Shallow Gold in First Drilling at Steves Reward - Mangaroon
Released
Released
Announcement PDF
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
ASX ANNOUNCEMENT 24 July 2025
Shallow Gold in First Drilling at Steve’s Reward - Mangaroon (100%)
HIGHLIGHTS
• Assays have been received from RC discovery drilling at Steve’s Reward (15 Holes, 1,140m) and Inevitable (4
holes, 166m).
• This was the first drilling program ever undertaken in the area.
• Steve’s Reward drilling was most encouraging with multiple veins coming to surface in a discovery program aimed
at surface lodes. A total of 8 out of the 15 holes returned significant results including:
SRRC001: 4m @ 4.1 g/t Au from 6m, including: 2m @ 6.8 g/t Au from 7m
SRRC001: 3m @ 2.1 g/t Au from 48m
SRRC003: 1m @ 3.7 g/t Au from 17m
SRRC012: 3m @ 2.9 g/t Au from 7m
SRRC004: 1m @ 4.5 g/t Au from 6m
SRRC011: 3m @ 1.3 g/t Au from 42m
SRRC011: 2m @ 1.3 g/t Au from 32m
• A recently completed surface geochemical survey at Steve’s Reward has defined a large gold-in-soil anomaly
(>~2,600m x ~600m) that remains open along strike. Significantly, the strongest anomaly is located ~500m
northwest of the above drilling including one of the highest gold-in-soil values to date of 770ppb Au.
• Drilling will recommence at Steve’s Reward in September 2025 following up on both the above drilling and
anomaly testing.
Dreadnought Resources Ltd (“Dreadnought”) is pleased to announce assays from RC drilling
at Steve’s Reward and Inevitable, part of the 100% owned Mangaroon Gold Project
(“Mangaroon”), in the Gascoyne region of WA.
Dreadnought’s Managing Director, Dean Tuck, commented: “Steve’s Reward is off to a great start with significant shallow
gold mineralisation intersected in 8 out of the first 15 holes ever drilled there. On the back of our recently announced gold-insoil anomalies, Steve’s Reward is rapidly growing, showing scale potential. Exploring for a major gold discovery at Mangaroon
is a key pillar of the Finding More Gold, Faster strategy. Drilling will recommence at Steve’s Reward in September 2025,
following the completion of our current infill drilling program at the Star of Mangaroon. We look forward to following up on
these drill intercepts at depth and along strike but also testing the extents of the large geochemical anomaly.”
Figure 1: Photo of the RC rig at Steve’s Reward.
ASX:DRE
Dreadnought Resources Ltd 1
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Steve’s Reward (100%)
Steve’s Reward is hosted by metasediments, volcanics and chemical formations of the 2.4Ga Leake Spring
Metamorphics in proximity to the Magweera and Jimmy Well shear zones. Both zones are splays off the crustal scale
Minga Bar Fault. The occurrence of major structural splays and host rocks with significant chemical and rheological
contrasts is prospective for orogenic gold.
An outcropping gold lode was identified in 1996 producing significant rock chip results, up to 116g/t Au (*123105) over
80m in strike, however, no further work or drilling was undertaken.
Steve’s Reward has recently been defined by a ~2,600m x 600m gold-in-soil anomaly with several subcropping gold
veins highlighting that mineralisation comes to surface with little to no cover. The gold-in-soil anomaly remains open
along strike.
First ever lode drilling at Steve’s Reward intersected multiple veins coming to surface with 8 out of the 15 holes
returning results including:
SRRC001: 4m @ 4.1 g/t Au from 6m, including: 2m @ 6.8 g/t Au from 7m
SRRC001: 3m @ 2.1 g/t Au from 48m
SRRC003: 1m @ 3.7 g/t Au from 17m
SRRC012: 3m @ 2.9 g/t Au from 7m
SRRC004: 1m @ 4.5 g/t Au from 6m
SRRC011: 3m @ 1.3 g/t Au from 42m
SRRC011: 2m @ 1.3 g/t Au from 32m
Significantly, the strongest gold-in-soil anomaly is located ~500m to the northwest of the lode drilling.
