09/2616), 1 pending Exploration
License (E08/3539) and 6 granted Mining Licenses (M09/63,
M09/91, M09/146, M09/147, M09/174, M09/175).
All tenements are 100% owned by Dreadnought Resources.
E08/3178, E09/2370, E09/2384, E09/2433, E08/3274
Share your feedback
Discover