Drilling will recommence at Steve’s Reward in September 2025 following up the drill results and anomaly testing.
Figure 2: Plan view image of the gold-in-soil anomaly at Steve’s Reward in relation to recent lode drilling highlighting significant drill results.
ASX:DRE
Dreadnought Resources Ltd 2
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Figure 3: Cross section through Steve’s Reward showing the location of mineralised lodes in relation to general lithology.
Figure 4: Cross section through Steve’s Reward showing the location of mineralised lodes in relation to general lithology.
Inevitable (100%)
Inevitable was defined by 4 strong EM conductors covering ~900m of strike. Follow up mapping identified ~200m of
subcropping gossan.
A total of 4 RC holes (166m) were drilled testing the 4 EM conductors with each hole returning base metal anomalism.
Down hole EM surveys confirm that the targets have been tested. No further work is planned for Inevitable at this
time.
This program was co-funded by a competitive Exploration Incentive Scheme drilling grant of ~$120,000 from the
Geological Survey of Western Australia.
ASX:DRE
Dreadnought Resources Ltd 3
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Dreadnought’s work plan summary
Star of Mangaroon
Open Pit
Mangaroon Drilling
Sep 2025 Quarter
Dec 2025 Quarter
Mining, Haul, Process Agreement
Approvals and Commencement of
Production
Star of Mangaroon extensions, Popeye, Pritchard’s, McCarthy Workings,
Steve’s Reward, Cullens, Midday Moon, Nina, Lightening Ridge, Minga Bar and Edmund.
Mangaroon
Exploration
Bordah, High Range and Minga Bar
Illaara Drilling
(Aircore)
Metzke’s, Lawrence, SW BIF Horizon,
Black Oak – Homestead
Upcoming News
•
•
•
•
•
•
•
•
•
25th July: Presenting at the Noosa Mining Conference, Noosa QLD
29th July: Quarterly Hubinar - Online
August: Drilling results from Popeye and Star of Mangaroon
4-6th August: Attending Diggers and Dealers Mining Forum, Kalgoorlie WA
August: Completion of drilling at Mangaroon
September: Drilling results from Star of Mangaroon
September Quarter: Update on Star of Mangaroon Processing Agreement
September: Recommencement of gold drilling at Mangaroon
October: Presenting at the Australian Gold Conference, Sydney NSW
For further information please refer to previous ASX announcements:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
25 November 2020
15 March 2021
17 May 2021
12 September 2022
7 June 2023
4 September 2023
11 December 2023
13 March 2024
26 July 2024
26 July 2024
1 October 2024
14 October 2024
27 November 2024
28 January 2025
30 January 2025
18 March 2025
20 June 2025
23 June 2025
Mangaroon Ni-Cu-PGE & Au Project
Exploration Commences at Mangaroon Ni-Cu-PGE & Au Project
Update on Mangaroon Ni-Cu-PGE & Au Project
Star of Mangaroon Acquisition & Consolidation
Mangaroon Gold Review and Further Consolidation
Outstanding Gold Opportunities Along >10km Mangaroon Shear Zone
Thick, High-Grade Gold Including 7m @ 23.0g/t Au
Star of Mangaroon Camp Scale Gold Prospect Expands to ~15km x 10km
Strategic & Prospective Consolidation
Consolidation, Growth & Commercialisation
Shallow, High-Grades at Star of Mangaroon & Popeye
Exceptional Gold Recoveries from Star of Mangaroon
Shallow, High-Grade, 84% Indicated Au Resource
Robust Scoping Study for Star of Mangaroon
Further Consolidation and High-Grade Gold at Mangaroon
High Grade Gold Lode Extended
Star of Mangaroon Extended
Gold Drilling Commenced at Mangaroon
~Ends~
For further information please contact:
Dean Tuck
Managing Director
Dreadnought Resources Limited
E: dtuck@dreres.com.au
Jessamyn Lyons
Company Secretary
Dreadnought Resources Limited
E: jlyons@dreres.com.au
This announcement is authorised for release to the ASX by the Board of Dreadnought.
ASX:DRE
Dreadnought Resources Ltd 4
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Snapshot – Mangaroon Gold (100%)
Mangaroon Gold is Large Scale
•
Mangaroon covers ~5,000kms2 with an initial focus on the gold system situated over the Mangaroon Shear Zone
between the crustal scale Minga Bar and Edmund Faults with multiple phases of intrusions. Numerous historical
workings along the Mangaroon Shear Zone have only seen limited drilling. This area also contains the ~12km x
6km Bordah and ~50km long High Range prospects where limited previous exploration has identified outcropping
gold and base metal mineralisation.
Self-Funded Explorer Strategy
•
Dreadnought’s strategy is to transform into a self-funded explorer. This involves a high-grade open pit at the Star
of Mangaroon where funding, development, haulage & processing are outsourced to third parties. This is a
common model in WA given the robust gold price. In this way, there is reduced reliance on market funding and
internal cashflows are aimed at making life-changing discoveries.
Consolidation Provides for First Ever Modern Exploration
•
All historical workings and known gold occurrences relate to outcropping mineralisation. There has been minimal
historical and modern exploration due to fractured, small-scale ownership with Dreadnought now undertaking
modern exploration for the first time.
Significant, Step-change, Growth Potential
•
Five historical mines developed on outcropping mineralisation and dozens of gold occurrences along highly
prospective structural corridors.
•
Dreadnought is deploying modern geochemical and geophysical techniques to explore for mineralisation under
shallow cover. These techniques have already generated new prospects with stronger and larger signatures than
the historical mines, including the region’s largest high-grade producer at the Star of Mangaroon mine.
•
Project-wide stream sediment sampling and geophysical surveys have identified additional camp scale prospects
at Bordah and High Range.
Shallow, High-grade Gold
•
The initial Resource at Star of Mangaroon contains shallow, high-grade gold as per Table 1 below:
Table 1: Resource (2g/t Au cut-off grade) - Numbers may not add up due to rounding.
Type
Transition
Fresh
Total
•
Indicated
Tonnes
1,900
42,500
44,400
Au (g/t)
26.9
13.0
13.6
Inferred
Au (Oz)
1,700
17,800
19,500
Tonnes
12,200
12,200
Au (g/t)
9.8
9.8
Total
Au (Oz)
3,900
3,900
Tonnes
1,900
54,700
56,600
Au (g/t)
26.9
12.3
12.8
Au (Oz)
1,700
21,700
23,400
Also, Popeye, located <1km from the Star of Mangaroon, contains significant shallow high-grade gold including:
POPRC001: 3m @ 22.8 g/t Au from 13m POPRC002: 1m @ 1.6 g/t Au, 15.5g/t Ag from 11m
Exceptional Metallurgical Recoveries
•
The region is known for its free gold. Accordingly, metallurgical work at Star of Mangaroon produced exceptional
recoveries from standard gravity and carbon in leach circuits averaging 96.7% combined recovery including an
average 74.4% gravity recovery (ASX 14 Oct 2024).
ASX:DRE
Dreadnought Resources Ltd 5
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Cautionary Statement
This announcement and information, opinions or conclusions expressed in the course of this announcement contains forecasts and forward-looking
information. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual
results and developments will almost certainly differ materially from those expressed or implied. There are a number of risks, both specific to
Dreadnought, and of a general nature which may affect the future operating and financial performance of Dreadnought, and the value of an investment
in Dreadnought including and not limited to title risk, renewal risk, economic conditions, stock market fluctuations, commodity demand and price
movements, timing of access to infrastructure, timing of environmental approvals, regulatory risks, operational risks, reliance on key personnel, reserve
estimations, native title risks, cultural heritage risks, foreign currency fluctuations, and mining development, construction and commissioning risk.
Competent Person’s Statement – Mineral Resources
The information in this announcement that relates to the Star of Mangaroon Mineral Resource is based on information compiled by Mr. Paul Payne, a
Competent Person who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr. Payne is a full-time employee of Payne Geological Services
Pty Ltd and is a shareholder of Dreadnought Resources Limited. Mr. Payne has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity that is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves’. Mr. Payne consents to the inclusion in the announcement
of the matters based on his information in the form and context that the information appears.
Competent Person’s Statement – Exploration Results
The information in this announcement that relates to geology, exploration results and planning, and exploration targets was compiled by Mr. Dean Tuck,
who is a Member of the AIG, Managing Director, and shareholder of the Company. Mr. Tuck has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Tuck consents to the inclusion in the
announcement of the matters based on the information in the form and context in which it appears.
The Company confirms that it is not aware of any further new information or data that materially affects the information included in the original market
announcements by Dreadnought Resources Limited referenced in this report and in the case of Mineral Resources, Production Targets, forecast financial
information and Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. To the extent disclosed above, the Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcements.
GOLD RESOURCES AT MANGAROON AU
Star of Mangaroon – Indicated and Inferred Resources
Table 2: Resource (2g/t Au cut off grade) - Numbers may not add up due to rounding
Type
Transition
Fresh
Total
ASX:DRE
Indicated
Tonnes
1,900
42,500
44,400
Au (g/t)
26.9
13.0
13.6
Inferred
Au (Oz)
1,700
17,800
19,500
Tonnes
12,200
12,200
Au (g/t)
9.8
9.8
Total
Au (Oz)
3,900
3,900
Tonnes
1,900
54,700
56,600
Au (g/t)
26.9
12.3
12.8
Au (Oz)
1,700
21,700
23,400
Dreadnought Resources Ltd 6
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Table 3: Drill Collar Data (GDA94 MGAz50) and Significant Intercepts (>0.1g/t Au)
Hole ID
Easting
Northing
RL
Dip
Azi
EOH
Type
From
To
SRRC001
340535
7366219
277
-59
180
82
SRRC002
SRRC003
340510
340511
7366114
7366153
273
274
-60
-60
180
180
82
82
SRRC004
SRRC005
SRRC006
SRRC007
SRRC008
SRRC009
SRRC010
SRRC011
340510
340534
340377
340378
340381
340381
340382
340380
7366190
7366208
7365945
7365987
7366028
7366066
7366108
7366150
274
276
269
270
271
273
273
274
-60
-60
-60
-60
-60
-60
-59
-59
180
39
182
183
14
177
181
184
82
28
82
82
88
82
82
82
6
7
54
48
17
41
6
2
10
9
57
51
18
43
7
3
SRRC012
340373
7366184
272
-60
180
82
SRRC013
SRRC014
SRRC015
340340
340343
340358
7366221
7366263
7366172
276
274
272
-59
-60
-60
178
181
2
82
82
40
RC
Including
and
RC
RC
and
RC
RC
RC
RC
RC
RC
RC
RC
and
RC
including
and
RC
RC
RC
32
42
7
8
75
34
45
10
9
78
21
24
Interval
(m)
4
2
3
3
1
2
1
1
NSR
NSR
NSR
NSR
NSR
2
3
3
1
3
NSR
NSR
3
Grade
(g/t Au)
4.1
6.8
2.1
0.1
3.7
1.1
4.5
0.4
Prospect
Steve’s
Reward
1.3
1.3
2.9
7.4
0.5
0.1
Table 4: Drill Collar Data (GDA94 MGAz50) and Significant Intercepts (>0..1% Cu, Pb, Zn, or 0.1g/t Au)
Hole ID
Easting
Northing
RL
Dip
Azi
EOH
Type
From
To
IVRC001
IVRC002
IVRC003
IVRC004
336885
336520
336600
336798
7364325
7363995
7363990
7364286
275
270
270
274
-60
-59
-60
-60
333
330
326
331
42
42
42
40
RC
RC
RC
RC
22
28
33
21
28
29
34
25
Int.
(m)
6
1
1
4
Cu
(%)
0.3
0.5
Pb
(%)
0.1
0.1
0.3
0.1
Zn
(%)
0.1
0.1
Ag
Au
(g/t)
(g/t)
0.8
1.5
7.9
1.5
0.2
-
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling techniques
•
Reverse Circulation (RC) drilling was undertaken to produce
samples for assay.
•
•
•
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed information.
RC Drilling
Two sampling techniques were utilised for the RC drilling, 1m
metre splits directly from the rig sampling system for each
metre and 3m composite sampling from spoil piles. Samples
submitted to the laboratory were determined by the site
geologist.
1m Splits
From every metre drilled a 2-3kg sample (split) was subsampled into a calico bag via a Metzke cone splitter from each
metre of drilling.
3m Composites
All remaining spoil from the sampling system was collected in
buckets from the sampling system and neatly deposited in
rows adjacent to the rig. An aluminium scoop was used to
then sub-sample each spoil pile to create a 2-3kg 3m
composite sample in a calico bag.
A pXRF is used on site to help determine mineralised samples.
Mineralised intervals have the 1m split collected, while
unmineralised samples have 3m composites collected.
All samples are submitted to ALS Laboratories in Perth for
determination of gold by Fire assay from crushed sample (ALS
Method Au-ICP22).
ASX:DRE
Dreadnought Resources Ltd 7
Prospect
Inevitable
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Criteria
JORC Code explanation
Commentary
Select samples are also submitted for 48 multi-elements via 4
acid digestion with MS/ICP finish (ALS Code ME-MS61) to
assist with lithological interpretation.
QAQC samples consisting of duplicates, blanks and CRM’s
(OREAS Standards) are inserted through the program at a
rate of 1:50 samples.
Drilling techniques
Drill sample recovery
•
•
•
•
Logging
•
•
•
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
RC Drilling
Drilling was completed by Precision Exploration Drilling
(PXD) utilising a KWL 350 truck mounted drill rig with
additional air from an auxiliary compressor and booster. Bit
size was 5¾“.
RC Drilling
Drilling was undertaken using a ‘best practice’ approach to
achieve maximum sample recovery and quality through the
mineralised zones.
Best practice sampling procedure included: suitable usage of
dust suppression, suitable shroud, lifting off bottom between
each metre, cleaning of sampling equipment, ensuring a dry
sample and suitable supervision by the supervising geologist
to ensure good sample quality.
RC Drilling
RC chips were logged under the supervision of a Senior
Geologist with sufficient experience in this geological terrane
and relevant styles of mineralisation using an industry standard
logging system which could eventually be utilised within a
Mineral Resource Estimation.
Lithology, mineralisation, alteration, veining, weathering and
texture were all recorded digitally.
Chips were washed each metre and stored in chip trays for
preservation and future reference.
RC pulp material is also analysed on the rig by pXRF, and
magnetic susceptibility meter to assist with logging and the
identification of mineralisation.
RC logging is qualitative, quantitative or semi-quantitative in
nature.
Sub-sampling
techniques and sample
preparation
•
•
•
•
•
•
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
RC Drilling
From every metre drilled, a 2-3kg sample (split) was subsampled into a calico bag via a Metzke cone splitter.
QAQC in the form of duplicates and CRM’s (OREAS
Standards) were inserted through the ore zones at a rate of
1:50 samples. Additionally, within mineralised zones, a
duplicate sample was taken and a blank inserted directly after.
2-3kg samples are submitted to ALS laboratories (Perth),
oven dried to 105°C and crushed to >90% passing 3mm to
produce a 50g charge for determination of gold by Fire Assay
from crushed sample (ALS Method Au-ICP22).
Additional material is then pulverised to 85% passing 75um to
produce a 0.25g charge for determination of 48 multielements via 4 acid digestion with MS/ICP finish (ALS Code
ME-MS61).
Standard laboratory QAQC is undertaken and monitored.
Quality of assay data
and laboratory tests
•
•
•
Verification of
sampling and assaying
ASX:DRE
•
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Laboratory Analysis
The verification of significant intersections by either
independent or alternative company personnel.
Logging and Sampling
Fire Assay is considered a total analysis and Method Au-ICP22
is appropriate for Au determination. ME-MS61 is considered
a near total digest and is appropriate for pathfinder
determination.
Standard laboratory QAQC is undertaken and monitored by
the laboratory and by the company upon assay result
receival.
Logging and sampling were recorded directly into a digital
Dreadnought Resources Ltd 8
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Criteria
JORC Code explanation
Commentary
•
•
logging system, verified and eventually stored in an offsite
database.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
•
Significant intersections are inspected by senior company
personnel.
No diamond twinning has been undertaken at this time. .
No adjustments to any assay data have been undertaken.
Additional 1m splits have been sent to the lab for the 3m
composites that have returned mineralisation. And all
mineralised intervals will be reassayed by PhotonAssay
Technique.
Location of data points
•
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Collar position was recorded using a Emlid Reach RS2 RTK
GPS system (+/- 0.3m x/y, +/-0.5m z).
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
See table 3 and 4 for hole positions and sampling information.
Drilling was undertaken at a near perpendicular angle to the
interpreted strike and dip of the mineralised lode.
•
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
Sample security
•
The measures taken to ensure sample security.
All geochemical samples were collected, bagged, and sealed
by Dreadnought staff and were delivered directly to ALS
Laboratories Perth by Jarrahbar Contracting or Exmouth
Haulage out of Carnarvon or Exmouth.
Audits or reviews
•
The results of any audits or reviews of sampling techniques
and data.
The program is continuously reviewed by senior company
personnel.
•
•
Data spacing and
distribution
•
•
•
Orientation of data in
relation to geological
structure
•
GDA94 Z50s is the grid format for all xyz data reported.
Azimuth and dip of the drill hole was recorded by PXD after
the completion of the hole using an Axis Champ Gyro. A
reading was undertaken every 20th metre with an accuracy of
+/- 0.75° azimuth and +/-0.15° dip.
Data spacing at this stage is not suitable for Mineral Resource
Estimation.
No sample bias is known at this time.
At this early stage of exploration, mineralisation true
thickness’s, orientation and dips are not known.
Section 2 Reporting of Exploration Results
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Mineral tenement and
land tenure status
•
The Mangaroon Project consists of 22 granted Exploration
License (E08/3178, E08/3229, E08/3274, E08/3275,
E08/3439, E09/2195, E09/2290, E09/2359, E09/2370,
E09/2384, E09/2405, E09/2422, E09/2433, E09/2448,
E09/2449, E09/2450, E09/2467, E09/2473, E09/2478,
E09/2479, E09/2535, E09/2616), 1 pending Exploration
License (E08/3539) and 6 granted Mining Licenses (M09/63,
M09/91, M09/146, M09/147, M09/174, M09/175).
All tenements are 100% owned by Dreadnought Resources.
E08/3178, E09/2370, E09/2384, E09/2433, E08/3274,
E08/3275, E09/2433, E09/2448, E09/2449, E09/2450 are
subject to a 1% Gross Revenue Royalty held by Beau
Resources.
E09/2359 is subject to a 1% Gross Revenue Royalty held by
Prager Pty Ltd.
E09/2422, E08/*3229 and E08/3539 are subject to a 1%
Gross Revenue Royalty held by Redscope Enterprises Pty
Ltd.
E09/2290, M09/146 and M09/147 are subject to a 1% Gross
Revenue Royalty held by STEHN, Anthony Paterson and
BROWN, Michael John Barry.
E09/2497 is subject to a 1% net smelter royalty held by Nina
•
ASX:DRE
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.
Dreadnought Resources Ltd 9
Unit 1, 4 Burgay Court,
Osborne Park, WA 6017
+61 8 9473 8345
info@dreres.com.au
www.dreadnoughtresources.com.au
Criteria
JORC Code explanation
Exploration done by
other parties
•
Acknowledgment and appraisal of exploration by other
parties.
Geology
•
Deposit type, geological setting and style of mineralisation.
Drill hole information
•
•
Data aggregation
methods
•
•
•
Relationship between
mineralisation widths
and intercept lengths
•
•
•
ASX:DRE
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azi
Share your feedback
Discover